GEOTECHNICAL INVESTIGATION FOR 24MLD STP AT NEW CHANDRAPUR

CH-
PROJECT- Geotechnical Investigation for 24 MLD STP at New Chandrapur BH No- 1
GWT (m) 6
CALCULATIONS FOR CORRECTED SPT N VALUES
Final
Corrected
DEPTH OF Bulk Unit Overburde Overburden Overburden Corrected
TYPE OF Observed Value for
SAMPLE Weight n pressure Pressure Correction Value after
SOIL SPT N Value Overburden
(m) (t/m3) in t/m2 (kg/cm2) Factor Dilatancy
N'
N''
1.50 Plastic 1.832 1.248 0.13 1.80 8 8 8
3.00 Plastic 1.837 2.511 0.26 1.42 12 12 12
4.50 Non Plastic 1.842 3.789 0.39 1.23 40 49 32
6.00 Non Plastic 1.849 5.094 0.52 1.20 49 59 37
7.50 Non Plastic 1.858 6.435 0.66 1.08 50 54 35
9.00 Non Plastic 1.858 7.722 0.79 1.02 50 51 33
10.00 Non Plastic 1.858 8.58 0.88 1.01 50 51 33

SPT BLOWS PER 30cm PENETRATION

0 10 20 30 40 50 60
DEPTH BELOW GROUND LEVEL (m)

0.00

1.50

3.00
CORRECTED SPT
4.50 VALUE (N'')

6.00 OBSERVED SPT


VALUE (N)
7.50

9.00

10.50

M/S TARAKUNJ CONSTRUCTION AND CONSULTANCY


c/o Tanbarao Bapurao Gadekar, Tanba Height, Plot No 132, Mitra Vihar Nagar, Kharbi,,
Nagpur-440009
GEOTECHNICAL INVESTIGATION FOR 24MLD STP AT NEW CHANDRAPUR

CH-
PROJECT- Geotechnical Investigation for 24 MLD STP at New Chandrapur BH No- 2
GWT (m) 6
CALCULATIONS FOR CORRECTED SPT N VALUES
Final
Corrected
DEPTH OF Bulk Unit Overburde Overburden Overburden Corrected
TYPE OF Observed Value for
SAMPLE Weight n pressure Pressure Correction Value after
SOIL SPT N Value Overburden
(m) (t/m3) in t/m2 (kg/cm2) Factor Dilatancy
N'
N''
1.50 Plastic 1.837 1.2555 0.13 1.80 11 11 11
3.00 Plastic 1.841 2.523 0.26 1.50 16 16 16
4.50 Non Plastic 1.853 3.8385 0.39 1.36 40 54 35
6.00 Non Plastic 1.857 5.142 0.52 1.20 50 60 38
7.50 Non Plastic 1.858 6.435 0.66 1.12 50 56 36
9.00 Non Plastic 1.858 7.722 0.79 1.01 50 51 33
10.00 Non Plastic 1.858 8.58 0.88 1.01 50 51 33

SPT BLOWS PER 30cm PENETRATION

0 10 20 30 40 50 60
DEPTH BELOW GROUND LEVEL (m)

0.00

1.50

3.00
CORRECTED SPT
4.50 VALUE (N'')

6.00 OBSERVED SPT


VALUE (N)
7.50

9.00

10.50

M/S TARAKUNJ CONSTRUCTION AND CONSULTANCY


c/o Tanbarao Bapurao Gadekar, Tanba Height, Plot No 132, Mitra Vihar Nagar, Kharbi,,
Nagpur-440009
GEOTECHNICAL INVESTIGATION FOR 24MLD STP AT NEW CHANDRAPUR

CH-
PROJECT- Geotechnical Investigation for 24 MLD STP at New Chandrapur BH No- 3
GWT (m) 5.9
CALCULATIONS FOR CORRECTED SPT N VALUES
Final
Corrected
DEPTH OF Bulk Unit Overburde Overburden Overburden Corrected
TYPE OF Observed Value for
SAMPLE Weight n pressure Pressure Correction Value after
SOIL SPT N Value Overburden
(m) (t/m3) in t/m2 (kg/cm2) Factor Dilatancy
N'
N''
1.50 Plastic 1.841 1.2615 0.13 1.80 16 16 16
3.00 Plastic 1.838 2.514 0.26 1.50 20 20 20
4.50 Non Plastic 1.846 3.807 0.39 1.26 23 29 22
6.00 Non Plastic 1.852 5.112 0.52 1.20 27 32 24
7.50 Non Plastic 1.857 6.4275 0.66 1.12 50 56 36
9.00 Non Plastic 1.858 7.722 0.79 1.02 50 51 33
10.00 Non Plastic 1.859 8.59 0.88 1.01 50 51 33

SPT BLOWS PER 30cm PENETRATION

0 10 20 30 40 50 60
DEPTH BELOW GROUND LEVEL (m)

0.00

1.50

3.00
CORRECTED SPT
4.50 VALUE (N'')

6.00 OBSERVED SPT


VALUE (N)
7.50

9.00

10.50

M/S TARAKUNJ CONSTRUCTION AND CONSULTANCY


c/o Tanbarao Bapurao Gadekar, Tanba Height, Plot No 132, Mitra Vihar Nagar, Kharbi,,
Nagpur-440009
GEOTECHNICAL INVESTIGATION FOR 24MLD STP AT NEW CHANDRAPUR

CH-
PROJECT- Geotechnical Investigation for 24 MLD STP at New Chandrapur BH No- 4
GWT (m) 5.7
CALCULATIONS FOR CORRECTED SPT N VALUES
Final
Corrected
DEPTH OF Bulk Unit Overburde Overburden Overburden Corrected
TYPE OF Observed Value for
SAMPLE Weight n pressure Pressure Correction Value after
SOIL SPT N Value Overburden
(m) (t/m3) in t/m2 (kg/cm2) Factor Dilatancy
N'
N''
1.50 Plastic 1.841 1.2615 0.13 1.80 16 16 16
3.00 Plastic 1.842 2.526 0.26 1.60 19 19 19
4.50 Non Plastic 1.847 3.8115 0.39 1.30 24 31 23
6.00 Non Plastic 1.852 5.112 0.52 1.19 27 32 24
7.50 Non Plastic 1.855 6.4125 0.65 1.10 32 35 25
9.00 Non Plastic 1.858 7.722 0.79 1.02 34 35 25
10.50 Non Plastic 1.859 9.0195 0.92 1.01 50 51 33
12.00 Non Plastic 1.86 10.32 1.05 0.92 50 46.0 31
13.50 Non Plastic 1.861 11.6235 1.19 0.90 50 45.0 30
15.00 Non Plastic 1.862 12.93 1.32 0.88 50 44.0 30

SPT BLOWS PER 30cm PENETRATION

0 10 20 30 40 50 60
DEPTH BELOW GROUND LEVEL (m)

0.00
1.50
3.00
4.50
6.00 CORRECTED SPT
VALUE (N'')
7.50
9.00
OBSERVED SPT
10.50 VALUE (N)
12.00
13.50
15.00
16.50

M/S TARAKUNJ CONSTRUCTION AND CONSULTANCY


c/o Tanbarao Bapurao Gadekar, Tanba Height, Plot No 132, Mitra Vihar Nagar, Kharbi,,
Nagpur-440009
GEOTECHNICAL INVESTIGATION FOR 24MLD STP AT NEW CHANDRAPUR

CH-
PROJECT- Geotechnical Investigation for 24 MLD STP at New Chandrapur BH No- 4
GWT (m) 5.7
CALCULATIONS FOR CORRECTED SPT N VALUES
Final
Corrected
DEPTH OF Bulk Unit Overburde Overburden Overburden Corrected
TYPE OF Observed Value for
SAMPLE Weight n pressure Pressure Correction Value after
SOIL SPT N Value Overburden
(m) (t/m3) in t/m2 (kg/cm2) Factor Dilatancy
N'
N''
1.50 Plastic 1.839 1.2585 0.13 1.80 15 15 15
3.00 Plastic 1.841 2.523 0.26 1.60 20 20 20
4.50 Non Plastic 1.846 3.807 0.39 1.30 24 31 23
6.00 Non Plastic 1.842 5.052 0.52 1.19 30 36 25
7.50 Non Plastic 1.849 6.3675 0.65 1.10 50 55 35
9.00 Non Plastic 1.85 7.65 0.78 1.02 50 51 33
10.50 Non Plastic 1.851 8.9355 0.91 1.01 50 51 33
12.00 Non Plastic 1.852 10.224 1.04 0.92 50 46.0 31
13.50 Non Plastic 1.853 11.5155 1.17 0.90 50 45.0 30
15.00 Non Plastic 1.854 12.81 1.31 0.88 50 44.0 30

SPT BLOWS PER 30cm PENETRATION

0 10 20 30 40 50 60
DEPTH BELOW GROUND LEVEL (m)

0.00
1.50
3.00
4.50
6.00 CORRECTED SPT
VALUE (N'')
7.50
9.00
OBSERVED SPT
10.50 VALUE (N)
12.00
13.50
15.00
16.50

M/S TARAKUNJ CONSTRUCTION AND CONSULTANCY