You are on page 1of 2

Government of Nepal

Ministry of Physical Infrasructure and Transport

Department of Roads

Bridge Branch

1st_Running Bill

Feasibility Study, Detailed Engineering Survey,Soil Investigation, Hydrological Study and Detailed Design of Bridge(s):
Bridge Wise Allocation of BoQ Quantity
As Per BoQ
Aathsaini/Saur Khola, SKT Biureni Khola, SKT Takchi-Sakya-Gyau Khola, Humla Chheda Khola, Jajarkot Jhyali khet Bridge, Jajarkot Jhilke Khola, Dailekh Sutiya Nadi-

SN Particulars

As Per BoQ

As Per BoQ

As Per BoQ

As Per BoQ

As Per BoQ

As Per BoQ

As Per BoQ
Measured

Measured

Measured
Measured

Measured

Measured
Billing Billing Billing Billing Billing

Amount

Amount

Amount

Amount

Amount

Amount
Billing Amount

Qtty

Qtty

Qtty

Qtty
Qtty

Qtty
Unit Qty Rate Amount Amount Amount Amount Amount Amount
(NRs)
(NRs) (NRs) (NRs) (NRs) (NRs)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1 Detailed Engineering Survey, Soil Investigationand Detailed Design of Bridges
Detailed Engineering Survey and detailed design of
bridges including desk study, collection of data, maps
and other information, planning of works (desk
study), general reconnaissance, feasibility study,
geological and geomorphologic study, field survey,
topographic survey, site selection, environmental
1.1 study, detailed hydrometric and hydrological study, No 10.00 750000.00 7500000.00 1.00 750000.00 0.15 112500.00 1.00 750000.00 0.15 112500.00 1.00 750000.00 0.05 37500.00 1.00 750000.00 0.15 112500.00 1.00 750000.00 0.15 112500.00 1.00 750000.00 0.15 112500.00 1.00
preliminary soil investigation in test pits,
transportation of personnel and equipment, detailed
design works, preparation of drawings, cost estimates,
reports etc. all complete as per ToR.

1.2 Soil Investigation


Drilling of Bore Holes and carrying out
specified field and laboratory tests including
transportation of personnel and equipment,
1.2.1 analysis, reporting etc. as per ToR 0 to 20 m in
clayey, sandy soils & gravel mixed soils
(Type_1)

Number of Bore Holes 30.00


Drilling 0 to 25 m in Clayey, Sandy and Gravel
a rm 300.00 6600.00 1980000.00 . 75.00
Mixed soils (Type_1)
Drilling 0 to 20 m in gravel, pebbles, cobbles &
b rm 360.00 8000.00 2880000.00 60.00 480000.00 72000.00 60.00 480000.00 72000.00 60.00 480000.00 24000.00 60.00 480000.00 72000.00 60.00 480000.00 72000.00 60.00 480000.00 72000.00
boulders, soft and hard rock (Type_2)
Providing professional liability insurance as per
2 LS 1.00 64200.00 64200.00 0.10 6420.00 0.015 963.00 0.10 6420.00 0.015 963.00 0.10 6420.00 0.005 321.00 0.10 6420.00 0.015 963.00 0.10 6420.00 0.015 963.00 0.10 6420.00 0.015 963.00 0.10
RFP documents
Presentation, Reporting, Meeting allowance and
3 LS 1.00 400000.00 400000.00 0.10 40000.00 0.015 6000.00 0.10 40000.00 0.015 6000.00 0.10 40000.00 0.005 2000.00 0.10 40000.00 0.015 6000.00 0.10 40000.00 0.015 6000.00 0.10 40000.00 0.015 6000.00 0.10
all other expenses as per ToR

Subtotal 12824200.00 1276420.00 191463.00 1276420.00 191463.00 1276420.00 63821.00 1276420.00 191463.00 1276420.00 191463.00 1276420.00 191463.00

15% of the contract amount after


submission of Inception Report and
terminated at this stage (Contract
Amount)

Deduction of Previous Commulative


Amount of running bills
Total Payable amount at This stage

VAT @ 13%
Grand Total

Signature of the Consultant:

Date:
Seal:
Government of Nepal
Ministry of Physical Infrasructure and Transport

Department of Roads

Bridge Branch

1st_Running Bill

Feasibility Study, Detailed Engineering Survey,Soil Investigation, Hydrological Study and Detailed Design of Bridge(s):
Bridge Wise Allocation of BoQ Quantity
Sutiya Nadi-Mahakali Sugar Mill, Kanchanpur Kharaula Pul-Lamki, Kailali Sutiya Nadi Pul-Khairighat, Kanchanpur Naya Kuloma Pakki Pul-Laljhadi, Kanchanpur Total Amount (excluding VAT)

SN Particulars

As Per BoQ

As Per BoQ

As Per BoQ
Measured

Measured

Measured

Measured
Billing Billing Billing

Amount

Amount

Amount

Amount
Billing Amount

Qtty

Qtty

Qtty
Qtty
Amount Amount Amount As Per BoQ Net Payable Amount
(NRs)
(NRs) (NRs) (NRs)

1 2 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
1 Detailed Engineering Survey, Soil Investigationand Detailed Design of Bridges
Detailed Engineering Survey and detailed design of
bridges including desk study, collection of data, maps
and other information, planning of works (desk
study), general reconnaissance, feasibility study,
geological and geomorphologic study, field survey,
topographic survey, site selection, environmental
1.1 study, detailed hydrometric and hydrological study, 750000.00 0.05 37500.00 1.00 750000.00 0.15 112500.00 1.00 750000.00 0.15 112500.00 1.00 750000.00 0.15 112500.00 7500000.00 975000.00
preliminary soil investigation in test pits,
transportation of personnel and equipment, detailed
design works, preparation of drawings, cost estimates,
reports etc. all complete as per ToR.

1.2 Soil Investigation


Drilling of Bore Holes and carrying out
specified field and laboratory tests including
transportation of personnel and equipment,
1.2.1 analysis, reporting etc. as per ToR 0 to 20 m in
clayey, sandy soils & gravel mixed soils
(Type_1)

Number of Bore Holes


Drilling 0 to 25 m in Clayey, Sandy and Gravel
a 495000.00 24750.00 75.00 495000.00 74250.00 75.00 495000.00 74250.00 75.00 495000.00 74250.00 1980000.00 247500.00
Mixed soils (Type_1)
Drilling 0 to 20 m in gravel, pebbles, cobbles &
b 2880000.00 384000.00
boulders, soft and hard rock (Type_2)
Providing professional liability insurance as per
2 6420.00 0.005 321.00 0.10 6420.00 0.015 963.00 0.10 6420.00 0.015 963.00 0.10 6420.00 0.015 963.00 64200.00 8346.00
RFP documents
Presentation, Reporting, Meeting allowance and
3 40000.00 0.005 2000.00 0.10 40000.00 0.015 6000.00 0.10 40000.00 0.015 6000.00 0.10 40000.00 0.015 6000.00 400000.00 52000.00
all other expenses as per ToR

Subtotal 1291420.00 64571.00 1291420.00 193713.00 1291420.00 193713.00 1291420.00 193713.00 12824200.00 1666846.00
15% of the contract amount after
submission of Inception Report and
terminated at this stage (Contract 1666846.00
Amount)

Deduction of Previous Commulative


Amount of running bills 0

Total Payable amount at This stage


1666846.00

VAT @ 13% 216689.98


Grand Total 1883535.98

Signature of the Consultant:

Date:
Seal:

You might also like