STA 11+125
Project JEMBATAN CIBITUNG - CILINCING Type of Drilling Continues Coring Coordinat
Location Panorama Mutiara Regency, Cibitung - Bekasai Driller Iyus X 0729958
Date 17 - 19 Nopember 201 Supervisor Silam Y 9314500
GWL 6.0 m Z
N2 (15-30CM)
N3 (30-45CM)
N1 (0-15CM)
SPT Curve Soil Laboratory Results
N-SPT
Depth
0.0
0.5
1.0
3.0
3.5
5.0
5.5
7.0
8.5
9.0
9.5
11.0
11.5
13.0
15.0
15.5
17.0
17.5
18.5
19.0
19.5
N2 (15-30CM)
N3 (30-45CM)
N1 (0-15CM)
SPT Curve Soil Laboratory Results
N-SPT
Depth
20.5
21.0
21.5
23.0
23.5
25.0
25.5
26.5
27.0
27.5
29.0
29.5
31.0
31.5
33.0
33.5