Professional Documents
Culture Documents
STA 11+475
Project JEMBATAN CIBITUNG - CILINCING Type of Drilling Continues Coring Coordinat
Location Perumahan Panorama Mutiara Regency Driller Andre X 0729849
Date 8 - 10 Nopember 2017 Supervisor Ihlasul Y 9314839
GWL 4.2 m Z
N2 (15-30CM)
N3 (30-45CM)
N1 (0-15CM)
SPT Curve Soil Laboratory Results
N-SPT
Depth
0.0
0.5
1.0
1.5
2.5
3.0
5.0
7.0
7.5
9.0
9.5
10.5
11.0
13.0
13.5
15.0
15.5
17.0
17.5
19.0
19.5
N2 (15-30CM)
N3 (30-45CM)
N1 (0-15CM)
SPT Curve Soil Laboratory Results
N-SPT
Depth
20.5
21.0
21.5
23.0
23.5
25.0
25.5
27.0
27.5
29.0
29.5
31.0
31.5
32.5
33.0
33.5