This document provides instructions for a 2nd internal assessment test in power system planning at the Shetty Institute of Technology in Kalaburagi. Students have 1 hour and 15 minutes to answer any 4 out of 5 questions related to cogeneration systems, distribution planning, private participation in the power sector, rational tariffs, and reactive power balance. The test is worth a maximum of 25 marks.
This document provides instructions for a 2nd internal assessment test in power system planning at the Shetty Institute of Technology in Kalaburagi. Students have 1 hour and 15 minutes to answer any 4 out of 5 questions related to cogeneration systems, distribution planning, private participation in the power sector, rational tariffs, and reactive power balance. The test is worth a maximum of 25 marks.
This document provides instructions for a 2nd internal assessment test in power system planning at the Shetty Institute of Technology in Kalaburagi. Students have 1 hour and 15 minutes to answer any 4 out of 5 questions related to cogeneration systems, distribution planning, private participation in the power sector, rational tariffs, and reactive power balance. The test is worth a maximum of 25 marks.
Department of Electrical and Electronics Engineering
2nd Internal Assessment Test Sub: Power System Planning Sub code: 10EE761 Duration: 1Hr 15 Min Max Marks: 25
Note: Answer any four questions.
1. What is cogeneration? Explain the categories of generation system.
2. Explain distribution planning. 3. Write a short note on private participation in power sector. 4. Discuss in brief rational tariff. 5. Explain reactive power balance in power system