You are on page 1of 7

BORE LOG

Bore No. : BH - 6 GPS (UTM) X = 746346.000


Project : Jalan Lingkar Selatan Kab. Sampang Y = 9202260.000
Client : - Diameter of Bore : 73 mm
Location : Kab. Sampang Diameter of Casing : 89 mm
STA : 1 + 800 Date Start : 21 - 01 - 2022
GWL : - Finish : 22 - 01 - 2022

N2 (15-30)

N3 (30-45)
N1 (0-15)

(N2+N3)
Standard Penetration Test

N-SPT
DEPTH BORE UDS Depth
VISUAL DESCRIPTION COLOUR
LOG (SPT) SPT Depth
(m) N / 30 cm
0 20 40 60 80
0

1
Lanau kelempungan Coklat

1.50 - 2.00 m UDS


2 1
2.00 - 2.45 m SPT 0 /15 0 /15 1 /15 1
3
Lanau kelempungan Coklat
kulit kerang
3.50 - 4.00 m UDS
4 1
4.00 - 4.45 m SPT 0 /15 0 /15 1 /15 1
5

6 1 Lanau kelempungan Coklat 5.50 - 6.00 m UDS


6.00 - 6.45 m SPT 0 /15 0 /15 1 /15 1
7

7.50 - 8.00 m UDS


8 3
8.00 - 8.45 m SPT 1 /15 1 /15 2 /15 3
9
7
9.50 - 10.00 m UDS
10
10.00 - 10.45 m SPT 3 /15 3 /15 4 /15 7
11
9 Lanau kelempungan Coklat 11.50 - 12.00 m UDS
12
Abu-Abu 12.00 - 12.45 m SPT 3 /15 4 /15 5 /15 9
13

13.50 - 14.00 m UDS


14 8
14.00 - 14.45 m SPT 3 /15 4 /15 4 /15 8
15

15.50 - 16.00 m UDS


16 9
16.00 - 16.45 m SPT 2 /15 4 /15 5 /15 9
17

17.50 - 18.00 m UDS


18 10
18.00 - 18.45 m SPT 4 /15 5 /15 5 /15 10
19

19.50 - 20.00 m UDS


20 11
20.00 - 20.45 m SPT 4 /15 5 /15 6 /15 11
21
Lanau kelempungan Coklat
Abu-Abu
21.50 - 22.00 m UDS
22 12
22.00 - 22.45 m SPT 5 /15 6 /15 6 /15 12
23

23.50 - 24.00 m UDS


24 11
24.00 - 24.45 m SPT 4 /15 5 /15 6 /15 11
25

25.50 - 26.00 m UDS


26 13
26.00 - 26.45 m SPT 5 /15 6 /15 7 /15 13
27
Lanau kelempungan Abu-Abu

27.50 - 28.00 m UDS


28 12
28.00 - 28.45 m SPT 6 /15 5 /15 7 /15 12
29

29.50 - 30.00 m UDS


30 17
30.00 - 30.45 m SPT 6 /15 8 /15 9 /15 17
BORE LOG
Bore No. : BH - 6 GPS (UTM) X = 746346.000
Project : Jalan Lingkar Selatan Kab. Sampang Y = 9202260.000
Client : - Diameter of Bore : 73 mm
Location : Kab. Sampang Diameter of Casing : 89 mm
STA : 1 + 800 Date Start : 21 - 01 - 2022
GWL : - Finish : 22 - 01 - 2022

N2 (15-30)

N3 (30-45)
N1 (0-15)

(N2+N3)
Standard Penetration Test

N-SPT
DEPTH BORE UDS Depth
VISUAL DESCRIPTION COLOUR
LOG (SPT) SPT Depth
(m) N / 30 cm
0 20 40 60 80
30

31

16 31.50 - 32.00 m UDS


32
32.00 - 32.45 m SPT 5 /15 7 /15 9 /15 16
33

34 18 Lempung kelanauan Abu-Abu 33.50 - 34.00 m UDS


34.00 - 34.45 m SPT 6 /15 8 /15 10 /15 18
35

35.50 - 36.00 m UDS


36 19
36.00 - 36.45 m SPT 7 /15 8 /15 11 /15 19
37

37.50 - 38.00 m UDS


38 18
38.00 - 38.45 m SPT 7 /15 9 /15 9 /15 18
39

20 39.50 - 40.00 m UDS


40
40.00 - 40.45 m SPT 7 /15 9 /15 11 /15 20
41

22 41.50 - 42.00 m UDS


42
42.00 - 42.45 m SPT 8 /15 10 /15 12 /15 22
43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60
TABEL PERHITUNGAN DAYA DUKUNG 1 (SATU) TIANG PONDASI

Type : Driven Pile Bor Hole : BH - 6


Diameter : 400 mm SF : 3

Qp Qs QL (ton) P (ton)
Depth (m) N N' N'' Np K qp Ap a Ns1 Ns qs As b
(ton) (ton) (Qp+Qs) (QL/SF)
-2.00 1 8 1.0 1.0 20 20 0.126 1.00 2.5 3.0 3.0 2.0 2.51 1.00 5.0 7.5 2.5
-4.00 1 8 1.0 1.0 20 20 0.126 1.00 2.5 3.0 3.0 2.0 5.03 1.00 10.1 12.6 4.2
-6.00 1 8 1.0 1.7 20 33 0.126 1.00 4.2 3.0 3.0 2.0 7.54 1.00 15.1 19.3 6.4
-8.00 3 9 3.0 3.7 20 73 0.126 1.00 9.2 3.0 3.0 2.0 10.05 1.00 20.1 29.3 9.8
-10.00 7 11 7.0 6.3 20 127 0.126 1.00 15.9 7.0 3.8 2.3 12.57 1.00 28.5 44.4 14.8
-12.00 9 12 9.0 8.0 20 160 0.126 1.00 20.1 9.0 4.7 2.6 15.08 1.00 38.5 58.6 19.5
-14.00 8 11.5 8.0 8.7 20 173 0.126 1.00 21.8 8.0 5.1 2.7 17.59 1.00 47.8 69.5 23.2
-16.00 9 12 9.0 9.0 20 180 0.126 1.00 22.6 9.0 5.6 2.9 20.11 1.00 57.8 80.4 26.8
-18.00 10 12.5 10.0 10.0 20 200 0.126 1.00 25.1 10.0 6.1 3.0 22.62 1.00 68.7 93.8 31.3
-20.00 11 13 11.0 11.0 20 220 0.126 1.00 27.6 11.0 6.6 3.2 25.13 1.00 80.4 108.1 36.0
-22.00 12 13.5 12.0 11.3 20 227 0.126 1.00 28.5 12.0 7.1 3.4 27.65 1.00 93.0 121.5 40.5
-24.00 11 13 11.0 12.0 20 240 0.126 1.00 30.2 11.0 7.4 3.5 30.16 1.00 104.7 134.9 45.0
-26.00 13 14 13.0 12.0 20 240 0.126 1.00 30.2 13.0 7.8 3.6 32.67 1.00 118.1 148.3 49.4
-28.00 12 13.5 12.0 13.7 20 273 0.126 1.00 34.3 12.0 8.1 3.7 35.19 1.00 130.7 165.0 55.0
-30.00 17 16 16.0 14.5 20 290 0.126 1.00 36.4 17.0 8.7 3.9 37.70 1.00 147.4 183.9 61.3
-32.00 16 15.5 15.5 16.0 12 192 0.126 1.00 24.1 16.0 9.2 4.1 40.21 1.00 163.4 187.5 62.5
-34.00 18 16.5 16.5 16.3 12 196 0.126 1.00 24.6 18.0 9.7 4.2 42.73 1.00 181.0 205.6 68.5
-36.00 19 17 17.0 16.7 12 200 0.126 1.00 25.1 19.0 10.2 4.4 45.24 1.00 199.4 224.5 74.8
-38.00 18 16.5 16.5 17.0 12 204 0.126 1.00 25.6 18.0 10.6 4.5 47.75 1.00 217.0 242.6 80.9
-40.00 20 17.5 17.5 17.5 12 210 0.126 1.00 26.4 20.0 11.1 4.7 50.27 1.00 236.2 262.6 87.5
-42.00 22 18.5 18.5 18.0 12 216 0.126 1.00 27.1 22.0 11.6 4.9 52.78 1.00 257.2 284.3 94.8
TABEL PERHITUNGAN DAYA DUKUNG 1 (SATU) TIANG PONDASI

Type : Driven Pile Bor Hole : BH - 6


Diameter : 500 mm SF : 3

Qp Qs QL (ton) P (ton)
Depth (m) N N' N'' Np K qp Ap a Ns1 Ns qs As b
(ton) (ton) (Qp+Qs) (QL/SF)
-2.00 1 8 1.0 1.0 20 20 0.196 1.00 3.9 3.0 3.0 2.0 3.14 1.00 6.3 10.2 3.4
-4.00 1 8 1.0 1.5 20 30 0.196 1.00 5.9 3.0 3.0 2.0 6.28 1.00 12.6 18.5 6.2
-6.00 1 8 1.0 2.6 20 52 0.196 1.00 10.2 3.0 3.0 2.0 9.42 1.00 18.8 29.1 9.7
-8.00 3 9 3.0 4.2 20 84 0.196 1.00 16.5 3.0 3.0 2.0 12.57 1.00 25.1 41.6 13.9
-10.00 7 11 7.0 5.6 20 112 0.196 1.00 22.0 7.0 3.8 2.3 15.71 1.00 35.6 57.6 19.2
-12.00 9 12 9.0 7.2 20 144 0.196 1.00 28.3 9.0 4.7 2.6 18.85 1.00 48.2 76.4 25.5
-14.00 8 11.5 8.0 8.6 20 172 0.196 1.00 33.8 8.0 5.1 2.7 21.99 1.00 59.7 93.5 31.2
-16.00 9 12 9.0 9.4 20 188 0.196 1.00 36.9 9.0 5.6 2.9 25.13 1.00 72.3 109.2 36.4
-18.00 10 12.5 10.0 10.0 20 200 0.196 1.00 39.3 10.0 6.1 3.0 28.27 1.00 85.9 125.1 41.7
-20.00 11 13 11.0 10.6 20 212 0.196 1.00 41.6 11.0 6.6 3.2 31.42 1.00 100.5 142.2 47.4
-22.00 12 13.5 12.0 11.4 20 228 0.196 1.00 44.8 12.0 7.1 3.4 34.56 1.00 116.2 161.0 53.7
-24.00 11 13 11.0 11.8 20 236 0.196 1.00 46.3 11.0 7.4 3.5 37.70 1.00 130.9 177.2 59.1
-26.00 13 14 13.0 12.8 20 256 0.196 1.00 50.3 13.0 7.8 3.6 40.84 1.00 147.7 197.9 66.0
-28.00 12 13.5 12.0 13.5 20 270 0.196 1.00 53.0 12.0 8.1 3.7 43.98 1.00 163.4 216.4 72.1
-30.00 17 16 16.0 14.6 20 292 0.196 1.00 57.3 17.0 8.7 3.9 47.12 1.00 184.3 241.6 80.5
-32.00 16 15.5 15.5 15.4 12 185 0.196 1.00 36.3 16.0 9.2 4.1 50.27 1.00 204.2 240.5 80.2
-34.00 18 16.5 16.5 16.3 12 196 0.196 1.00 38.4 18.0 9.7 4.2 53.41 1.00 226.2 264.6 88.2
-36.00 19 17 17.0 16.6 12 199 0.196 1.00 39.1 19.0 10.2 4.4 56.55 1.00 249.2 288.3 96.1
-38.00 18 16.5 16.5 17.2 12 206 0.196 1.00 40.5 18.0 10.6 4.5 59.69 1.00 271.2 311.8 103.9
-40.00 20 17.5 17.5 17.4 12 209 0.196 1.00 40.9 20.0 11.1 4.7 62.83 1.00 295.3 336.2 112.1
-42.00 22 18.5 18.5 17.5 12 210 0.196 1.00 41.2 22.0 11.6 4.9 65.97 1.00 321.5 362.7 120.9
TABEL PERHITUNGAN DAYA DUKUNG 1 (SATU) TIANG PONDASI
TABEL PERHITUNGAN DAYA DUKUNG 1 (SATU) TIANG PONDASI

Type : Driven Pile Bor Hole : BH - 6


Diameter : 600 mm SF : 3

Qp Qs QL (ton) P (ton)
Depth (m) N N' N'' Np K qp Ap a Ns1 Ns qs As b
(ton) (ton) (Qp+Qs) (QL/SF)
-2.00 1 8 1.0 1.0 20 20 0.283 1.00 5.7 3.0 3.0 2.0 3.77 1.00 7.5 13.2 4.4
-4.00 1 8 1.0 1.5 20 30 0.283 1.00 8.5 3.0 3.0 2.0 7.54 1.00 15.1 23.6 7.9
-6.00 1 8 1.0 2.6 20 52 0.283 1.00 14.7 3.0 3.0 2.0 11.31 1.00 22.6 37.3 12.4
-8.00 3 9 3.0 4.2 20 84 0.283 1.00 23.8 3.0 3.0 2.0 15.08 1.00 30.2 53.9 18.0
-10.00 7 11 7.0 5.6 20 112 0.283 1.00 31.7 7.0 3.8 2.3 18.85 1.00 42.7 74.4 24.8
-12.00 9 12 9.0 7.2 20 144 0.283 1.00 40.7 9.0 4.7 2.6 22.62 1.00 57.8 98.5 32.8
-14.00 8 11.5 8.0 8.6 20 172 0.283 1.00 48.6 8.0 5.1 2.7 26.39 1.00 71.6 120.3 40.1
-16.00 9 12 9.0 9.4 20 188 0.283 1.00 53.2 9.0 5.6 2.9 30.16 1.00 86.7 139.9 46.6
-18.00 10 12.5 10.0 10.0 20 200 0.283 1.00 56.5 10.0 6.1 3.0 33.93 1.00 103.0 159.6 53.2
-20.00 11 13 11.0 10.6 20 212 0.283 1.00 59.9 11.0 6.6 3.2 37.70 1.00 120.6 180.6 60.2
-22.00 12 13.5 12.0 11.4 20 228 0.283 1.00 64.5 12.0 7.1 3.4 41.47 1.00 139.5 204.0 68.0
-24.00 11 13 11.0 11.8 20 236 0.283 1.00 66.7 11.0 7.4 3.5 45.24 1.00 157.1 223.8 74.6
-26.00 13 14 13.0 12.8 20 256 0.283 1.00 72.4 13.0 7.8 3.6 49.01 1.00 177.2 249.6 83.2
-28.00 12 13.5 12.0 13.5 20 270 0.283 1.00 76.3 12.0 8.1 3.7 52.78 1.00 196.0 272.4 90.8
-30.00 17 16 16.0 14.6 20 292 0.283 1.00 82.6 17.0 8.7 3.9 56.55 1.00 221.2 303.7 101.2
-32.00 16 15.5 15.5 15.4 12 185 0.283 1.00 52.3 16.0 9.2 4.1 60.32 1.00 245.0 297.3 99.1
-34.00 18 16.5 16.5 16.3 12 196 0.283 1.00 55.3 18.0 9.7 4.2 64.09 1.00 271.4 326.7 108.9
-36.00 19 17 17.0 16.6 12 199 0.283 1.00 56.3 19.0 10.2 4.4 67.86 1.00 299.1 355.4 118.5
-38.00 18 16.5 16.5 17.2 12 206 0.283 1.00 58.4 18.0 10.6 4.5 71.63 1.00 325.5 383.8 127.9
-40.00 20 17.5 17.5 17.4 12 209 0.283 1.00 59.0 20.0 11.1 4.7 75.40 1.00 354.4 413.3 137.8
-42.00 22 18.5 18.5 17.5 12 210 0.283 1.00 59.4 22.0 11.6 4.9 79.17 1.00 385.8 445.2 148.4
GRAFIK DAYA DUKUNG 1 TIANG PONDASI
Project : Jalan Lingkar Selatan Kab. Sampang
Location : Kab. Sampang
Bore Hole : BH - 6

Daya Dukung Tanah (Ton)


0+425
0 50 100 150 200
-2.00 m
0.00
P Driven Pile 400
-2.00 P Driven Pile 500
P Driven Pile 600

-4.00

-6.00

-8.00

-10.00

-12.00

-14.00

-16.00

-18.00

-20.00
Depth (m)

-22.00

-24.00

-26.00

-28.00

-30.00

-32.00

-34.00

-36.00

-38.00

-40.00

-42.00

-44.00

-46.00