BORING LOG

PROJECT NAME : JALAN TOL CIBITUNG CILINCING LOCATION : PONCOL


BORE HOLE NO. : DB. 30 STA. 29 + 000 DRILLER : TANU
GROUND ELEVATION : DATE STARTED : 25 / 10 / 2007
GROUND WATER LEVEL : - 01.00 m DATE FINISHED : 30 / 10 / 2007
STANDARD PENETRATION TEST

Core Recovery

N2 ( 15 - 30 )
N3 ( 30 - 45 )
N1 ( 0 - 15 )

N VALUE
Boring Log

(%)
Depth (m)

Sampling

1,50 m Ticknesh
Soil Description
Date

Unit

10 20 30 40 50

1
95 Clayey silt, very soft, brown.
1,50 m

2
1 1 1 1 2

4
2 01 01
45 45
7,90 m

5
95 Clayey silt, very soft, dark grey.
1
6 01 01
3
45 45
7

8 01 01
4
45 45
9 9,40 m
2
10
5 1 1 1 2
3,10 m

Clayey silt, medium soft to medium stiff,


11 95
light grey.
12
6 12,50 m 2 4 6 10

13

14
7 5 7 8 15
5,00 m

15 90 Silty clay, stiff, yellowish grey.

16
8 7 9 10 19

17
17,50 m

18
9 19 30 49
05 20
19
5,00 m

20 90 Cemented silt, hard, brown.


10 20 35 55
10 25
21

22
11 22,50 m 18 29 34 63

23
7,95 m

24
12 80 Sand, very dense, brown. 45 45
10 10
25

Ground Water Level M'd 30 / 10 / 2007 Tn


LEGEND

PT. BINA KARYA Undistrurbed Sample D'r 02 / 10 / 2007 Tg Sheet 1 of 2


JAKARTA
Standard Penetration Test C'h 02 / 10 / 2007 Kd
BORING LOG
PROJECT NAME : JALAN TOL CIBITUNG CILINCING LOCATION : PONCOL
BORE HOLE NO. : DB. 30 STA. 29 + 000 DRILLER : TANU
GROUND ELEVATION : DATE STARTED : 25 / 10 / 2007
GROUND WATER LEVEL : - 01.00 m DATE FINISHED : 30 / 10 / 2007
STANDARD PENETRATION TEST

Core Recovery

N2 ( 15 - 30 )
N3 ( 30 - 45 )
N1 ( 0 - 15 )

VALUE
Boring Log

(%)
Depth (m)

Sampling

Ticknesh
Soil Description
Date

Unit

10 20 30 40 50

N
26
13 18 27 31 58

27
7,95 m

80 Sand, very dense, brown.


28
14 19 28 32 60

29

30
15 19 28 34 62

31
END OF HOLE : 30.45 M GL

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

Ground Water Level M'd 30 / 10 / 2007 Tn


LEGEND

PT. BINA KARYA Undistrurbed Sample D'r 02 / 10 / 2007 Tg Sheet 2 of 2


JAKARTA
Standard Penetration Test C'h 02 / 10 / 2007 Kd