You are on page 1of 1

PT.

SUMBER WAHANA SEJATI


DRILLING LOGS SUKABUMI
SOIL INVESTIGATION BH-01

Coordinates :- Driller : Apendi


Start Date : 04/10/2020
Ground Level :- Finish Date : 07/10/2020
Depth of Hole : 20.00 m Logged By :
GWL : -4.20 m

Thickness ( m )
Elevation ( m )

SPT SPT Diagram Sample No.


Depth ( m )
Layer No.

Legend Description N - Value / 30 cm


Depth Blow Count
N Depth ( m )
(m)
N0 N1 N2 10 20 30 40 50 60
0.00 - 2.45 m :
LANAU Lempung pasiran, coklat,
1.0 konsistensi lunak.
2.45 UDS1 (50.0 cm)

2.0 1.50 - 2.00

-2.45 2.00 - 2.45 1 2 2 4

3.0 2.45 - 6.45 m :


LANAU Lempung pasir kerikilan,
coklat, konsistensi lunak - sedang. UDS2 (50.0 cm)

4.0 3.50 - 4.00


4.00 - 4.45 1 2 2 4
4.00
5.0

6.0
-6.45 6.00 - 6.45 1 2 6 8
6.45 - 7.50 m :
7.0 LANAU Lempung pasiran, coklat,
1.05
-7.50 konsistensi sedang - keras.

8.0
7.50 - 10.45 m : 8.00 - 8.13 50/13 >50
LEMPUNG sisipan batu bolder, abu
9.0 kehitaman, konsistensi keras -
2.95 sangat keras.
DS1 (50.0 cm)

10.0 9.50 - 10.00

-10.45 10.00 - 10.45 18 19 21 40


10.45 - 20.00 m :
11.0 LEMPUNG, abu-abu, konsistensi
keras - sangat keras.

12.0
12.00 - 12.45 10 14 18 32

13.0
DS2 (50.0 cm)

14.0 13.50 - 14.00


14.00 - 14.40 17 29 35/10 >50

15.0
9.55

16.0
16.00 -16.35 18 34 10/5 >50

17.0

18.0
18.00 - 18.37 17 28 38/7 >50

19.0
DS3 (50.0 cm)

-20.00 20.0 19.50 - 20.00


-40,00

Page 1 BH-01

You might also like