ร้อยพันปัญหาก่อสร้าง
ร้อยพันปัญหาก่อสร้าง
001.
70%
""
-
002. ?
..
(
)
1.)
2.)
3.)
4.) 1-3
5.) -
6.)
7.) -- - -
8.)
9.) - !
003. Floor to Floor = 2.70 Floor to Ceiling
2.10 ?
(Setback)
(Ramp) Flat Slab ()
Post Tension Floor to Floor 2.50 25-40 .
2.10-2.25
Floor to Floor = 2.70 (Elevator)
2.50
" "
( 2.50 )
005. ()
1.00 1.00
1.00
. 1.20
- 1.00 (:
)
006. ?
:
() () ()
1.00 18.00 27.00
1.50 18.00 27.00
1.20 20.00 25.00
2.00 17.00 30.00
007.
.
Slope
1
008. ?
. !!
009.
010.
( )
( )
!
011. Unit
..
Unit " Unit" "- "
() Unit
-
()
013.
Ready Mixed
KSC. ( ) 240 KSC. 280 KSC. 320 KSC.
1 : 2 : 4 ( Portland 6
7 .)
155-175 KSC. 240-280-320 KSC.
014.
""
6
x 6 36 .. .. 200 . = 36 x 200 = 7,200 .
7,200 . = 7,200/2 = 3,600 .
. 4
() = 7,200/4 = 1,800 .
1,800 .
3,600 . 3,600 . 1,800 .
4 2
( 1,800 . 3,600 .)
015.
2 ( Micro Pile
) 2
:
1.
2.
() (
)
3. 20 ( )
120 ( )
4.
( 70 )
:
.)
.) ()
.)
.) ( )
( 3 ) (
) (
)
018. ?
( )
ASTM
019. PRE-CAST!!
PRE - CAST ( )
PRE-CAST
PRE-CAST
PRE-CAST
PRE-CAST
. PRE-CAST
()
020. ?
()
()
021. ( ) ?
022.
Transformer,
( -
4-6 )
023.
( )
( )
()
1.) = 10 mm.
2.) 10 = 15 mm.
3.) 10 = 20 mm.
4.) --- = 5.+10 mm.
5.) = 20.+50 mm.
= 50 mm.
= 50.+100 mm.
6.) / = 2.5 / 5 mm.
024. ()
20% -25% 20% - 25%
025. !
2 Portland Cement (
) Silica Cement ( )
Portland Cement Silica Cement
..
. (?) )
026.
(Hanger)
Hanger
()
Shop drawing ()
(Insert) ( )
Insert (Tendon)
() (
) Hanger . (Tendon)
Tendon
027.
() "
1 2,400 5
2,400 x 0.05 = 120 150 /
.. 120 150-120 = 30
028. 5 1 ?
5 1 20% 5 1 (
) ( Safety Factor)
3 200 1,600,000 -2,200,000
6,000 () 5 1 = 6,000 / 5
= 1,200 15 = 1,200 x 15 = 18,000 ( 1%
) ()
029.
.
030. ?
( 2 )
(Watt) ()
6 25 0.05
12 70 0.14
T.V. 21 200 0.40
T.V. 25 250 0.50
1.00 1,450 2.90
1.50 2,060 4.12
2.00 3,500 7.00
6 90 0.18
12 240 0.48
6 500 1.00
10 600 1.20
() 1,000 2.00
() 1,500 3.00
() 2,200 4.40
() 4,000 8.00
() 1,000 2.00
.
:
= Watt / 1,000 / Watt
800 Watt = 800 2.00 / 1,000 = 1.60 /
031. BUS DUCT ?
Bus , Duct , Bus duct
Bus duct Bus duct
( 300 ) () Bus duct
Bus duct
032. ?
5 5-15 15
15-45 ()
033. ?
"" "" .
""
034.
() 5 .
2.5 .
( )
035.
(
)
036. ()
( . )!!!
037. ?
(
)
( )
038. MATV,CCTV
()
:
MATV =Master Antenna Television ( )
CCTV = Closed Circuit Television ( )
F.B.I. = FEDERAL Bureau of Investigation
K.G.B. = Komissia Gosudarstvennoy Bezopasnosti
C.I.A. = Central Intelligence Agency
A.S.A. = Association of Siamese Architects
042.
(
) (Limit Switch)
- (
)
043. Overflow ?
Overflow
,
Overflow
Overflow
044.
045. (Valve)
Valve
Valve
1. Supervisory Valve
Valve Supervisory Valve
Gate Valve
Gate Valve ()
2. Main Gate Valve
(
)
( )
( )
046.
:
1. Surge Tank ( )
2. 2 3 2.5
15
3. ()
047. !!!
(
) ( ) .
( ) .
-
()
049.
(Closed Duct)
1.
2.
( )
3. (Duct) (Overflow)
()
4.
5.
050. ?
( )
051. ?
200 5 3
053.
(Urinal)
...... !!!!
054. Urinal () ..
(Urinal)
2
( ) (
......
)
055.
() .
40
( )
1.
2. ( Down light)
3.
4. ()
5.
6. . .
056. Split Type ()
057.
3
1. (Window Type)
8,000 - 30,000 BTU. .7-.25 (
)
2. (Split Type) 1-
50 ( 1-3
) ( )
.
(Fan Coil)
3. (Water Chiller) 100
.
( )
Central Air
Split Type Central Air
060. !
(Central Air)
(Condensing Unit) (
) 2
:
1.
2. ()
061.
:
1. (Window Type)
2. (Split Type) (fan Coil)
() (Return Air)
3. (Water Chiller) (Return Air)
062. (Elevator)
2
1. ( 20 )
2.
2 .
(Public Function) ()
--
"
"
063. ?
(outlet)
064. ?
3
""
.
065. ?
""
.
066.
"" Construction All Risk
()
" "
50%
067.
100%
()
(Floor
Drain) ( )
068. ?
80%
( ) (
20% )
069. ?
(
)
( )
070. ?
+
+
.
071. ?
( .
)
072. ?
0 " " 10%
( )
Computer
80 10 . ""
073. ?
:
1. ()
2. . ( )
3. ()
4. ()
5. ()
074.
2 (-- )
(
)
075.
(Wind Load) .
-
2
1.
2.
2 Heat Strengthen ( )
4-5 Tempered ( )
076.
()
077.
(- )
078. ?
3
079.
() (Interior
Design)
2
1. 1: Architectural Interior -
-
2. 2: Interior Decorate
080.
(
Flower Bed )
081.
Roof Garden
5
1. 200-
400 /.. 700-1,500 /..
2. 40 ( 1.00 )
3.
4. ( 180 /..)
5. .--
083.
084. ?
5 ()
( )
(
)
- - (
)
( ??? )
085.
5 - 6
1.
(
2 . )
2.
3. 200 5,000
- (
) ( )
4.
( 2-3 .)
5.
6.
086.
2 - 3 ( )
"
" ()
087. !!!
( 1 ) 5-7 . (
) 3 .
( 5 - 7 .
)
088.
(
)
1.
3 .
2.
3.
089.
"" . ( )
090. ?
091. ?
1
()
( )
092. ?
1.
2. Water Stop
3. Water Proofing Membrane - ()
4. ()
5.
093. ()
-
--
1
""
()
094. -
() !!!!
-
()
( )
095. ?
" "
- . ()
096.
( )
097. ?
()
( ) Temperature Steel
()
098. ?
4 :
1. Anneal Glass
2. Tempered
3. Heat Strengthen ( Tempered
Glass) ( Tempered) Float
4. Laminated 3
() ..
Float, Tempered, Heat Strengthen, Laminated
099. ?
( 4 )
30 - 50
()
101.
20 .
( )
( Suction )
102. --
(Corridor) ( 15 )
()
103. !!
" (Win Load)"
(
) "
!!!!!" ( : Float Glass)
( ..) 1 - 4 (0.11 m.) 5 - 10 (11.30 m.) 10 - 30 (30 m. up)
1.00 6 mm. 6 mm. 6 mm.
2.00 6 mm. 6 mm. 6 mm.
3.00 6 mm. 6 mm. 8 mm.
4.00 6 mm. 8 mm. 8 mm.
5.00 6 mm. 8 mm. 10 mm.
6.00 8 mm. 10 mm. 10 mm.
7.00 8 mm. 10 mm. 12 mm.
8.00 8 mm. 12 mm. 12 mm.
9.00 10 mm. 12 mm. 12 mm.
10.00 10 mm. 12 mm. ()
11.00 10 mm. 12 mm. ()
12.00 12 mm. () ()
13.00 12 mm. () ()
14.00 12 mm. () ()
15.00 12 mm. () ()
16.00 12 mm. () ()
17.00 () () ()
Tempered Laminated Glass
105. ?
"" .
Condominium
106.
()
()
107. () - ?
3
()
108.
""
. Acoustic Board (
)
( )
109. ?
(Duct) .
:
= 1.5 + Slope 1: 50 + 5
110.
()
()
10 . 2.00
2.10
111.
90%
( ) ()
.
112. !
()
( ) .
( ) . .
90 . 2
113. Aluminium ?
5
1. (Code NA)
2. (Code 512) 10%
3. (Code 514) 512 10%
4. (Code 517) 514 10%
5. 517 50%
114. ?
() "
" - -
( ) -
115. ?
( )
116. ?
()
117. ?
:
- ( )
( - )
- -
118. ?
)
()
... ( ) .
()
.
Solar Slab
119. ?
(Truss), , Tied Rod,
-
!!!!
120. Laminated Glass
Laminated
( Laminated )
121.
()
122. ?
30
(Attic) - - .
:
(
)
2
123.
() .
.!!!
124. ?
( )
.
125. 45
45
45
127.
(Tower)
(Floor Drain)
Tower
.
(
)
128. ?
.
. (
) .. .
. !
129. 1 10 () ?
:
1.
2.
3.
4. () ()
( )
5. 15
6. 3 ()
7. ( )
8. -
9.
()
10.
10 ( 10 ) 5
130. 5 M. () ?
()
"5 M." ( 4 ) :
1. MAN
2. MONEY
3. MACHINE
4. MATERIAL
5. MANAGEMENT
131. ?
(Activity)
.
3 :
1.
2.
3. ()
- - - - -
"" . ""
132. ()?
(
) :
1.
a. ( 10%)
b. ( 15%)
2. 4
a. 1 =
b. 2 =
c. 3 =
d. 4 =
/ 1 2 3 4
65% 60% 55% 50%
20% 20% 22% 26%
5% 5% 6% 6%
10% 10% 11% 11%
0 5% 6% 6%
Cost Control
( ) Cost Control
. (Estimate ) Site ..
Cost . Cost Control
134. () ?
6
:
1 = , ,
2 =
3 = ()
4 =
5 =
6 =
()
10 6.50% = 650,000
20 5.50% = 1,100,000
5 4.75% = 237,000
= 1,987,500 (= 5.6%)
..
135.
( )
:
1.
2.
(.) (.)
3.
137. ?
138. ?
-
139. () ?
( "
") :
1. (
)
2.
( ) (
)
3.
4. ( )
5. ()
6. ()
7. -
8.
9.
10.
11. (
)
12.
12 100
140. Spec. !
2-3 ( 100) :
1. (- .
)
2. / /
Spec.
3. Spec.
4.
141. ?
"" ( )
"" "" "
"
142. ?
(Construction Area)
:
1. 2-5
1-2
2.
(Functional Area)
3. 5-10 ( 80
Kg/sq.m. 120 Kg/sq.m.)
4. 10-20 150-160
Kg/sq.m.
5. 20-30
(Dry Process) 120 / (
) (Wet Process) -
( )
6. 30
10
7.
70%
What-If
14% ?
15% 2 ?
28 ?
32,500 ?
Feasibility Study Cash flow Computer
(Marketing Research) Consumer Product
Marketing Report
Marketing Situation
144. () ()
1. ( )
( )
2. ()
(
)
3.
( )
145. ?
""
( Serious
)
146.
"" "" ""
1.
2. (--)
3. - -
4. ()
5.
6.
7.
8. ()
9. ()
10. ( )
11. ()
12.
"
147. C.P.M. !
C.P.M. Construction Process Management
Critical Path Method
C.P.M. C.P.M. (
) 100 (
)
C.P.M. C.P.M.
1. Weekly Schedule () Bar Chart
Bar Chart (Activities)
2. Monthly Schedule () Bar Chart Flow Chart ( Scale) Flow Chart
( Scale) () (Activities) Scale
(C.P.M. )
3. Quarterly () Flow Chart Bar Chart
() Bar Chart S-Curve S-Curve
4. Yearly Or Entire Project () ( Flow Chart, C.P.M., Pert, P.D.M.,
etc.) Bar Chart
(
)
148. ?
"" ""
()
1.
2.
3. --
Consultant C.M.
(C.P.M. = Construction Process Management "
" C.B.M. = Construction Business Management C.M. "
")
4. 2
C.B.M. (Construction Business Management) ----
- 3
5. ()
C.B.M. C.P.M.
6. (Full C.M.) (
2 - )
Full C.M.
C.M.
.
149. Inspector, Consultant, C.M. ?
(C.M.: Construction Management) C.M.
Inspector () Consultant ()
C.M. () :
1. Inspector
2. Consultant
3. C.M. -- (Quality- Cost-Time)
C.M.
-
-
150. ?
1. ( . .) ( )
1,000 ()
2. ( . .)
.. ()
3. ( . .)
..
2
151.
2-3
( )
150 / 500-1,000 /
()
2
1. ()
2. ()
- -
""
152.
( 300%)
4-5
1.) ()
2.) ()
3.) - (
)
4.) ( )
5.) - (
)
153. 60-80
1-2 2-4
(
) (
) 60-80
() (
)
154.
()
155.
(
)
-
156.
(
)
(
)
157.
( ) -
-
- ( )
() (
!!)
158.
( )
( Tempered Glass Laminated Glass)
.
10
12-15
159. -
2
1. + 0.30 30
-
2. + 1.10 110
1.10
( )
60-100
160.
"
( )
( )
161.
( )
162.
"
"
( 3.00 )
163. Pantry
()
()
()
164.
100
(
) 100
()
165.
()
T.V.
( )
T.V.
( )
166.
10
" (Section Aluminum) 100 /"
( )
1.5
1.5
167.
( 8)
()
( 3-4 )
168. ""
( )
" (
) "
1.
2. (Suction) (
)
3.
169. Basic 1
5 ( 643,246,000 )
1. - (
) 1 ( )
2. (Physics) (
-)
2
3. - -
() 3
4.
( )
4
5. ()
5
()
170. " "
()
-..
171. 8"x8"
10 8"x 8"
90%
8"x8"
8"x12" 12"x12"
172.
( )
( ) (
)
( )
173. Glass Block
Glass Block
176.
(
)
177.
(Pin Plate)
178. ""
(
120 / 40 10
200 !!!!!
1.
2.
3.
4.
179.
-
-
180.
()
181. -
-
-
1.
2. (Glare)
3. ( )
-
()
4.
(
)
182. ()
-- 2
1. (
)
2. (
)
183. ""
""
1.
2. ()
3. ( )
4.
()
184. (Flight)
(Fight)
( Floor to Floor 3.00-3.20 1.50-1.60
1.20-1.30 ) (
)
185. 4" = 10 . 4 10 . ?
( 1.5" X 3" 2" X 8 "
3.00
) 4" = 10 X 10 Cm.
11 X11 Cm
!!!!
186.
!
- " ?
( )
!!!
187.
-- ()
-
188.
()
( T-Bar
)
189.
(
)
190. ""
1.
(
)
2.
""
"" (
)
192.
( )
193. ..
(
)
"
" ()
( 99.98%
)
194.
1.
2.
3.
4. -
195.
()
--
1. Four-sided Support 4 ( 4
)
2. Three-sided Support 3
3. Two-sided Support 2
( 2-sided
) 2
1.
2. ( 90 ) 2
sided 3 sided 4 sided
196. (Silicone)
Silicone
Silicone
2
1. Structural Silicone
2. Sealant Silicone
(Non-Acid) ()
(Max. Elongation)
Reflective Glass 2
1. Hard Cote
(
)
( )
""
2. Soft Cote ()
-
()
198. - 227
- 10 % 5
227
227
"
( ) 5
- ./
.
!!!! !
Post Tension
(20-28 .)
Post Tension ()
200.
201. Contour
( 50 )
- (
Cut & Fill)
( 1,000 /)
202.
()
203.
()
( )
204.
-
""
20
""
1. () () ( "
")
2. () "" ""
3. ( )
205.
(
131)
""
- 5-6
2-3 Tower Crane
Tower Crane
(
)
( Syncronize)
206. SD 40
SD 40
SD 40
207.
( 142)
(
1.50-2.50 ) (
)
Shop Drawing -
- - -
- - - -
Shop Drawing
(
)
Shop Drawing
(
)
Shop Drawing Shop Drawing
(
) (
)
Shop Drawing
211.
Down Light
1
Volt ""
220 220
()
220
220
213. (Sprinkler)
Sprinkler
Sprinkler
Sprinkler
214. Spec
(
)
()
2
10 mA
215.
( )
-
)
216.
(
- ) "" (
) ()
217.
1.
2.
3.
4. "
"
4
218. ""
90 %
() ( )
1.
2.
3. ()
4. ( ) 14-22-20 0-46-0 15-22-18
5. 4
5-7
( 3
)
16-16-16
5 ()
219.
(Central Air
conditioning System) ( )
Central Air
(Filter)
( 200 1 3-12 )
220.
()
Serious
221. Gas
Gas
Gas
Valve Gas
!!
-
223.
() ()
Gas
Gas
-
Gas ( Gas )
( ) (
227 5 )
224. ()
()
10-15
1. (
)
2. (
)
3. (
)
4.
(
5 1
4 )
5. Tower
6. 2 ( 6 3 ) (
)
7.
() High Zone -
Low Zone ( 30 Low Zone 1-15
High Zone 1 16-30 ) Life High Zone 2-15
3 () - -
2-15 ( High
Zone 8 ( ) 1
16 )
226. 2
(Split Type)
(Load Braker)
() !!!!
- -
" Load Braker 2
"
( )
(
)
( ) Return Air !!!!
-
C.M.
229.
24
- - - - -
( 5
.. )
Duct Shaft
3
1. () Duct-Shaft
2. Duct-Shaft
Duct
()
!!!
3.
..
Duct-Shaft
10
232.
!
()
( )
233. ""
"" 10
() - (
)
234.
(
) (
)
235.
(
)
() 10 . 240 /
( 1 2.4 ) 150
./.
236.
- - - -
(
) () 3
1. (
)
2. (
)
3. (
() )
- -
237.
"
"
100% - 200% .
() 4
1. 2.50
2. 5.00 (Sheet Pile)
3. 8.00-10.00 Sheet Pile
Sheet Pile
4. 8.00-10.00
238.
( Block out
)
()
(Coring Technique)
239.
(
)
(Compression) (Tension)
.
243. 2.0
() -
.
( ) (Friction)
244. Post Tension
""
Post Tension
(
)
. Post Tension
245. Pre-Cast
19 " Pre-Cast"
4
1. Shop Drawing
2. Pre-Cast ()
3.
4. Pre-Cast
. ()
5. Pre-Cast
()
Pre-Cast ()
() Pre-Cast Pre-Cast ( 2
9 . 2 , )
246. 1
1-2
-
247.
( )
- - -
- -
()
248.
()
(
)
249. ""
(
) - ( )
2-3
( - -
)
250.
---
-
-
""
3
251
4
( )
1.)
""
2.)
( Check List)
3.) (
)
4.)
252
?
""
1.
2. (
. )
3.
4.
5.
(
)
253
?
"" ""
1.
2. (C.G.)
( )
(
)
3. ()
- - -
(
)
4.
(
)
!!!
254
( )
1. ( )
(
)
2. 50 . 1
(
)
( )
3.
4.
1
!
255
?
1.
2. 5-7
""
3.
( )
4.
5.
(
) 5
120
6. () ""
()
256
?
( )
1. ()
1
()
2. 1
(
)
(
)
3.
()
(
)
4.
257
""
1. (
1.10 )
2. 2 (
) ()
3. 4
() ( )
()
4.
( 3 )
( )
258
" "
2538 65
75
""
19
()
4 ".
."
(Low pressure
cell) (Depression)
(Tropical Storm)
259
260
8 ()
1. (
)
() (
)
""
2
( )
2.
(
)
3. ()
4. (
)
5.
5 8-9
6.
7.
(
)
8.
261
1.
(
) (
)
2.
-
3.
(
)
262 .. !
"
"
1.
(
)
(
"")
( 5-6
)
2.
""
(
)
(
)
( )
3.
4.
(
)
5.
263
( )
( )
( )
.
(
) (
)
264
( )
( )
()
() 3
1.
2.
3.
265
1.
2.
()
3. ""
( )
()
( )
266
1.
2.
3. ( "")
(
)
4.
""
5. 90 %
267 ()
1.
(
)
2. (
) (
)
3.
4. (
)
268
(
)
269
""
(
)
(
)
270
( )
1.
(
)
2.
(Slab on Ground)
( )
3.
( )
271
(Demand over Supply)
()
248/1 9
10310
319-6555 319-6149
272
(
) (
)
(
) ( )
273
!
(
)
()
274
275
(
)
1.)
- (Slope)
2.)
-
-
3.)
(Slope)
Sluice Gate
.)
-
-
( .
.)
.)
, ,
(Check List)
276
()
(
)
()
50% 400%
(
)
277
(
)
278
1.
2.
3. (Built In Furniture)
4.
279
280
248/1 9
10310
319-6555 319-6149
4
281.
...
....
282.
( )
"
"
(
)
283.
(
)
(
"")
""
""
284. ...
( = , )
()
""
"
"
285.
(
)
286.
()
(
)
.....
287.
""
288.
(
)
( )
....
"
"
289.
( )
()
()
( )
(
)
290.
291.
292.
( )
(
)
()
........
( )
- .
(, ) -
( )
293.
...
""
!!!???
()
294.
295.
()
296. .
(
)
297. .
.
(
)
298.
299.
()
()
300.
()
() (
)
(
)
301.
302.
(
)
Non Shrink Cement (
)
303.
(
)
(
)
304.
(
)
(
)
""
305.
(
)
(
)
(
)
( )
" "
306.
()
()
( )
(
)
- ( )
307.
""
""
(
)
-
308.
(
)
309.
....
310.
()
( Wind Load)
311.
( )
(
)
Drain (
)
312. .... .....
(
)
""
....
.... !!!
313. ""
(
)
( )
"" ""
..... ""
314.
315.
(
)
" "
""
.....
.....
( )
""
=
=
=
( )
--
.....
B.M.
Bench Mark
B.M.
B.M.
Baseline
Baseline B.M. Baseline B.M.
B.M.
B.M.
317.
" "
(
)
318. ""
""
()
-
()
319.
""
320. ... !!!
()
......
321.
....
322.
()
323.
....
324. ....
....
..... .
. + . + . +
325.
""
" "
()
." x " (
) ....
""
326.
....
327.
1399
" "
328.
%
%
x
%
( x . = )
%
(
)
329.
""
()
330.
(
)
( )
Zoning
( )
331.
()
(
)
.... ""
... " "
332.
( )
....
333.
334.
(
)
335.
.
.
.
.
(Landscape)
336.
Program Requirement
Program Requirement
(Space & Time)
337.
338.
(
) ()
339.
(
) (
)
(
)
(
)
340.
.
.
.
(
) .
341.
- -
-
-
-
342.
!!!
(
)
()
343.
(
)
x .
344.
""
"Glare"
"Contrast"
Glare
Contrast
()
( Glare)
Contrast
.....
345.
(
) ""
-
346.
""
.....
347.
(
)
....
( )
348.
(
)
349.
(
)
.....
350.
"
"
()
(
)
351.
(
)
""
%
....
352.
Wallpaper
Wallpaper () ""
....
Wallpaper
354.
Wallpaper
Wallpaper
Wallpaper
( Wallpaper
)
Wallpaper
Wallpaper
Wallpaper
( )
.....
Wallpaper
Wallpaper
355. ()
(
)
....
""
356.
Carpet Tile
Carpet Tile
357.
...
(
)
""
""
( )
....
358.
( )
(
)
359.
(
)
(
)
()
360.
. x .
x .
x
. ""
x .
" "
" "
...... "
"
....
361.
! !!
362.
""
363.
( )
()
(
)
(
)
....
364.
( )
365.
PVC
367.
....
()
368.
( )
369.
(
)
(
)
370.
(
) Tempered Glass
371.
Tempered Glass
-
372.
(
)
373.
()
374. ...
(
) "
"
()
....
.....
""
375.
)
""
( )
376.
.....
377.
"" " ()
"
....
"
"
....
378.
""
.....
379.
(
)
+ + +
.....
380.
()
(
)
()
Crystal (
) (
)
382.
(
)
(
)
(Non Sliper)
383. Attachment
Attachment
()
Attachment
Attachment
384.
()
()
385.
(
)
()
386.
"
" (
)
()
387.
(
)
()
(
)
388.
(
)
()
(Pin) (Ring)
(Combination)
Pin
Ring
389.
(Pin)
(Ring)
390.
(Master Key)
(Pin) (Ring)
Master
Key
Ghost Master Key ""
(Ring) (Pin)
391.
....
()
....
394.
(Moment)
""
395.
396.
(
)
(
V)
( Dry Type)
( Oil Type)
397. Earth Leak Circuit Breaker
(
)
...
(
)
398.
Ground Wire
399.
(Earth Leak Circuit
Breaker)
(
)
()
400.
(Ground Wire)
(Earth Leak Circuit Breaker)
401.
402.
(
)
Main Circuit Breaker
403.
(
)
404.
405.
406.
(
)
407.
Main Circuit Breaker
( )
"
"
......
408.
...
(
)
409.
410.
411.
( )
412.
()
413.
""
-
414. , , , ...
415.
va/
. (
)
....
....
416.
Main Circuit
Breaker
(Trip)
417.
(
NYY)
(
)
418.
""
( )
419.
= =
420.
( Peak Hour)
%
(.
)
421. ...
422.
: - : . : - :
. Peak Hour
423.
""
424.
"
"
425.
(
)
(Grease Trap)
()
Grease Trap
Grease Trap
426.
(
)
....
427. !!!!
"
" Check
Valve
....
428.
....
Ionizer
Ozone
Filter
Filter Filter
Filter
Filter
... "" ""
""
" "
....
.....
P.E. PVC
( PVC)
PVC
P.B.
P.E.
P.E. ( . -
) (P.E.
P.B.)
""
432.
Comfort Zone
(
)
""
433.
/
.
/
434. ...
,
()
, btu
435.
%- %
() % -
%
(
)
436.
""
(
)
()
437.
-
- -
-
-
438.
--
(
)
-
-
-
-
-
(
)
439.
" "
- ()
-
(
)
" "
Thermal Mass
Thermal Mass
Thermal Mass Thermal Mass
441.
(Thermal Mass)
()
442.
(Comfort Zone)
(
)
......
443.
""
( C.F.M. )
444.
()
Comfort Zone (
)
(Thermal Mass)
445.
(Split Type)
""
()
() (
) ......
.
.
.
.
....
(Return Air)
""
.....
(Return Air)
(
)
.... (
)
( )
446.
. (Filter)
. (Condencing unit)
. (Fancoil Unit)
.
447.
""
""
(
)
448.
()
(
)
449.
""
( )
450.
.... ""
....
(
)
451.
.......
....
452.
!!!
CFC
453. Fire Pump
Fire Pump
Fire
Pump
Fire Pump
.....
454.
()
....
, /
.....
455.
(
)
456.
....
= /
= /
/
""
457.
.....
.....
....
...... (
)
" " (
)
....
458. ""
""
459.
""
(
)
""
460.
( )
-
(
)
461.
"
"
(
) -
""
...
462. %
()
.....
463.
.....
464.
....
()
( )
....
465.
"
"
""
(
)
466.
(
)
"
" ....
""
468.
469.
() -
-
(
)