BORE LOG

Bore No. : BH - 32 GPS (UTM) X = 674422.092


Project : Pembangunan Fly Over Pengganti JPL KM 38+897 lintas Surabaya-Solo Y = 9180307.326
Client : - Diameter of Bore : 73 mm
Location : Krian, Kab Sidoarjo Diameter of Casing : 89 mm
STA : - Date Start : 20 - 08 - 2022
GWL : -2.70 M Finish : 22 - 08 - 2022

N2 (15-30)

N3 (30-45)
N1 (0-15)

(N2+N3)
Standard Penetration Test

N-SPT
DEPTH BORE UDS Depth
VISUAL DESCRIPTION COLOUR
LOG (SPT) SPT Depth
(m) N / 30 cm
0 20 40 60 80
0
Lanau kelempungan Coklat

1.50 - 2.00 m UDS


2 5
GWL 2.00 - 2.45 m SPT 1 /15 2 /15 3 /15 5
Pasir halus Abu-Abu
3
kelanauan Coklat
3.50 - 4.00 m UDS
4 8 4.00 - 4.45 m SPT 2 /15 3 /15 5 /15 8
5

Pasir kelanauan Hitam 5.50 - 6.00 m UDS


6 16
6.00 - 6.45 m SPT 5 /15 7 /15 9 /15 16
7

7.50 - 8.00 m UDS


8 15
8.00 - 8.45 m SPT 4 /15 6 /15 9 /15 15
Pasir halus Coklat
9
kelanauan
9 9.50 - 10.00 m UDS
10
10.00 - 10.45 m SPT 3 /15 4 /15 5 /15 9
11
Lanau kelempungan Coklat
6 Abu-Abu 11.50 - 12.00 m UDS
12
12.00 - 12.45 m SPT 2 /15 2 /15 4 /15 6
13

Lanau kelempungan Coklat 13.50 - 14.00 m UDS


14 17
berpasir halus Hitam 14.00 - 14.45 m SPT 3 /15 7 /15 10 /15 17
15
Pasir Hitam
15.50 - 16.00 m UDS
16 2
16.00 - 16.45 m SPT 1 /15 1 /15 1 /15 2
Lanau kelempungan Coklat
17
berpasir halus Hitam
17.50 - 18.00 m UDS
18 3
18.00 - 18.45 m SPT 1 /15 1 /15 2 /15 3
Lanau kelempungan Abu-Abu
19
Coklat
19.50 - 20.00 m UDS
20 4
Lanau kelempungan Abu-Abu 20.00 - 20.45 m SPT 1 /15 2 /15 2 /15 4
organik Hitam
21

21.50 - 22.00 m UDS


22 5
22.00 - 22.45 m SPT 1 /15 2 /15 3 /15 5
23

23.50 - 24.00 m UDS


24 2
24.00 - 24.45 m SPT 1 /15 1 /15 1 /15 2
25

Lanau kelempungan Abu-Abu 25.50 - 26.00 m UDS


26 3
Hitam 26.00 - 26.45 m SPT 1 /15 1 /15 2 /15 3
27

4 27.50 - 28.00 m UDS


28
28.00 - 28.45 m SPT 1 /15 1 /15 3 /15 4
29

6 29.50 - 30.00 m UDS


30
30.00 - 30.45 m SPT 2 /15 2 /15 4 /15 6
BORE LOG
Bore No. : BH - 32 GPS (UTM) X = 674422.092
Project : Pembangunan Fly Over Pengganti JPL KM 38+897 lintas Surabaya-Solo Y = 9180307.326
Client : - Diameter of Bore : 73 mm
Location : Krian, Kab Sidoarjo Diameter of Casing : 89 mm
STA : - Date Start : 20 - 08 - 2022
GWL : -2.70 M Finish : 22 - 08 - 2022

N2 (15-30)

N3 (30-45)
N1 (0-15)

(N2+N3)
Standard Penetration Test

N-SPT
DEPTH BORE UDS Depth
VISUAL DESCRIPTION COLOUR
LOG (SPT) SPT Depth
(m) N / 30 cm
0 20 40 60 80
30

31

Lanau kelempungan Abu-Abu 31.50 - 32.00 m UDS


32 7
Hitam 32.00 - 32.45 m SPT 2 /15 3 /15 4 /15 7
33

33.50 - 34.00 m UDS


34 23
34.00 - 34.45 m SPT 8 /15 10 /15 13 /15 23
35

Lanau kelempungan Abu-Abu 35.50 - 36.00 m UDS


36 47
sedikit kerikil Hitam 36.00 - 36.45 m SPT 10 /15 21 /15 26 /15 47
37
Lanau kelempungan Abu-Abu
Hitam 37.50 - 38.00 m UDS
38 22
38.00 - 38.45 m SPT 6 /15 9 /15 13 /15 22
39
Lanau kelempungan Coklat
18 39.50 - 40.00 m UDS
40
40.00 - 40.45 m SPT 5 /15 8 /15 10 /15 18
41

20 41.50 - 42.00 m UDS


42
42.00 - 42.45 m SPT 6 /15 8 /15 12 /15 20
Lanau kelempungan Coklat
43
sedikit pasir halus
43.50 - 44.00 m UDS
44 22
44.00 - 44.45 m SPT 7 /15 9 /15 13 /15 22
45

45.50 - 46.00 m UDS


46 27
46.00 - 46.45 m SPT 6 /15 11 /15 16 /15 27
47

Pasir halus Hitam 47.50 - 48.00 m UDS


48 36
48.00 - 48.45 m SPT 9 /15 16 /15 20 /15 36
49

49.50 - 50.00 m UDS


50 25
50.00 - 50.45 m SPT 6 /15 10 /15 15 /15 25