You are on page 1of 7

A REVIEW OF THE LITERATURE ON THE EVALUATION AND ROLES OF TUNNELS

TECHNOLOGY IN MANAGING ENVIRONMENTAL DISASTER


Nuhu Isah and Maimunah Ali
Department of Technology Management
Faculty of Technology Management and Business
Universiti Tun Hussein Onn Malaysia

ABSTARCT
Managing environmental disaster requires the use of technology into how technology is used to
minimize the casualties and loss incurred when disaster strikes. This paper involves the
discussion on the evaluation and roles of tunnel technology in managing environmental disaster
with a specific focus on the evaluation and roles tunnel play as the tool in flood prone areas.
One particular example is SMART, an acronym for Stormwater Management and Road
Tunnel. The SMART tunnel plays a very vital role in flood management as well as the traffic
congestion in the city center of Kuala Lumpur Malaysia. The project is undertaken as a joint
venture projects between the government and the private sector corporation and SMART tunnel
receives so many accolades due to its unique feature and distinct roles in managing flood
disaster in the Klang Valley.

Keywords: Tunnels technology, environmental disaster management, SMART, Malaysia

1. Introduction system is very unique as the tunnel is built


using two Slurry Shield TBM machines that
A tunnel is an underground passageway, allows the drilling and tunnel lining work to
completely enclosed except for openings for be done continuously without setbacks. The
entrance and exit, commonly at each end. A machine also eliminates the hazard of tunnel
tunnel is a passage way that carries people stability during construction and also the
or vehicle across a destination that shortens ground water drawdown that cause sink
the travelling time. Tunnels in the olden holes. The entire paper is about the tunnel
days are used for mainly mining works. As a construction method, technology used,
result of technological development with tunnel design, purpose and efficiency of the
time, tunnels construction had become more tunnel.
commonly used as transport routes that links
places, rails links, vehicles and also as
canals for water diversion. Tunnels are
constructed all over the world. This paper
will focus on the SMART Tunnel in Kuala 2. Literature Review
Lumpur Malaysia. This tunnel is very
unique because it is the type of tunnel in the 2.1 Tunnels
world that combines the wet and dry system. Underground tunnels in early days are used
The tunnel is used as a pathway to transport especially in mining. Tunneling and mining
vehicle and also a channel for stormwater are together since beginning of the industry.
diversion from Kuala Lumpur Malaysia. The Before mining, tunnels in ancient history
were used for water carriage. In cities such
as ancient Rome, tunnels were designed to first shield driven tunnel (Labor Law Talk
carry water supply from aqueduct nearby. Encyclopedia, 2005).
The technology of tunneling developed from Tunnels are usually constructed in
ancient days until now. Sometimes tunneling different type of ground soil layers that
becomes solutions to so many challenges, varies from soft clay to hard rock layer. In
but constructing tunnels are still under major soft clay layer the tunnel digging are done
studies because we need to upgrade the using New Austrian Tunneling Method
design according to time and needs. (NATM) and in hard layers Tunnel Boring
The development rock tunneling is Machine (TBM) are used widely ((Megaw&
influenced by these major parts. There are Bartlett, 1981).
rock drilling machine, drill bits, and
explosives (Megaw& Bartlett, 1981). When 2.2 Tunnel Design
the scientist from China invented the gun In a contemporary situation, tunneling is one
powder, it gave way to new methods for of the common solutions to solve the design
tunneling work to presume. Gunpowder problems in existing cities with a lot of
since that has developed into more severe obstruction or heritage path, in nature such
usage in the tunneling industry. Gunpowder as mountain areas, cross the channel or
gave way to much more powerful nitro- ocean etc. All this had an influence on the
glycerine, quickly followed by dynamite, development of tunneling technologies in
introduced by Nobel in 1967(Megaw& the recent years. There are some
Bartlett, 1981). In rock drilling, compressed characteristic features that had to be
air became the accepted motive power, considered when considering the area of
although the usage of the hydraulic powered tunneling. The entire factor below will
machines was preferred for a time period finally decide the suitable construction
commonly in Europe. method in that area to complete the tunnel
The use of explosive in hard layer is project (Kusakabe et al., 1999). The key
common in order to blast through the hard factors are:
surface. Blasting is the easiest methods in 1. The environmental condition,
constructing tunnel, but there are weakness geotechnical and hydrogeological
such as the safety and problems of excessive characteristics of the soil layers.
caving in of the layer. There are different 2. The impact of the construction of tunnels
types of tunnels constructed from different to the underground utilities and on the
soil layer or location, such as: Hard Rock; surface such as streets and buildings.
Underwater; and Soft ground. 3. Availability of possible surface traffic
Tunnels also are the major solution for all vehicles or traffic control.
for the purpose of pedestrian crossing, road 4. The cost of tunnel, the technical aspect,
traffic, for the usage of the vehicles, railway and the construction time schedule of the
links and also for canals. Most of the tunnels tunnel.
are designed and constructed specifically for 2.3 Cut and Cover Tunnel
carrying water for daily consumption, for In constructing tunnel using the cut and
the purpose of generating electricity such as cover method, the shape of tunnel will
the hydroelectric or as sewers for major usually be rectangular and stations and the
cities to ease the flooding problems and for followings are the basic technologies been
telecommunication cables. Brunels great used:
Thames Tunnel is the first tunnel that was
ever built to cross under a tidal river and the
1. Reinforced concrete walls with steel In Malaysia, the use of road tunnels
struts, pre-stressed tie-backs or self- are very less compare to other European
supported. countries. There are numerous tunnels such
2. The ground water in the soil is lowered as The North-South Expressway Tunnels
by introducing the water well systems. (Jelapang) and currently SMART Tunnel.
Penchala Tunnel is the first breakthrough in
The diaphragm of the tunnel installed using tunneling technologies in Malaysia, when
machineries and the bottom depth ranges the government joint ventured with
from 20-30m below ground surface. Then GAMUDA Berhad to construct the 710m
the well is to eliminate water, it will be long tunnel
placed inside or outside the excavation
(O.Kusakabe, K.Fujita, & Y. Miyaki, 1999). 2.6 Tunnel as Stormwater Sewers
Stormwater sewers are defined as storm
2.4 Tunnel Boring Machine Technologies filter. Most major cities around the world are
The Tunnel Boring Machine (TBM) was using sewer system to transport rainwater to
introduced in 1975. The transport and nearby outlet such as stream or rivers. Storm
evacuation of the excavated mucks and the sewers are pipes that transport water runoff
mounting the reinforced concrete lining was from streets to natural water source such as
done using this machine. Since then the stream and rivers. Commonly catch basins
technology has developed widely. For are provided in order to store the water
instance for 1m tunnel, the technology before gradually releasing it to rivers. The
comprises; catch basin also functions as the trap for
1. The excavation phase and the TBM water floating debris such as rubbish, sands
advance. and other unwanted materials that not
2. The pre-casted concrete segmental lining supposed to be in the natural rivers.
is erected. Some storm sewers are treated and
3. Soil grouting and water proofing works some are not treated. This depends on area
outside the lining ring. and jurisdiction. Treatment of water helps to
The TBM is launched in larger tunnels that clean and purify the water in order to release
later were used as the water pumping station in the natural rivers. This is very important
or ventilation shafts (Kusakabe, et al., 1999) as every engineering structures or planning
have to consider the environmental issues as
2.5 Underground Road Tunnel one of the priority status.
Development of some countries
brought about new technologies particularly 3.0 History of Storm Sewers
on engineering. Innovation in engineering The earliest sewer that was found was in the
also plays a vital role in upgrading existing Indus Valley civilization. In ancient Rome,
services and invention of infrastructures the Cloaca Maxima was considered a
such as tunnels, long bridges etc. marvelous engineering design and
Development of road tunnels is widely construction. In the medieval European
known in Europe compared to Asia. But cities, small natural waterways are built to
currently it is getting more attention in Asia channel wastewater and as time passes this
as there are numerous advantages from this were upgraded to cover channel that is
type of development. known today as sewer systems (Labor Law
Talk Encyclopedia, 2005).
3.1 Tunnel versus Bridges the Hampton Road Bridge-Tunnel that
The development in construction connects City of Norfolk and Hampton.
technologies have resulted in development
of major structure such as skyscrapers,
roads, highways, airports, ports, tunnels 3.2 History of SMART tunnel
bridges and etc. The main reason bridges are The Atlantic Avenue Tunnel, Brooklyn,
more preferable because of the cost and the New York that was built in late 1844 by cut
simplicity of the design and construction. and covers method for the Long Island Rail
Simplicity doesnt mean that bridges are Road. This is New Yorks oldest
easy to build than tunnel, but in certain underground tunnel for rail link (Labor Law
circumstances it does look easier. There are Talk Encyclopedia, 2005).
advantages and disadvantages of using The Channel Tunnel between France
bridges compare to tunnels. and England under the English Channel is
The advantages are it is cheaper the second longest tunnel in the world with a
compare to tunnel that needs expensive total length of 50km, out of which 39km are
budgets. The disadvantages are navigational under the sea (Labor Law Talk
consideration may limit the use of high Encyclopedia, 2005).
bridges or draw bridges spans when The Thames Tunnel was built by
intersecting with shipping channels such as Marc IsambardBrunnel together with his son
the Penang Bridge that intersects the Penang Isambard Kingdom Brunnel which was
Straits from the island to the mainland completed and inaugurated in 1843. This is
Butterworth with length at 13.5km. the first underwater tunnel and also the first
tunnel using the tunneling shield
(Wikipedia, 2005).

Figure 2: Thames Tunnel, London, 1943

The North Cape Tunnel in Norway


Figure 1: Penang Bridge, Malaysia
that was opened in 1999 is one of the world
However, the tunnel construction are more longest undersea road tunnels. It connects
expansive compare to the bridges but the the island of Mageroya with the main land
advantages are for navigational crossing, it that spans around 7km and reaches the depth
will be easier and more convenient to build of 212m below sea level. The construction
as it does not interrupt the movement of period was around 4years from 1995 to
busy channel Such tunnels are constructed 1999(Labor Law Talk Encyclopedia, 2005).
around the world such as the Lincoln Tunnel SMART Tunnel in Malaysia was
(Between New Jersey and Manhattan Island initiated by Malaysian government under the
in New York City . There are also leadership of the former Prime Minister Tun
combination of bridge and tunnels such as Dr. Mahatir Mohammad with the aim of
solving flooding and traffic congestion in
the city center of Kuala Lumpur. According from around 15 minutes down to just four
to Siao (2003) The SMART tunnel project minutes.
are located nearby the confluence point of
Sg Ampang river and Sg Klang river in the 5.0 Evaluation of SMART tunnel
north and ends at the lake at Desa Water Kuala Lumpur sits on karstic limestone with
Park .The total tunnel length is 9.7 km with a high ground water table. For this kind of
a bore diameter of 13.26m. Therefore there geology it was decided that tunnel boring
are two components of this tunnel, the machines (TBMs) would be the most cost-
StormWater tunnel and motorway tunnel. It effective and least damaging method to
is the longest multi-purpose tunnel in the construct the tunnel.
world. This project included the cooperation After much research, 13.2m Diameter Slurry
of local authorities, private sectors, and Shield TBMs were chosen. In terms of
some international engineer consultant. The diameter, these are among the worlds
Government Departments involved in this largest. The Slurry Shield TBM consisted of
project are the department of irrigation and four main parts:
drainage Malaysia and Malaysian Highway
Authority. For the private sectors are MMC Rotary Head Cutter, with tungsten
Berhad, GAMUDA Berhad and Mott pick bits used for excavation of soil
MacDonald. and disc cutters used for the
excavation of rock
4.0 Roles and Function of SMART tunnel Bulkhead, where a pressured
bentonite slurry shield is formed to
SMART tunnel played a vital role in provide stability during the tunnel
the city center of Kuala Lumpur Malaysia excavation
due to its technical feature. The 13.2m Hydraulic Rams, which were used
diameter tunnel consists of a 9.7km storm to drive the machine forward and
water bypass tunnel, with a 4km dual-deck keep the tunnel in its correct position
motorway within the storm water tunnel. Tunnel Lining Erector, used to
The main purpose of SMART is to solve the install the pre-cast concrete wall
problem of flash flooding in Kuala Lumpur lining
from the Sungai Klang and Kerayong rivers
and also to reduce traffic Congestion during In addition to the above, the TBM featured
the daily rush hour. The dual-purpose two bogies on rails that house electrical,
SMART tunnel begins at Kampung slurry pumping, ventilation equipment and
Berembang lake and ends at Taman Desa cables/pipes.
lake, diverting floodwaters away from the Both Slurry Shield machines started from
confluence of the two major rivers that run the JKR field area in Jalan Chan Sow Lin.
through the city of Kuala Lumpur. The 4km One machine bored northwards, under
motorway tunnel incorporated into SMART JalanTunRazak and JalanDesaPandan and
acts as an efficient alternative route from the ended at the lake at Ampang, behind
Southern Gateway of KL-Seremban Gleneagles Hotel. The other TBM bored
Highway, Federal Highway, Besraya and southwards, under the Jalan Chan Sow Lin
East-West Link from entering and exiting and the KL-Seremban Highway alongside
the city center. However, the tunnel greatly the SgBesi airfield and terminated at the
reduces the travel time between the Jalan lake in Taman Desa.
Istana Interchange and KampungPandan
Tunneling began in 2004 and was completed smoke from real Fire Fighting equipment
in August 2006. such as hose reels, fire hydrants and fire
extinguishers are located at every intervals
of the tunnel.
5.1 Three modes of operation
The SMART tunnel works on a three-mode Ventilation System
system: There are four ventilation shafts that split
MODE 1 the tunnel into three major divisions. There
Normal conditions. When there is are located approximately 1km intervals.
low rainfall and no storm. The The powerful ventilation suction fans will
motorway section is opened to constantly renew the air and maintain the air
motorists quality within the motorway. The lowest
MODE 2 channel where the Storm water is diverted
Moderate storm. The SMART during normal storm does not equipped with
system is activated and floodwater is any electrical devices. In case of the major
diverted into the bypass tunnel in the storm where the three decks of the tunnel are
lower channel of the motorway closed the mechanical ventilation will
tunnel. The upper channel will still automatically shut down in order to make
be open to motorists. way for the flooding of the tunnel.
MODE 3
The tunnel will be closed to 5.3 Importance of the project
motorists. Once all vehicles have
vacated the tunnel, automatic water- The project was specifically started
tight gates are opened to allow because of the frequent flooding in the
floodwater to pass through. metropolitan city because of the current
drainage system could not cater the
5.2 Safety Features of SMART tunnel increment of the yearly rainwater in the city.
Escape Route The city is located in the valley there for
The tunnel is fitted with escape route drainage system is very important to channel
every 250m of the tunnel. This passageway the water out to the nearby stream. Currently
connects not only from the decks to the water is channeled into the Klang and
external of the tunnel but also it acts as the Gombak River that is passing through the
crossway from one deck to another deck of city.
the tunnel. This facilitates people to escape These are the two important rivers
from the lower deck of the tunnel to upper that brought up the city. Kuala Lumpur is
deck in case of emergency at the lower the capital city of Malaysia that is
deck. The entire passageway is fitted with developing into a major business,
smoke doors and also fire resistant wall in administration, education and living hub.
order to facilitate the evacuation of the The project mainly initiated after numerous
tunnel in case of fire. studies conducted in Klang River that proves
the confluence of the Klang River/Ampang
Fire Fighting System River and also Klang River/ Gombak River
The tunnel is fitted with automated sprinkler is at the critical level and the river is prone
system the reacts when the fire sensors and the flash floods includes all the surrounding
smoke sensors activated. This sensor does vicinity. This process is further worsened by
not react with the vehicle smoke but only the the existing Tun Perak Bridge at the corner
Masjid Jamek which causes the flash flood system. This tunnel is used to drain out the
to happen almost frequently after heavy rain flood water from the Kuala Lumpur city
fall in the city. center and also to reduce the traffic
To overcome this problem a new congestion in the Southern Gateway (Sg.
water channel is needed to overcome the Besi Highway).
frequent flash floods in the city. SMART
Project was the solution to overcome the References
problem. This system will divert excess Thames Tunnel, Wikipedia-The Free
stormwater away from the existing water Encyclopedia, retrieved from
catchments area that is the Ampang/Klang http://en.wikipedia.org/wiki/Thames_Tunnel
River through a holding pond, a bypass on DATE 2013.
tunnel and a storage reservoir before it will Penchala Tunnel, Sprint, Sprint Info
released back into the Klang River. This is Centre, retrieved from
one of the proper solutions to solve this http://www.sprint.com.my/cms/AllProduct.a
problem because the existing rivers could sp?CatID=80 on DATE 2013.
not cater the large amount of water during Laerdal (2002) Worlds Longest Tunnel,
heavy storm. Another major task of the Public Roads Administration,
SMART Project is to reduce the traffic SoanogFjordane, retrieved from
congestion at The Kuala Lumpurs southern http://home.no.net/lotsberg/data/norway/laer
gateway. A portion of the tunnel about 3km dal/tunnel.html on DATE 2013.
will be a dual-usage, which is the Lincoln Tunnel, Lincoln Tunnel- Historic
stormwater management and road tunnel. Overview, Eastern Roads, retrieved from
This portion of the tunnel starts from http://www.nycroads.com/crossings/lincoln/
KampungPandan roundabout and ends at the on DATE 2013.
Kuala Lumpur-Seremban Highway near the Scott M. Kozel, (2003), Hampton Road
Istana Road junction. Area Interstates and Freeways, Roads to
the Future, retrieved from
Conclusion http://www.roadstothefuture.com/HR_Inters
Tunnels play a vital role in our way of life as tates_Freeways.html on DATE 2013.
it ease the method of transportation in urban TM Megaw& JV Bartlett, (1981), Tunnels
cities in the world. Tunneling works came in (Planning, Design, Construction), 1st
to being in eighteen century, the technology edition, Ellis Hardwood Ltd, Chichester.
and the construction method had developed O. Kusakabe, K. Fujita & Y. Miyazaki,
over time. The current technologies used in (1999), Geotechnical Aspects of
tunnels construction around the world are Underground Construction in Soft Ground,
becoming greatly develop and very efficient. A.A. Balkema, Rotterdam.
In recent years technology has introduced Hancock, N. (2005),Research Project
new sets of tunneling technologies such as ENG4111/4112 - USQ Study Book,
the tunnel boring machine (TBM). In this University of Southern Queensland,
paper, SMART Tunnel in Malaysia had Australia.
shown the new steps taken by the Malaysian
Government to upgrade the nationals urban
transportation system in the capital city of
Kuala Lumpur. This tunnel is a recipient of
so many accolades, it is the only kind in the
world that introduces the wet and dry

You might also like