Professional Documents
Culture Documents
Email: abhishekra9166@gmail.com
Phone no: 09660521294
Minimizing the rework cost in finishing section by standardizing the method / process
Implementation
Post implementation
monitoring
Keywords:
DHU (Defects per hundred units), Root
Cause analysis, Cause & effect analysis,
Kipling method, Ishikawa diagram
Student Name : Aastha Yadav
Email-Id : 03.aastha@gmail.com
Email-Id : arvansh01@gmail.com
Phone no: 8879469232
Faculty Mentor: Mr. T. S. Prakash
Industry Mentor: Mr. Sumit Kumar
(Asst. Merchandiser,
Bewakoof Brands Pvt. Ltd.)
An investigation to control measurement variation and reduce customer returns for knit
garments in online apparel brand
Email-Id : kanchanchy88@gmail.com
Develop competency based assessment on Advance pattern maker (CAD/ CAM ) &
Garment Cutter (CAM)
Background: Research Methodology: Analysis:
India has unique demography The Primary study was to
i: e 356 million 10-24 year olds understand the skills requirement
Study of National
population. According to the of CAD & CAM operator
Occupation Standard
Mckinsey Company, (NOS) of CAD &CAM job through deep study of NOS.
Productivity in Indian apparel role Assessment criteria were set
plants is low because they are according to the purpose of
sub-scale, lack basic assessment, context of
technology, and are operated Study of purpose of assessment, assessment venue.
inefficiently. While the apparel assessment Assessment questions were made
sector is small, its productivity For the competency based
rates are still two thirds that assessment tools/ question set,
of China. The Union Finance direct observation, viva and
Minister announced the Study of qualification level theory questions are prepared.
formation of the National Skill of target learners Each and every question is made
Development Corporation keeping the performance criteria
(NSDC) in his Budget Speech (PC is the sub-objectives of NOS)
(2008-09).The aim of NSDC is as reference.
to skill 500 million people in Online theory questions are made
India by 2022. For placement Derive the assessment as it is cost effective technique.
of trainee through skill methods &duration Students have to enter their
development there is need of reference id /name before
competency based attempting to question.
assessment. Competency Automatic marking will be done.
based assessment is approach Set the passing criteria for Report of no of students, marks
to establish occupationally each section of question earned, time taken in answering
relevant standards of set questions will be extracted in
competence .The emphasis is excel sheet. The link for CAD
on demonstrated competence question set is
important to profession rather https://testmoz.com/477499 &
than measuring knowledge in Decide the assessment the link for CAM question set is
isolation from skills or on venue &assessor https://testmoz.com/483059
measuring time spent in
academic education.
Keywords: Conclusion:
Objective: Develop Keywords: NSDC ,NOS , Apparel sector Competency based question for
competency based ,competency based assessment , assessor CAD &CAM operator has
assessment plan for the Job been made .However there is
role CAD & CAM operator further scope to make the viva
and practical more competent i:e
cost effective.
Student: Kartik Singh
Email-Id: krtik.singh@gmail.com
Email-Id : prashant.st27@gmail.com
Objective: Conclusion:
The following conclusions can be
drawn from the project:
This research project aims to Manpower development and
Results and scope for training is an up and coming sector
develop assessment criterion improvement in the Apparel and Textile industry in
for the following job roles, in
the Indian subcontinent.
accordance with the National With the current stance of the
Occupational Standard- Quality ruling government, the requirement
of industry oriented operators and
packs approved by the NSDC:
Conclusion professionals are always on the rise,
and therefore a standardised
Embroidery Machine Operator assessment module must be set up,
(Zig Zag) to provide the youth with proper
training and the industry with
Hand Embroiderer competent workers.
Keywords: (preferably 5) Though designing an assessment
Automatic Embroidery Qualification Pack, National takes much time and effort, different
Machine Operator Occupational Standard, Embroidery, methods of assessment and report
Assessment, Manpower. generation, using virtual interfaces,
can be utilized to make the process
more cost effective, easier to
complete and faster.
Student 1: SHIVANI PANDEY
Email-Id :
shivanipandey.326@gmail.com
Competetar analysis of kids wear private lable & benchmarking of its products
Pre-season planning, in season performance analysis of ladies ethnic wear private label
Conclusion:
Expected Outcomes Implementation of 90 days cycle
for merchandise display.
Improved visual merchandising
can attract the customer.
Proper training of the sales staff
can boost the sales up to 50%
Conclusion
by increasing the conversion
rate.
Dynamic Merchandise Planning.
Customer retention through
Keywords:
promotion rather than
KPIs, Competitor analysis, SWOT
discounts.
analysis, Survey analysis, Goldratt
theory
Name Akshay Avinash
Email : avn.akshay@gmail.com
Phone no: 07737174419
After duly observing project area The Existing SOP was observed
Study of the SOP of
it was found that Line setting and during the observation phase
time is a very prominent problem. execution of OB six line settings were looked to
A a slow line setting ruins the find the Major SOP violation and
temperament of line and it is other problems. This was later
observed that such styles go used to establish major problems
Observation of six line
through a constant fire- fighting. and then to design the solutions.
settings
From the study of style An Essential Checklist, A SOP
changeover procedure of Audit report and a Skill Matrix
previous styles, the first output Identification of the were designed as solutions and
was recorded to come as late as 6 then a pilot implementation of
major problems
days, which is exceptionally high. the solutions was done on other
six line settings.
Process Benchmarking and Standardization of Trim Stores in four units of Madura Clothing.
No. of Activities(Eliminated): 0
Keywords: No. of Activities (Combined): 24
Process mapping, Internal
Benchmarking, Kaizens, Process Total no. of improvements: 5
Standardization (implemented)
Name- Avinash Kumar Jha
Email: nift.avinashjha@gmail.com
Phone no: 07877993672
Name Ranjak Kavadiya
Email : ranjak187kavadiya@gmail.com
Phone no: 07726981322
Faculty Mentor: Mr. Ishwar Kumar
Industry Mentor: Mr. P M Devadas,
Head-Operational Excellence, Madura
Clothing AVINASH KUMAR JHA
RANJAK KAVADIYA
Process Benchmarking and Standardization of Fabric Stores in four units of Madura Clothing.
Monitoring of results
Keywords:
DMAIC (Define, Measure,
Analysis, Improvement, Control),
Re-work, Root Cause analysis,
Ishikawa Diagram
Name: Dimpu Vivek
Email : dimpuvivek05@gmail.com
Phone no : +91 8952967087
Faculty Mentor : Mr. Manoj Tiwari
Industry Mentor : Mr. Padmanabh Nayak, DGM-
Technical, Velocity Apparelz ,Egypt
CONTROLLING THE DEFECT RATE TO IMPROVE QUALITY BY USING TRAFFIC LIGHT SYSTEM
Keywords:
Home Furnishing,
Professionals,Product Rating,Vendor
Rating,Target Audience
Name : PRERNA BHARATI
Email :prernabharati0802@gmail.com
Phone no: 9166597659
Faculty Mentor: Prof. (Dr.) Raghuram Jayaraman
Industry Mentor: Mr Prithvi Raj Solanki, Asst. Technology
manager mens wear, TATA TRENT(Westside)
Keywords: (preferably 5)
FMEA, Risk Priority Number,
Rejection levels
Name: Roshan Rakesh Srivastava
Email : roshan.rakesh201@gmail.com
Phone no: +91 8946871824
Faculty Mentor: Mr. Yuvraj Garg
Industry Mentor: Mr. Anupam Singh, Planning Manager, OCL
Keywords:
Modular system, Lead time
Name: Shara Fatima Rizvi
Email : shararizvi@gmail.com
Phone no: +91 9166597486
Faculty Mentor: Mr. Janmay Singh Hada
Industry Mentor: Mr Imtiyaz Merchant, DGM-Planning, Lifestyle
International Pvt. Ltd
Keywords:
Just-in time, auto replenishment,
inventory
Name Shivangi Murari
Email - shivangimurari@gmail.com
Phone no - 09166450810
Faculty Mentor: Mr. Janmay Singh Hada
Industry Mentor: Mr. P M Devadas. Head of operational
excellence, Madura clothing.
To maximize the fabric utilization and reduce fabric waste in cutting processes
Keywords:
Cut order planning tool, Complete
cutting solution
Name :Aditi Chakraborty.
Email aditichak0412@gmail.com
Phone - 9533873084
Email: deepanshuohlan7@gmail.com
Phone no: +917207437849
Faculty Mentor: Mr Anant Phani
Industry Mentor:Mr Abhishek Kumar,
principle consultant and Mr. Vikash
Kumar, Ass. Consultant
Background:
Since, the fabric is the most costly Research Methodology: Analysis:
material and is 60-70% of the total cost Problem Identification Phase
thus, it is very important to make Detailed Study of the
Study the existing process
problems
cutting efficient and optimally planned.
Identifying the most
On the other hand, fabric has to be
important problem to be
handled delicately during and after the solved
relaxation process so that there wont Project proposal
Problem Identification
be wrinkle in the fabric. Cutting is the Analysis Phase
backbone of the garment industry and Analysis of the identified
a profitable factory could maximize problem
their return by minimizing the fabric Proposing solution for
Analysis and finding ways the problem
wastage as per the standard and aimed
to erase the errors found. Solution
to be not more than 1%.
Designed a layout for
So, this project aims at growing the proper flow of metrial
fabric utilization, reducing the material and larger lay length
handling and to increase the efficiency Benchmark study of the
Planning the new layout
of markers in CAD department. for cutting and fabric store CAD department to
increase the fabric
Objective: utilization.
To redesign the cutting and fabric
store. Conclusion:
Benchmark study of CAD
To do a benchmark study of -Reduction in material handling.
and implementation of
markers made in the CAD layout.
-Longer lay lengths were now
department and to increase the laid.
efficiency.
To optimize the space and machine -The efficiency of the markers
utilization in cutting department. Results and Conclusion increased and the fabric saving
was possible.
Market Research, Brand Mapping And Benchmarking of Arrow and U.S. Polo Shirts
Conclusion:
Competitor brands have a
Objective:
To undertake a comparative study Idea generation and varied kind of fit options which
Development
on the competitor brands and reflects their collection as a
conduct a market survey in cities unique segment.
like Bangalore, Hyderabad and They cover a wide range of
Chennai to understand the brand Results and Conclusion body built types with the
mapping against the competitor different fit measurements.
brands. Keywords: They have has a wide range
Market Survey, Benchmarking, Fit of fabrics including luxury
To interview Arrow and USPA store
issues
managers and get to know the clothing that is referred as a
demands of consumers for the entire separate sub-brand as Luxure.
size set.
Student Name: MANISH KUMAR
Student email:manish1160@gmail.com
Student contact no.: +917396996849
are as follows:
Reduction in current Keywords:
SMED, Apparel production, Changeover,
changeover time through Internal/External
implementation of SMED
concepts
Streamline activities related
to style changeover.
Photo of Student 2 for BFT
Student Vicky Kumar
Studentemail:vickyrj.nift@gmail.com
Students phone no:
9945383578
PROJECT TITLE
Conclusion:
Objective: Identification of gaps in Uniformity in spread of
To analyse and suggest only product range. options across the stores.
the best selling core formal Increase in core sales
options to be present in stores contribution.
(Shirts/Trousers/Suits &
Inventory with only best
Blazers). Analysis of product matrix selling options in stores for
and identified option core formals.
spread in stores regionally
Keywords:
Core Products, Assortment
Planning, Formal Clothing, Retail
Buying, Merchandize Mix
Rouni Nishima Minj
minj.rouni@gmail.com
+919916538290
Faculty Mentor:
Mrs. Sudha Singh
Mrs. Sweta Jain
Industry Mentor:
GBS Bindra,CEO,
Tagos Design Innovation Pvt. Ltd.
ENHANCING THE USER EXPERIENCE OF SHOPPING THROUGH E- COMMERCE
INTERACTIVE VIDEO
PROJECT TITLE
Background: Analysis:
With an increasing Research Methodology: Data comparison and
competition among the fast evaluation
growing fashion retailer, it is .Step 1 Identify criteria for Evaluation through tools
imperative to develop vendor evaluation chosen
strategic options with the
suppliers that can deliver on- Conclusion:
time, high quality orders at Vendor A stood out to be
.Step 2Weigh Each the best with score of
reasonable prices.
Evaluation Criterion and 4859.77, followed by E
The overall objective of the Sub Criteria (4576.8273), B (3199.73), C
research has been to reduce (2615.13), D (2268.11)
purchase risks such as poor respectively.
supplier quality, delay in The continual evaluation
.Step 3 Data Collection on
timely delivery, delays in Each Criterion should be carried out on a
supply chain activities and seasonal basis and best
maximise overall value to the vendor for each season
purchaser by identifying
should be recognised.
appropriate suppliers that can .Step 4 Awarding Points
provide quality goods at the to Vendors on Each
Criterion
right time, at right cost.
Objective:
To manage vendors by .Step 5 Final Analysis &
Recommendations
evaluating and selecting them
(on technical grounds) in
accordance with the
parameters chosen and create Keywords: (preferably 5)
a module for the same. Vendor Evaluation, selection,
rating, ranking evaluation
criteria
Ayush Shakya
Ayushshakya0108@gmail.com:
9538773818
71%
Keywords:
End of ply loss, End bits, Edge loss, Cut Conclusion:
plan validation, Remnants The losses are great as the industries have
evolved from leather industry and work in
the same manner resulting unorganized
work flow.
Student Name: Saurav Raj
Student email :rsaurav16@gmail.com
Students phone no: 9742240236
Student Name: Sabera Gupta
Student email :sabera.gupta52@gmail.com
Students phone no: 9035115171
Faculty Mentor: Mr. Joseph Regy
Industry Mentor: Ms. Mausmi Ambastha(COO
& Co-founder, Threadsol)
15 11
feed dog and folders etc. in Approval & Impact
10 7 6 6 6
construction process of 5
5
garments so that there comes Before
0
least defects and reworks & After
hence improved quality and
productivity level.
Objective: Conclusion:
Keywords: (preferably 5)
Primary Objective From the overall study done during
To standardize the Quality the project and from the outcome,
sewing process and Sewing tools it can be concluded that:
tools Standardization
Defects Even the defects can be
Secondary Objectives Process Improvement reduced in sewing section
To create defects Fabric-Needle-Thread which accounted to 75%, just
database with their combination by developing a Virtual
causes & solutions Technical platform;
therefore, it becomes
To study styles and innovation along with cost
identify defects effectiveness.
To identify whether
there is significant Majority of defects coming in
difference in defect sewing section are due to
occurrence between communication gap leading to
different styles or not trial & error approach;
therefore, with adequate
To study and analyze the knowledge given to
technical details of operational staff defect
garments percentage can be reduced,
quality can be improved and
To create Virtual efficiency can be increased
Technical Solution leading to better ROI.
PROJECT TITLE
Result by the derived costing of new
Background: Research Methodology: products:
Peter Englands wide range of
category includes core & non COSTING COMPARISION (TROUSER) target set of 30 %
core products, which have Phase I Quantitative PC MRP (should be 30 % or less than it for more profit
their own uniqueness. Peter analysis of sales data margins
In House Project
Development of Interchangeable Lock & Chain Stitch Se wing Machine
Objective: Conclusion:
Develop a sewing The research aims to improve
Step 5:Considering the production efficiency and
mechanism with small
materials or components to product quality. A fully
attachment to the machine
be used for the research functioning integrated system
to stitch both Lock and
will demand much more work
chain stitches. and significant funding. It also
Determine possible appears that the approach can
methods to combine two Step 6:Making a working be economically viable, based
machines. model of sewing machine on other evaluations.
Formulate proposals which will meet the
industrial standards.
depending on practical
constrains.
Student Deepinder Kaur
Deepinderkaur2@gmail.com
+919677036885
Faculty Mentor: Mr. Amit Kumar
Anjanee, Assistant Professor and
RIC, DFT Chennai
Industry Mentor: Ms Aparna
Venkatesh, Buying Manager
Indian Terrain
PROJECT TITLE
3. Drafting the User interface Monitor and review It clearly segregated the roles of both
the processes until
for online reporting success departments and no one from the
Keywords: other department will have the
system.
stream lining, Trims and authority to interfere.
4. Redefining the process
Accessory, SOP, Layout, Traceability, Accountability ease of
Flow.
Process Flow, Online working supported by online
Reporting reporting Formats
Student :
Anubhav Kumar Dalmia
Student Email:
akdalmia001@gmail.com
Student Phone no:
+918056192703
Faculty Mentor:
Dr. Divya Satyan
Industry Mentor:
Mr. Ashok R
Global I.E. Head
Aquarelle India Pvt. Limited
Bangalore.
REIGNING IN COSTS SUSTAINABLY
. Keywords:(preferably5)
Android Application, Non value added
but necessary activities, reporters
attendance, quality, production
Shaheen Sheikh
shaheen.sheikh.93@gmail.com
7845740191
Shruti Gera
shrutigera19@gmail.com
9940094531
Faculty Mentor: Ms. M.
Padmapriya, Assistant Professor
Industry Mentor: Ms. Kalika
Sharma, Senior Merchandiser,
Rupayan, Jaipur
A RESEARCH STUDY ON JAIPUR GARMENT EXPORT CLUSTER
Background: Research Methodology: Analysis:
Jaipur is one of the The industry branches in which the
developing garment clusters SECONDARY RESEARCH firms operating in Jaipur Garment
in India that offers huge Sources like magazines, e-journals, Manufacturing Hub can be
potential towards the and websites. broadly categorised into are
overall garment export Apparel especially Ladies Wear
business constituting 7% of and Kids Wear, Home Furnishing
the countrys exports. PRIMARY RESEARCH and others like Bags.
Moreover, despite being a Identification of Associated Garment
Since Jaipur is commonly known
significant garment hub in Departments and Research Locations
to produce small order
the country, there has been quantities, most of the
no previous research to companies follow Piece-rate and
promote the cluster and Assembly Line System to carry
help its development in Setting a Sample Size and out the production.
becoming more efficient in Identifying Respondents The main buyers are based in
its contributions towards USA, Europe, Japan, and UK.
establishing global The main suppliers of Fabric,
significance. Though its Trims and Dyeing & Printing are
history being from the royal Research Tool Finalisation based in Gujarat, Tamil Nadu,
age, it is a relatively new Maharashtra, and Rajasthan.
cluster that needs to exploit Labour wages are less compare
its potential by working on to the other clusters within India,
its strengths and venturing which results in lower production
into new areas. Therefore, cost and higher profit margins.
there is a need to study the Jaipur Garment Export Cluster
Primary Survey
competitiveness of the mainly caters to Japanese
cluster on the global Market since it does not require
platform for it to create an any stringent compliance system.
identity for itself and
develop its unique potential. Data Analysis and Interpretation
Conclusion:
Jaipur has a lot of scope for new
businesses to come up and
Objective: existing ones to expand. Whereas
To get an overall picture of Keywords: the Infrastructure, Land Availability,
Jaipur Garment Export Export, Infrastructure, Labour, Labour Cost, Uniqueness are its
Cluster and its feasibility as a Government Support, Compliance, strengths; it lacks in Labour
garment export destination. Uniqueness, Competitiveness Availability, Government Support,
Compliance, and Sustainability.
Student Name: ANJALI SAHU
Student email :
anjli.nift@gmail.com
Students phone no:
+91 9952922361
Faculty Mentor: Mr. Praveen D.
Nagarajan
Objective: Conclusion:
To develop a module that Expected Deliverables include a
would provide basic training and implementation
Keywords: module based on a thorough study
knowledge to IE executives
and supervisors in garment Lean Manufacturing, Guide, IE of requirements, which would serve
manufacturing factories Executive, Supervisor, Garment as a quick start guide to IE
(belonging to MSME category) Manufacturing executives and supervisors in MSME
about the important tools and garment manufacturing units, and,
principles of Lean an overall increase in the
Manufacturing, and how to understanding of Lean tools and
implement them principles amongst said employees.
Amit Kumar
amitsudoku@gmail.com
+91-8750751886
Priyanka Singh
Priyanka.s.nift@gmail.com
+91- 9555031046
Faculty Mentor:
Ms. Riju Jakhar
Mr. Deepak Panghal
Vaishali Rai
akshaya.vaish@gmail.com
09654928775
Conclusion:
Objective: - The current process loss in
Possible reduction in fabric
To study possible wastage by streamlining Delhi/NCR and Bangalore region on
streamlining of cutting room cutting floor process
an average is pegged at 14.3% with
in home furnishing industry. Delhi/NCR average at 14.9% and
Bangalore region at 13.5%.
To determine improvement
Differentiating home -With better buying planning fabric
in fabric optimization in the furnishing industry from
industry in cutting room. apparel industry loss is expected to come below
10%.
Identifying process flow and
material handling and -With reduction in end bits by
identify the differences in Keywords: better end bit planning, the
the process from the Buying optimization, Home furnishing process loss can be brought
garment industry. down within 10%
industry, Roll Allocation, Process Loss,
End loss
Sheikh Kashif Faiz
kashif.faiz@ymail.com
Vaswee Dubey
Vasweerocks@gmail.com
Faculty Mentor: Ms. Bhavna K.
Verma
Industry Mentor: Mr. Raman S., V & S
International, Gurgaon
CALCULATOR TO PREDICT TIME REQUIRED FOR AN ORDER TO PROCESS IN CUTTING
SECTIONS OF A GARMENT PRODUCTION FLOOR
Background: Research Methodology: Analysis:
To face and solve the problems This calculator predicts time
of clothing industry, the Review of Literature required in major activities in the
efficiency of each link in apparel cutting section for a garment order
production must be enhanced. hence finding an application in
Research on prediction of production planning process. It
apparel production capacity is helps in: Various aspects of cutting
important for clothing capacity measurement, Total
enterprises to arrange the Time Study Cutting time, Determining time
production planning, increase delays for each process. The
the production efficiency, and calculator has:
save production cost. The (a) A front end that is user
production capacity of clothing friendly and requires the input
cutting depends on the time of values for factors that the
spreading, marking, notching Correlation and Linear Regression processing time will be dependant
and inspection, cutting, Analysis on.
bundling and ticketing. (b) A back end based on a
Usually, I.E. tools are required linear regression equation that
to calculate the cutting establishes relationship between
capacities in garment the users entered values to the
production units. processing time in various
Implementation into software
departments.
Objective: (c) The linear equation above is
To create a calculator to based on Spreading time, Marking
predict the time required for Time, Notching and Inspection,
an order to process in the Cutting Time, Bundling and
cutting sections of garment Ticketing.
Validation
production floor.
Conclusion:
By statistical analysis of the
processes involved in cutting room,
a mathematical model can be given
to make predictions about order
processing time eliminating the
Keywords: need to conduct time study for each
Capacity Planning; Influence Factors; garment style.
Time Calculations.
Manu Srivastava
manusrivastava74@gmail.com
09953965610
Faculty Mentor:
Dr. Archana Gandhi
Industry Mentor:
Ms. Geetika Shanker, Sourcing Head
Samiran Hazarika
samiran.nift@gmail.com
+91-9871698678
Keywords:
Buying Process, Assortment Plan ,
Consumer preferences, Large Format
Stores, Merchandize Planning,
Optimization
Rahul Kumar
rahul.rattu90@gmail.com
Surabhi Pandey
spnd93@gmail.com
Faculty Mentor: Prof Dr Prabir Jana/
Mr Deepak Panghal
Industry Mentor: Mr Amit Kumar,
TCNS, Noida
1. To create an optimised
lighting condition during
garment stitching.
Feedback and improvement
2. Reduce the eye strain of
sewing operator
Conclusion:
The suggestive planning process along with
Development of the buy guide provided through this project
Assortment Plan with Buy is an effective tool for pricing decisions and
Guide assortment planning for upcoming private
labels for any online retailer. The project
provides a model from price point analysis
Keywords: to creation of a buying guide trough use of
various methods like competitive analysis,
E-Retail, Assortment Plan, Pricing, Conversion depth planning to create a sales driven
Rates, Options & Depth assortment exclusively for shirts and
trousers, but the methodology is applicable
to any clothing product.
ABSTRACT
Student Name1: Mamshi Oshin
mamshi16@gmail.com
Students phone no: 9654359157
Student Name2: Sanyam Tripathi
Industrial Engineering is Primary data collection (Time study, The productivity and efficiency
concerned with the design, motion analysis, method study) levels of the stitching section
improvement, and of the company were found to
installation of integrated be very low when compared to
systems of people,
the international standards. To
materials, information,
make improvements on these
equipment and energy. It
Identification of bottleneck process fronts, IE and work study
draws upon specialized
knowledge and skill in the techniques needed to be
mathematical, physical, and implemented. Various
social sciences together observational methods (time
with the principles and study, method study, motion
methods of engineering analysis) were conducted and
analysis and design to Idea formulation and selection the results were analysed.
specify, predict, and Post implementation analysis
evaluate the results to be was donr and appropriate
obtained from such system. measures were taken to rectify
them.
ISHAN SHRIVATAVA
Email- ishu25.77@gmail.com
Keywords:
LEAD TIME, DELAYS, FOLLOW UP, POIINTS OF
REJECTION, SUGGESTIONS.
StudentName1.Himanshu ahlawat
Student email :himanshuahlawatnift@gmail.com
Students phone no:08894341984
StudentName2(BFT)Paru baba..
Student email :parukamra5678@gmail.com
Students phone no:7838482589
StudentName2(BFT)Pulkit Sharma .
Student email
:pulkit0sharma@gmail.com
Students phone no:9736772208
Faculty Mentor: (name)Mr.. NIRAJ
JAISWAL
I
PROJECT TITLE
SEETING-UP A DENIM FACTORY
Developing strategies for dispatch & delivery process maintaining established optimum delivery
date/time
Background: Research Methodology: Analysis:
As of now the company LimeRoad.com is an aggregator of
maintains a record of approx many brands. The company was
Data Collection &Analysis
80%, in terms of timely lacking to achieve its set targets
dispatch and delivery of for dispatch and delivery. To find
goods to the end customers. out the reasons for delay in
Since for an e-retailing dispatch, telephonic conversation
company, dispatch and was held with vendors and points
delivery of products while Identifying the factors were: Inventory issue/out of
maintaining the accuracy is contributing to the problems stock, Training issue, Packaging
extremely important, this material shortage, etc. Unicom /
project will strive towards uniware, Training guide &
improving the current rate Automated Packaging system
by analyzing the loopholes in were proposed & implemented,
the present system and then Prioritization of reasons which added in the increment of
devising strategies for its contributing to the problem achieving set targets.
improvements.
Conclusion:
Objective: Since, for any e-commerce
venture- time accuracy, quality,
Planning strategically the
To identify the feasible solutions to the and order accuracy (shipping
reasons for delay in problem exactly the product ordered), easy
dispatch & delivery of returns and refund policies. This
products to the project targeted the time
customers component. After analyzing the
Implementation of the data collected loopholes were
To suggest solutions solutions tabulated. Then certain strategies
to address the were devised for the major issues
reasons for delay and proposed the same. This
added in the increment of
achieving set targets of the
To arrive at a perfect company in terms of timely
Evaluation through charts
delivery model and graphs dispatch and delivery of products
as well as gave an opportunity to
have track on the orders.
Keywords:
Inventory Issue, Pick Up Issue,
Packaging, Unicom/Uniware, Training
Guide
Student PRASHANT TYAGI
Student email prashant16tyagi@gmail.com
Students phone no - +919968800578
Background: Analysis:
Procurement of fabrics and Research Methodology: The overall delivery
garments considered the performance of Vendor C is the
crucial step in supply chain highest thus it is the best choice
Study buyer manuals and analyze the spec
management of many buying
sheets. for the orders which have tight
houses. During the hyper
growth phase of the industry, schedules or strict buyers in
quality of delivery and service terms of delivery, quantity and
are often the major problems. quality must be given to this
During the periods of decline, vendor.
lower purchase volumes Developing a questionnaire having all the
threaten the viability of relevant questions to be asked from vendors. Conclusion:
suppliers. So, the buying house 1. Establishing the parameters
must be capable of identifying for vendors at East End
the best source for a particular Apparels.
type of order. Vendor
evaluation is a crucial process Selecting merchandisers, and quality team for 2. The project resulted in
to identify strengths and establishing the parameters. preparing a standardized
weaknesses of vendors which format for data collection
can help the company to against each of the parameter.
manage their vendors.
3. The project also facilitated
Objective: Deciding the parameters basis of which the calculation of the score
1. To understand the the vendors would be evaluated. value, so that the performance
requirements of the high of the vendors can be checked
fashion customers. on a regular basis.
Keywords:
Ishikawa diagram, Pareto chart,
Defects, Quality guide, Reworks
Student Name: Arsheen Chopra
Student e-mail:arsheen.chopra04@gmail.com
Students phone no: 0-8447822079
Faculty Mentor: Mrs. Chavi Goyal, Assistant Professor, NIFT Kangra
Industry Mentor: Mrs. Vinita Arora, Category Head, Satya Paul, Genesis
Colors, Pvt. Ltd.
EFFICIENCY ADVANCEMENT THROUGH WORK AID DEVELOPMENT AND METHOD REDESIGN WITH
SUBSEQUENT TRAINING OF OPERATORS.
Objective:
Primary objective:
- Devising a structured SMV Accounting labour wage
criteria of Bangalore
library for basic products in mens
wear category.
Keywords:
Style Study; Machine attachments
coding; Standard Article description;
Attachment library; SMED
Student Name1 Diya Mondal Photo of student 1 for BFT /MFT
Studentemail
:mondaldiya@gmail.com
Students phone no: 8893531447
Faculty Mentor: Mr Rajesh Kr Jha
Industry Mentor: Mr Suresh Kr
PROJECT TITLE
'Standardization of Time & Action (T&A) calendar using critical path method and calculating
correct lead time in USPA mens knits wear'
Conclusion:
Vendors should not face general
problem while production as
To analyse the results of adequate data is given to vendors
Objective: the new process and bring and Arvinds team follow up every
To study the process down conclusions process
in details Delay in factory will cause time
loss which will ultimately affect the
Calculating correct profit of vendors only.
lead time Without any sever reason vendors
Standardize and should not get delay. Reason
should be noted for future
streamline time and preferences.
action calendar Vendors should properly plan the
(using critical path capacity for getting right quantity
at right time
analysis) As size set sample and fit sample is
Keywords: not required lot of time is saved.
2nd drop orders should not be
Time & action calendar, lead time,
planned according to 1st drop
process study, standardisation, critical order.
path method.
Name : Ekta Kumari
Email:ekta.niftkannur@gmail.com
phone no : 9746345031
Keywords: (preferably 5)
QUALITY CIRCLE, A.Q.L.,
D.H.U.,TRAINING PROGRAM
Student Name - Manisha Rani
Email : manisharani.nift@gmail.com
Phone no: 09633298705
Faculty Mentor: Mr. P Chakravarthy
Industry Mentor:
(Mr. Rohan Dwivedi- Category Manager)
Myntra.com, Bangalore
Standardization of fit for mens active wear in different product categories for a private brand
Faculty Mentor:
Mr Rajesh Kumar Jha
Industry Mentor:
Mr Gaurav Kumar
Associate Consultant,
Apparel Consulting and Sourcing Services
Present scenario of high labour Redesign of Layout and -Automatic counting of Products.
cost, scarcity of skilled labour Basic Material Handling
and fierce competition from system -Design of Electricity generation
neighbouring countries leads us model from sewing machine to
to only way of automation. reduce power consumption in unit.
Development of
-Designing of Different Reports to
Automation System
Objective: be used by Industrial Engineering
Department in made Ups.
To Improve the efficiency
and productivity through Conclusion:
Design of Different Report
automation of sewing format for IE department The designed models are capable of
section in made ups. Reducing man power effort &
motion, Saving of electricity
Designing of Different (indirectly reduction in
Report Format For IE Keywords: (preferably 5) manufacturing cost) which leads to
Made Up, Layout, Automation process, improving efficiency and
Electricity Generation, Industrial productivity of Made Ups Plants.
Engineering Reports
STUDENT NAME: PRASHANT VERMA
STUDENT EMAIL : prashantjohari@hotmail.com
Apparel sector is one of the Study and understanding about The number of initiatives and
complex and fast moving industry the QP-NOS projects surrounding skills
in the world. But like any other development in India is beyond
profession it lacks the minimum that in any other country.
Responsibility for producing
qualification and skill required to Studying and understanding about
National Occupational Standards
perform job under this. The jobs NSDC, SSC and governing bodies.
in conjunction with industry.
are not well organized and settled Recruiting employers for work
in certain rules of health and placements and workplace
safety only. For the development To study the required skill sets Training; providing quality assurance
of a sector it is very important for and auditing for those employers.
a job to be benchmarked in a way Knowledge of reporting formats
knowledge of standards of
that it should be competence To compare the existing NOS at practice
w.r.t measured skills, ability, National & International Ability to interpret sensory
attitude, knowledge and manufacturing engaged workers. observations to determine
understanding and performance component condition
criteria. Apparel sector deals with Ability to communicate findings in
quality and rate of production Centre evaluation & inspection report.
Data Analysis and Findings
significantly so it becomes more
important to match those Conclusion:
There is a big gap between the
parameters with employee skills Design and develop new tools to
required skills and competent skills
so the job roles. make training practices more
in apparel sector. The gap is because
effective.
of training partners and lack in
Objective: competency based assessment.
To ensure that the With working with il&fs got
training system delivers the skills Scope of the project opportunity to fill the gap from my
that our sector employers need role. Developed set of questions for
to create marketable products Basic apparel pattern making;
and compete successfully. Implementation & Evaluation of Sewing machine operators; garment
To provide commercially result. manufacturing technicians Job role.
sustainable & integrated solution Also developed and implemented
for development of Apparel Keyword: assessment modules and tools for
sector that would enable them to NSDC: National Skill development strong assessment in pan India in My
become globally competitive. corporation graduation period with Il&fs clusters.
SSC: Sector skill council
QP: Qualification pack
NOS: National occupational standards.
RAVI PRAKASH
Ravi.nift14@yahoo.com
+919916850637
Faculty Mentor: Mr.N.Muhilvannan
Industry Mentor: ARUN
MISHRA(Mens category Head)
INMARK Retail Pvt. Ltd Bangalore
PROJECT TITLE: Improvement of Productivity, Efficiency of unit and reduction of costs through work
study
REDUCTION IN REJECTION LEVELS & IMPROVEMENT IN FIRST TIME PASS RATE THROUGH
RIGHT FIRST TIME IMPLEMENTATION
Background: Research Methodology: Analysis:
The fast changing economic The analysis of repair rate, end of
conditions, such as global line & rejection reports is done by
Current condition data means of pareto chart to
competition, declining profit grasping & target setting
understand & identify defects in the
margin, customer demand for
Sewing line and target the
high quality product, product maximum occurring defects to
variety and reduced leadtime reduce it in the production process.
etc. play a major impact on Further analysis of these defects is
Activity plan
apparel manufacturing done by means of root cause
industries. It pushes the analysis to give the corrective
manufactures to reduce their action plan and preventive action
plan to avoid such defects in the
production cost without
Root casue analysis for production processes.
compromising quality in order
problems
to survive in the business Conclusion:
arena. The demand for higher The project explores the
value at lower price is effectiveness of implementing the
increasing and to survive, right first time concept to minimize
Set up & carry out counter
apparel manufacturers need to the defects & rejection rate in a
measures
selected garment factory. The
improve their operations by
defects library & video library that
producing Right First Time are the outcome of this project play
Quality. Right First Time a crucial part in the training process
builds a habit of creating a Check Results to ensure Right first time Quality.
good quality piece every time The project improves the quality
through its mistake proofing performance of the critical
techniques and operational process, leading to
better utilization of resources,
standardization of all the
decreases variations and maintains
system and methods . Standardize & root control consistent quality of the process
output. The outcome of this project
reflects that an industry may gain
Objective: higher productivity and profitability
Keywords: Right First Time Quality, with improved quality product by
1. To ensure that the pieces
Rework, Rejection minimizing defects. It also minimizes
produced by the operators is
at par with the quality cost and improves internal
standards of the company in throughput time.
the first time.
Research Methodology:
Background: Analysis:
Processes and activities The overall process and activities
Following and keeping
of Buy in gagent. The for
update regarding ongoing
order styles. All the information shared
Execution process, from between
Supplier and buyer . From those
Originals watch
Information the working position
development, And status of particular suppliers
Confirming PO to quality Maintaining the Submit
and their vendors with the buying
Check at the time of form for the main buyer, agent.
shipment.
Conclusion:
Proper Information sharing for
Objective: Observing and analysing the Products between buyer and
To observe the buyer comment and approval/ Supplier is very essential for
knowledge rejection rate particular the
Flow and data Fulfilment of the order
management properly.
Between buyer and It also shows the supplier
Analyzing the overall Data
supplier. Performance and clarity
regarding a particular style
through
To analyze the overall The entire process with the
Process and methods for Buying agent.
Information sharing
between Making overall report for the
buyer-supplier. suppliers according to their
performance clear data
To observe the role and
Activities of merchant
and
QA team in the process of Keywords:
Information sharing. Knowledge Flow,
Buyer-supplier communication,
Information sharing,
Supplier evaluation,
Strategic merchandising
Student Name: Vidush Mukesh
Student email :
vidushmukesh@outlook.com
Students phone no: 08376827288
Objective:
To remove the unproductive
activities and reduce time lost Keywords: (preferably 5)
at every stage. Lead Time ; Sourcing Process ; Costing ;
Accordingly, forming the next ; Vendor evaluation ; Product
seasons Product development development Calendar
Calendar with revised timelines
and activities.
Student Name: Ali Sher Waris
Student email :
alisherwaris@gmail.com
Students phone no: 08274858508
Keywords: (preferably 5)
Sweat-stain, hydrophobicity,
hydrophilicity, high moisture
management property,fluorocarbons
Student Name1 : Ankur Sharma
Student email :
ankur.nift.1115@gmail.com
Students phone no: 9530778934
Background: In Shahi Exports there was a need Research Methodology: Analysis: The critical operations were
to develop training module for training the identified and the collar band finish
operators in critical operations. To attain the was selected as the example
required productivity level the critical Step 1 Ttime study operation for developing training
operations cannot be ignored as the less module. Training was imparted and
trained operators cannot achieve the target cycles were recorded and timed also
and create bottlenecks in the whole line. ,with help of stop watch and recording
the operations . The output quality
was assessed and work cycles
Step 2
Objective: To develop training modules for repeated again to reach high speed
training operators in critical operations Analyse the productivity and good quality both.
incorporating the theory of learning curve.
Conclusion: Training module
developed successfully incorporating
the theory of learning curve. The rate
Step 3
of learning , S, varied from 90-97%
Developing example
training module
Step 4
Impart training
Step 5
Assess the trainee
Step 6
Check learning curve
Keywords: (preferably 5)
Keywords: Keywords: Keywords:
Keywords: Keywords:
Student Name1 : Chitrangada Roy
Student email : chtrngd.roy@gmail.com
Students phone no: 9477496296/9477376059
PROJECT TITLE: Increase in Sale Volume of Womens Ethnic Wear Max Retail (Kolkata) through Marketing Strategies.
Step 6
conclusion
Keywords:
Retail,competitors,segmentations,promotion,brand
value.
Student Name1 Kashi Nath
Student email : kashi.niftkol@gmail.com
Students phone no: 8820888876
Keywords: (preferably 5)
Keywords: Keywords: Keywords: Keywords:
Keywords:
Kritika Bharti (BFT)
bhartikritika2012@gmail.com
9038572493
A visual merchandiser looks after Visit KOLKATAs NIKE There was considerable increase in
more than 20 stores simultaneously stores footfall and increase in sales was
which is a very difficult task for also observed, Ease of customers
them. increased in terms of material
handling.
Giving thorough VM training with all The project ends with increase in
the minute details to a salesperson sales and customer satisfaction.
in the store to elevate the brand Approve them as VMC
and the work force available.
Keywords: Visual
merchandising, Display,
Footfall, Salesperson,
Training
Student Name: Nairita Mondal
Student email :
nairitamondal07@gmail.com
Students phone no: 09674874180
Faculty Mentor: Mr. Abhijit
Mukherjee and Ms. Anamika
Debnath
Industry Mentor: Mrs. Ritma Ravi
and Mr. Rahul Anand
(Visual Merchandising Executive at
Creyate, AIL)
Preparation of the VM
Manual.
Keywords: (preferably 5)
In-Store Dcor, Competitive Bench
Marking, Market Survey, Visual Display
Rules, Visual Merchandising Manual
Neha Kumari
nehabedya@gmail.com
9038360636
Faculty Mentor:
Prof. B. Banerjee.
Industry Mentor:
Aquarelle India Pvt. Ltd., Jigani,
Bangalore
Mr. Ashok R, Global IE Head
Mr. Rajkumar, Lean Executive
COMPARISON OF SOFT, HARD DRESSFORM AND LIVE MODEL FOR FIT ASSESSMENT
Objective:
Step 5
To do the industrial
mapping of the eastern SWOT Analysis
states (Bihar, Jharkhand,
West Bengal & Odisha)
globally and according to
companies specific needs
for finding the scope of
Step 6
investment in these
states. conclusion
Keywords:cluster,minimumwages,government
policy,compliance,land rates.
Student Name1 : Radhika Agarwal
Student email :
radhikaaga92@gmail.com
Students phone no: 9415047462
Step 5: development of
software
csnift@gmail.com
08820888876
A.SaiGaurav
Saigaurav.nift@gmail.com
07278132593
Faculty Mentor: Mr. J.Pari
Turtle is a well known company Review of existing With the help of Posture
manufacturing mens apparels.It literature study,method study and time
includes TURTLE,LONDON study we came to know about the
BRIDGE,LOMBARD.It is located in MSDs and unwanted activities
Shibpur,Howrah,West Bengal. Posture study- consuming time more than
required.Then Ergo chair and Box
Objective: carrier were introduced and
Analyze production and improve changes were noted and
productivity using I.E tools. compared.
Time study-Of all
Eliminate the MSDs and unwanted
operations and unwanted
activities. Facilitate the workers Conclusion:
stress free working conditions. activities.
Implementation of this project will
lead to
Increase in efficiency of the
Questionnaire-to know
operations as MSDs will be
about operators opinion
reduced to maximum extent
on present working because of the Ergo chair and
conditions and problems Many unwanted operations related
they are facing. to the material handling and
transportation of cut parts, will be
eliminated due to the box carrier.
.
Development of ergo
chair,box carrier and then
noting new records and
establishing the
difference from the
existing
Keywords:
Ergo chair,boxcarrier,MSDs
Sana Mumtaz (BFT)
Sana.Mumtaz@Mothercare.com
7022833104
There are 44 departments in Review existing blocks on Project done on five garment types of
Mothercare categorized by Phoenix & accordingly three departments, comprising of 258
products and size range. Each prepare grading chart blocks. A total of 41 blocks came out
department has more than 200 of these on consolidation on
blocks in block Library. Few similarity. This will take less time to
Blocks are there with variation upload a spec for any style as less
in measurements on the Learn grading from number of blocks will prevent
common measuring points. technical manager and technician from confusion, and
Flow of Specs is varying from accordingly make changes standardization of blocks will provide
Dept. to Dept. It causes wrong an accurate fit irrespective of change
spec uploading leading to in departments.
wrong fit and involves both cost
and time. Develop samples on new Conclusion:
grading and approve them
Objective: on fit Implementation of this project will
lead to
Reduce number of blocks to Increase in efficiency of Garment
minimum required. Techs in Specs Uploading,
Combine blocks for a style Consolidate similar blocks Time saving for Techs & Factories in
having minor differences like of different departments Sample Development.
sleeves (Short Sleeve, Long into a single one Reduction in sample rejections &
Sleeves, Sleeveless, etc.). rework.
Define grade rule among sizes. Altogether this will save both time
Make the size chart which is in and money.
flow line from lower sizes to Calculate the cost incurred
upper size range. on wrong fit samples due
Create co-relation between to wrong blocks
block of all departments so that
its in flow line.
Segregate blocks style wise.
To develop and standardize a
common block for same type of
styles. Keywords:
Faculty Mentor:
Mr. Jyoti Prakash Behera
Industry Mentor:
Mr. Pranav Ranjan
Production Leader industrialization
Decathlon, Bangalore.
Faculty Mentor:
MR. Bikas Agrawal and
Mr. Shahabuddin Ashrafi
Industry Mentor:
Mr. Sumit Sahni (Factory GM)
COMPARISON STUDY OF PRODUCTION LINE BASED ON LEAN PRODUCTION TECHNIQUE, UPS (UNIT
PRODUCTION SYSTEM) AND PBS (PROGRESSIVE BUNDLE SYSTEM)
Background: Research Methodology: Analysis:
Development of Size Chart for Plus size Women ( Age 25-45 Years)
Background: Research Methodology: Analysis:
The Lancet says India is just a few Each clothing item serves a
notches below the US and China in Step 1: Survey to establish the specify purpose and sends
the obesity pecking order. fit issues in Ready to wear plus messages to others as well as
Heavier customers, who earlier size Apparel the wearer. Getting the fit
resorted to neighborhood tailors, right, however, is a challenge.
are now adding to the demand for As bodies get bigger, they have
ready-to-wear apparel. a wider variety of shapes,
Its a segment whose need to turn Step 2: Taking actual Body industry executives say.
out in style is as compelling as measurements of the plus size Absence of a proper study in
that of the size zero. Women. body sizing and adoption of
Technopak says the plus size standardized measurements
market in India at this nascent for the entire country is
stage, is worth almost Rs 11,000 missing.
crore and is on an upward Step 3: Statistical analysis of
trajectory with an estimated collected data Conclusion:
growth rate of 25% per annum. Many fit problems are
caused through unrevised
Objective: size system, ideal figures,
Development of size Chart Step 4: Development of size and vanity sizing.
Study Of Body Type Chart The use of numerical size
Anthropometric Data Collection code usually do not relate to
for Plus size women (Pear Body the body dimensions of the
Shape) individual as they have been
generalized.
Step 5: Analysis to find out
correlation between the key The inconsistency in sizing
body measurements has resulted in confusion
between manufacturers,
consumers and retailers.
Keywords:
Plus size , Key Body Landmarks , Plus size Indian Brands
Student Name- Akash Mahamana
Student email:
akash.mahamana@nift.ac.in
Students phone no: 9624330869
Student Name- Kandarp Singh
Student email : kandarp.singh@nift.ac.in
Students phone no: 8866063694
Faculty Mentor: Ms Aarti Solanki,
Associate Professor
Industry Mentor: Mr Amber Mani,
Merchandiser/Quality Head,
bewakoof.com
Optimizing the entire quality chain of an apparel e-commerce brand.
Keywords:
QRM,FOB,LEAD TIME, SUPPLY CHAIN
Name : Pranav
email : Pranav.gosh@nift.ac.in
Objective:
To reduce time from
unloading bay to sales bay
To introduce ASN in Keywords: Supply chain , logistics,
warehouse from vendor warehouse cost , customer satisfaction,
To introduce of new bin warehouse management
system
Student Seerat Hora
Email : seerathora9@gmail.com
Phone no: 9662645252
Faculty Mentor: Ms. Vasundhara Choudhary, Associate professor
Industry Mentor: Ms. Neha Gir,
Manager, Sourcing (BB, Kidswear-Girls),
Future Lifestyle Fashions Limited.
Real-time information flow and system integration of ERP, PLM and CMS in MTM
e-commerce portal
Background: Research Methodology: Analysis:
Mass customization is the Data was collected from reports
process of delivering wide- maintained in PLM & ERP.
market goods and services Study of existing system A template report was
that are modified to satisfy prepared.
a specific customer need Master files were prepared for
(custom output). Creyate trims, fabrics & products
offers the same feature in a individually.
brick & click model. Problem Identification All these files were uploaded in
CMS and made live for all the
Objective: users.
To ensure real time
information flow among
different departments Conclusion:
Data collection & analysis
and standardise With the integration done
information storage. successfully, all the information
required during lifetime of a
To reduce manual work fabric or trim is live on web and
and chances of errors. linked with ERP thus, ensuring
Formation of standard stock information being shared
formats with CMS user.
To eliminate redundant
data.
Keywords:
MTM, System Integration, CMS, PLM,
ERP, Material attributes,
Standardisation
Name : Utkarsh Mishra
email : utkarsh.mishra3040@gmail.com
phone no: +91-8004002400
Faculty Mentor: Ms. Nupur Chopra, Assistant Professor
Industry Mentor: Mr. Padmanabh Nayak, D.G.M. Technical,
Velocity Apparelz, Egypt.