Sakhuwa Engineering Consultancy Pvt. Ltd.

Imadole-6, Lalitpur

Project Name: Siraha Lahan Khane Pani Sansthan Bore Hole No: 1, d/s
Location: Lahan Sishir Khola Date: 2077/10/27

Borehole Log Sheet


DCPT/ SPT

Total recorded SPT


Water level (m)
Thickness (m) No. of Blows
Sample UD
per

depth (m)
Symbol

Type

Value
SOIL DESCRIPTION penetration
SPT (N Value) vs depth

DCPT 10 20 30
SPT 15 30 45 20 40 60 80
0.0 m 0.0 m
Medium dense, coarse
1.5 1.0 m
sand with fine gravels
SPT 10 13 14 27
1.5 m
2.0 m
Buolder and gravel 1.5 50
DCPT 5 - - >50
3.0 m 3.0 m
water level was observed at 1.4 m

4.0 m
SPT 12 15 19 34
4.5 m
5.0 m
50
SPT 12 - - >50
6.0 m 6.0 m

50
7.0 m
Dense to very dense silty SPT 10 - - >50
9.0 7.5 m
fine sand
8.0 m
50
SPT 5 - - >50
9.0 m 9.0 m
50
10.0 m SPT 7 - - >50
10.5 m
11.0 m 50
SPT 6 - - >50
End of Borehole at 12.0 m depth 12.0 m 12.0 m

Prepared By: Checked By: Approved By:


Sakhuwa Engineering Consultancy Pvt. Ltd.
Imadole-6, Lalitpur

Project Name: Siraha Lahan Khane Pani Sansthan Bore Hole No: 2
Location: Lahan Sishir Khola Date: 2077/11/01

Borehole Log Sheet


DCPT/ SPT

Total recorded SPT


Water level (m)
Thickness (m) No. of Blows UD
Sample
per

depth (m)
Symbol

Type

Value
SOIL DESCRIPTION penetration
SPT (N Value) vs depth

DCPT 10 20 30
20 40 60 80
0.0 m water level was observed at 1.0 m SPT 15 30 45 0.0 m

1.0 m
Very dense sand with DCPT 32 32 34 >50 1.5 m
3.0
gravel and boulder 2.0 m

DCPT 29 32 37 >50
3.0 m 3.0 m

4.0 m
Dense to very dense silty SPT 12 15 19 34
3.0 4.5 m
fine sand
5.0 m
50
SPT 6 - - >50
End of Borehole at 6.0 m depth 6.0 m 6.0 m

Prepared By: Checked By: Approved By:


Sakhuwa Engineering Consultancy Pvt. Ltd.
Imadole-6, Lalitpur

Project Name: Siraha Lahan Khane Pani Sansthan Bore Hole No: 3
Location: Lahan Sishir Khola Date: 2077/11/04

Borehole Log Sheet


DCPT/ SPT

Total recorded SPT


Water level (m)
Thickness (m) No. of Blows UD
Sample
per

depth (m)
Symbol

Type

Value
SOIL DESCRIPTION penetration
SPT (N Value) vs depth

DCPT 10 20 30
20 40 60 80
0.0 m water level was observed at 1.0 m SPT 15 30 45 0.0 m

1.0 m 50
Very dense sand with DCPT 17 6 - >50 1.5 m
3.0
gravel 2.0 m

DCPT 17 9 14 27
3.0 m 3.0 m

4.0 m
Dense to very dense silty SPT 13 19 22 41
3.0 4.5 m
fine sand
5.0 m
50
SPT 5 - - >50
End of Borehole at 6.0 m depth 6.0 m 6.0 m

Prepared By: Checked By: Approved By:


Kathmandu, Nepal
Contact: 9851219947
E-mail: primecivillab@gmail.com

Project Name: Dilgaad Motorable Bridge Project Bore Hole No: 2 (mid)
Location: Jayprithivi Municipality, Ward No-5, Bajhang Date: 2020/09/28
Prepared For: Sugi Consultant Pvt. Ltd.

Borehole Log Sheet


DCPT/ SPT

Total recorded SPT


Water table (m)
No. of Blows
Thickness (m)

Sample UD
per
depth (m)
Symbol

Type

Value
SOIL DESCRIPTION penetration
SPT (N Value) vs depth

DCPT 10 20 30
20 40 60 80
0.0 m SPT 15 30 45 0.0 m

1.0 m
DCPT 13 15 18 31 1.5 m
2.0 m
Dense sand with gravel 4.5
3.0 m DCPT 10 22 27 39 3.0 m

4.0 m
DCPT 16 30 35 46
4.5 m
5.0 m
50
DCPT 28 39 5 >50
water table was not observed

6.0 m 6.0 m
Very Dense sand with
4.5 50
gravel 7.0 m
DCPT 40 7 - >50
7.5 m
8.0 m
50
DCPT 44 27 3 >50
9.0 m 9.0 m

50
10.0 m
DCPT 4 - - >50
10.5 m
11.0 m
50
DCPT 2 - - >50
12.0 m 12.0 m
Very dense sand with
7.0
boulder 50
13.0 m
DCPT 32 7 - >50
13.5 m
14.0 m
50
DCPT 46 5 - >50
15.0 m DCPT 15.0 m
50
8 - - >50
End of Borehole at 16.0 m depth 16.0 m

Prepared By: Checked By: Approved By:


Kathmandu, Nepal
Contact: 9851219947
E-mail: primecivillab@gmail.com

Project Name: Dilgaad Motorable Bridge Project Bore Hole No: 3 (right)
Location: Jayprithivi Municipality, Ward No-5, Bajhang Date: 2020/10/01
Prepared For: Sugi Consultant Pvt. Ltd.

Borehole Log Sheet


DCPT/ SPT

Total recorded SPT


Water table (m)
No. of Blows
Thickness (m)

Sample UD
per
depth (m)
Symbol

Type

Value
SOIL DESCRIPTION penetration
SPT (N Value) vs depth

DCPT 10 20 30
40 60 80
0.0 m SPT 15 30 45 0.0 m

1.0 m
DCPT 16 20 31 45 1.5 m
Dense sand with boulder 3.0
2.0 m

3.0 m DCPT 18 23 33 49 3.0 m

4.0 m
DCPT - - - >50
4.5 m
5.0 m

DCPT - - - >50
water table was not observed

6.0 m 6.0 m

7.0 m
DCPT - - - >50
7.5 m
8.0 m

DCPT - - - >50
9.0 m 9.0 m
Rock 13.0
10.0 m
DCPT - - - >50
10.5 m
11.0 m

DCPT - - - >50
12.0 m 12.0 m

13.0 m
DCPT - - - >50
13.5 m
14.0 m

DCPT - - - >50
15.0 m DCPT 15.0 m
- - - >50
End of Borehole at 16.0 m depth 16.0 m

Prepared By: Checked By: Approved By: