Concrete Comp. Strength f'c = 4000 psi
Reinforcing Yield Strength Fy = 60000 psi Fyt = 60000
Modification Factor = 1.00
Design Loads
Ultimate Design Moment Mul = 150 kip-ft
Mum = 75 kip-ft
Mur = 127 kip-ft
Ultimate Design Shear Vul = 90 kips Vur = 90
Ultimate Shear due to Gravity Loads Vgl = 28 kips Vgr = 34
Shear due to Earthquake Loads Vel = 45 kips Ver = 150
Ultimate Design Axial Load Pu+ = 0 kips Pu - = 0
Ultimate Design Torsion Tu = 25 ft-kip
Geometry
Span Location Interior
Clear Span Length from Support L = 23.75 ft
Beam Width b = 20 in
Total Beam Depth h = 24 in
Beam Concrete Cover cc = 1.5 in
Depth to Tension Reinforcing d = 21.5 in
Depth to Compression Reinf. d' = 3 in
Edge Distance to Tie/Stirrup dt = 1.74 in
Reinforcing Bars
- Longitudinal Bars
AT 2- D28 AT 2- D25
AB 2- D28
Flexure
b b=20"
As As=4.19
h h=24"
d d=21"
=2.28
A's
d'=3"
Section at Left Support Section at Left Support
b d'=3" b=20"
A's
=2.28
h d d=21.5"
h=24"
As As=4.19
Section at Midspan Section at Midspan
b b=20"
As As=6.09
h h=24"
d d=21"
=2.28
A's
d'=3"
Section at Right Support Section at Right Support
Reinforcing Criteria
= 0.0100 0.0097 0.0145 As/(b*d)
b= 0.0285 0.0285 0.0285 0.85**f'c/Fy*(87,000/87,000+
(min) = 0.0033 0.0033 0.0033 max(3*f'c/fy, 200/Fy)
As(min) = 1.40 1.43 1.40 in (min)*b*d
(max) = 0.0268 0.0267 0.0268
As(max) = 11.26 11.48 11.26 in (max)*b*d
Shear
Shear forces corresponding to end moments based on steel tensile stress of 1.25Fy and a
strength reduction factor, = 1.0.
The following equation can be used to compute the Probable Flexural Strength, Mpr
Mpr = As(1.25Fy)[d-(a/2)]
where, a = As(1.25Fy)/(0.85f'cb)
Gravity
28 kips 34 kips
Torsion
A Where;
h=24" d=21.5" Acp = 480.00 in b*h
yo= 20.53" Pcp = 88.00 in 2*(b+h)
At Ph = 74.11 in 2*(xo+yo)
Aoh = 339.27 in xo*yo
Ao = 288.38 in 0.85*Aoh
As dt=1.74"
Exterior Right
60000 psi
##
##
##
##
##
##
90 kips ##
34 kips ##
150 kips ##
0 kips ##
Left
1 =
c=
a=
(prov) =
(min) =
b=
(max) =
As(min) =
As(max) =
Mn =
Left
f's yields ?
1 =
c=
a=
(prov) =
(min) =
b=
f'sb =
(max) =
f's =
As(min) =
As(max) =
Mn =
22.2.2.4.3
22.2.2.4.1
/Fy*(87,000/87,000+Fy)
c/fy, 200/Fy) 9.6.1.2
21.2.1 (a)
emarks
22.5.5.1
22.5.6.1 Vc =
22.5.7.1 Vc =
Vc =
22.5.10.5.3
Vs =
22.5.1.2
Vs(max) =
Vu(max) =
9.6.3.3
t)*s, 50*(b/Fyt)*s) Av(min) =
Av(min) =
21.2.1 (b)
9.5.3.1 Vn =
Pu abs =
Pu =
18.6.5.2
c*Ag)/20
(a) =
18.6.5.2 (b)
Ve =
0.5Vu =
###
R.18.6.5
AsTL =
aTL =
MprTL =
AsTR =
aTR =
MprTR =
AsBL =
aBL =
MprBL =
AsBR =
aBR =
MprBR =
Vprright =
Vprleft =
Left
Gravity + Sidesway right
Gravity + Sidesway left
Max. Shear
Vu =
design
Vsp =
22.5.10.1
xo =
in yo =
in Acp =
Pcp =
Ph =
Aoh =
2*(b+h) Ao =
2*(xo+yo) Av(req'd) =
xo*yo At(prov) =
0.85*Aoh Av(prov) =
Tu =
21.2.1 (c)
22.7.4.1
Tth =
Tth =
9.5.4.1
p, Consider torsion!
22.7.5.1
Tcr =
22.7.3.2
22.7.7.1
Tu(max) =
At(req'd) =
22.7.6.1a
A(req'd) =
22.7.6.1b
9.5.4.3
Av+t(reqd) =
9.6.4.2
t)*s, 50*(b/Fyt)*s) Av+t(min) =
Av+t(min) =
Av+t(min) =
At(min) =
9.6.4.3
y) - ((At/s)*Ph*(Fyt/Fy)) A(min) =
A(min)
y) - ((25*b)/Fyt)*Ph*(Fyt/Fy) =
A(min) =
A(govern) =
A(prov) =
Av+t(govern) =
Project: One Taft Residences Prepared By: MTS
Location: 1939Taft Avenue, Malate, Manila Date: 9/16/2016
Client: City and Land Developers Inc. Check By: TCP
Beam Mark: MX1 Level: 4th to 5th WO. Date: 9/16/2016 WO No:
Material Specification
Concrete Comp. Strength f'c = 4000 psi
Reinforcing Yield Strength Fy = 60000 psi Fyt = 60000
Modification Factor = 1.00
Design Loads
Ultimate Design Moment Mul = 150 kip-ft
Mum = 75 kip-ft
Mur = 127 kip-ft
Ultimate Design Shear Vul = 90 kips Vur = 90
Ultimate Shear due to Gravity Loads Vgl = 28 kips Vgr = 34
Shear due to Earthquake Loads Vel = 45 kips Ver = 150
Ultimate Design Axial Load Pu+ = 0 kips Pu - = 0
Ultimate Design Torsion Tu = 25 ft-kip
Geometry
Span Location Interior
Clear Span Length from Support L = 23.75 ft
Beam Width b = 20 in
Total Beam Depth h = 24 in
Beam Concrete Cover cc = 1.5 in
Depth to Tension Reinforcing d = 21.5 in
Depth to Compression Reinf. d' = 3 in
Edge Distance to Tie/Stirrup dt = 1.74 in
Reinforcing Bars
- Longitudinal Bars
AT 2- D28 AT 2- D25
AB 2- D28
Flexure
b b=20"
As As=4.19
h h=24"
d d=21"
=2.28
A's
d'=3"
Section at Left Support Section at Left Support
b d'=3" b=20"
A's
=2.28
h d d=21.5"
h=24"
As As=4.19
Section at Midspan Section at Midspan
b b=20"
As As=6.09
h h=24"
d d=21"
=2.28
A's
d'=3"
Section at Right Support Section at Right Support
Reinforcing Criteria
= 0.0100 0.0097 0.0145 As/(b*d)
b= 0.0285 0.0285 0.0285 0.85**f'c/Fy*(87,000/87,000+
(min) = 0.0033 0.0033 0.0033 max(3*f'c/fy, 200/Fy)
As(min) = 1.40 1.43 1.40 in (min)*b*d
(max) = 0.0268 0.0267 0.0268
As(max) = 11.26 11.48 11.26 in (max)*b*d
Shear
Shear forces corresponding to end moments based on steel tensile stress of 1.25Fy and a
strength reduction factor, = 1.0.
The following equation can be used to compute the Probable Flexural Strength, Mpr
Mpr = As(1.25Fy)[d-(a/2)]
where, a = As(1.25Fy)/(0.85f'cb)
Gravity
28 kips 34 kips
Torsion
A Where;
h=24" d=21.5" Acp = 480.00 in b*h
yo= 20.53" Pcp = 88.00 in 2*(b+h)
At Ph = 74.11 in 2*(xo+yo)
Aoh = 339.27 in xo*yo
Ao = 288.38 in 0.85*Aoh
As dt=1.74"
Exterior Right
60000 psi
##
##
##
##
##
##
90 kips ##
34 kips ##
150 kips ##
0 kips ##
Left
1 =
c=
a=
(prov) =
(min) =
b=
(max) =
As(min) =
As(max) =
Mn =
Left
f's yields ?
1 =
c=
a=
(prov) =
(min) =
b=
f'sb =
(max) =
f's =
As(min) =
As(max) =
Mn =
22.2.2.4.3
22.2.2.4.1
/Fy*(87,000/87,000+Fy)
c/fy, 200/Fy) 9.6.1.2
21.2.1 (a)
emarks
22.5.5.1
22.5.6.1 Vc =
22.5.7.1 Vc =
Vc =
22.5.10.5.3
Vs =
22.5.1.2
Vs(max) =
Vu(max) =
9.6.3.3
t)*s, 50*(b/Fyt)*s) Av(min) =
Av(min) =
21.2.1 (b)
9.5.3.1 Vn =
Pu abs =
Pu =
18.6.5.2
c*Ag)/20
(a) =
18.6.5.2 (b)
Ve =
0.5Vu =
###
R.18.6.5
AsTL =
aTL =
MprTL =
AsTR =
aTR =
MprTR =
AsBL =
aBL =
MprBL =
AsBR =
aBR =
MprBR =
Vprright =
Vprleft =
Left
Gravity + Sidesway right
Gravity + Sidesway left
Max. Shear
Vu =
design
Vsp =
22.5.10.1
xo =
in yo =
in Acp =
Pcp =
Ph =
Aoh =
2*(b+h) Ao =
2*(xo+yo) Av(req'd) =
xo*yo At(prov) =
0.85*Aoh Av(prov) =
Tu =
21.2.1 (c)
22.7.4.1
Tth =
Tth =
9.5.4.1
p, Consider torsion!
22.7.5.1
Tcr =
22.7.3.2
22.7.7.1
Tu(max) =
At(req'd) =
22.7.6.1a
A(req'd) =
22.7.6.1b
9.5.4.3
Av+t(reqd) =
9.6.4.2
t)*s, 50*(b/Fyt)*s) Av+t(min) =
Av+t(min) =
Av+t(min) =
At(min) =
9.6.4.3
y) - ((At/s)*Ph*(Fyt/Fy)) A(min) =
A(min)
y) - ((25*b)/Fyt)*Ph*(Fyt/Fy) =
A(min) =
A(govern) =
A(prov) =
Av+t(govern) =