1. Kriteria Perencanaan
• Peraturan yang digunakan: Peraturan Pembebanan Indonesi untuk Gedung 1983.
Beban angin diasumsikan 25 kg/m2
• Tegangan ijin tanah = 0,5 kg/cm2
• Mutu bahan : Beton K225, Besi Tulangan U24
2. Stabilitas Pondasi
2
3
3. Perencanaan Struktur Beton Bertulang Pondasi
SPREAD FOUNDATION
1. Loading Data
P Loading : a. Permanent Load b. Temporary Load
Mx P = Axial Load
( w/o foundation weight )
Vx = 10,72 ton P = 10,72 ton
Vx = Shear ( x - direction )
= 0,30 ton Vx = 0,30 ton
Vz = Shear ( z - direction )
= 0,00 ton Vz = 0,00 ton
Df H Mx = Moment ( x - direction )
= 6,57 ton. m Mx = 6,57 ton.m
Mz = Moment ( z - direction )
= 0,00 ton.m Mz = 0,00 ton.m
Note : Leter inside bracket means Forces which have direction perpendicular
B (L) to this plane.
2. Assumed Dimension
b
h
Foundation Size Data :
H= 130 cm
Df = 120 cm
B= 275 cm
L= 150 cm
hf = 30 cm
d= 22,5 cm
H Df b= 40 cm
h= 40 cm
d hf
c1
z c2
4
3. Check of Soil Reaction "fe"
Design Loads :
a) Vertical Loads (P)
Permanent : Temporary :
Mx1 = Vx . H Mx1 = Vx . H
= 389,48 kg m = 389,48 kg m
Mz1 = Vz . H Mz1 = Vz . H
ex (ez)
= 0 kg m = 0 kg m
α = 1 + factor x + factor z
4. Check of Stability
Permanent : Temporary :
Overturning Moment ( OM ) : Mx tot = 6962,38 kg m Mx tot = 6962 kg m
Mz tot = 0 kg m Mz tot = 0
9 kg m
Resistant Moment ( RM ) : Ptot.B/2 = 28186 kg m Ptot . B/2 = 28186 kg m
Ptot.L/2 = 15374 kg m Ptot . L/2 = 15374 kg m
Permanent Load : RM / OM = Ptot . B = 4,0 > 2,0
2 . Mx tot
Temporary Load : RM / OM = Ptot . B = 4,0 > 1,5
2 . Mx tot
5
5. Footing Design
5.1 Design Soil Reaction "qus"
fe max = 0,865 kg/cm 2
qus = 1.6 * ( fe max - Wf ) = 1,005 kg/cm 2 ; Note : 1.6 is used an average load factor,
B.L because the proportion of dead and
live load are not known.
5.2 Required Re-bar due to Bending Moment
a. Design Moment :
Mux = qus . L . ( B - b )2 /8 = 10407,3 kg m
Muz = qus . B . ( L - h )2 /8 = 4180,5 kg m
b. Steel Ratio, ρ :
fy = 2400 kg/cm 2
fc' = 122,5 kg/cm 2
m= fy = 23,0 ; Ø = 0,9
0.85 fc'
- About x - dirrection :
2
Rn = Mux = 15,2 kg/ cm
2
ø L d
- About z - dirrection :
2
Rn = Muz = 3,3 kg/ cm
ø B d2
ρ req = 1 1 - 1 - 2 m Rn = 0,0014 < ρ min
m fy
take : D 13 @ 150
6
5.3 Check of Shear Stress
2
Vux = qus * ( B/2 - c1) / d = 4,24 kg/cm <
2
ø (0.53 vfc') = 4,986 kg/cm
2
Vuz = qus * ( L/2 - c2) / d = 1,45 kg/cm <
Ok !!
5.4 Check of Punching Shear
2 2
Vup = qus * ( B*L - b1*b2) = 6,67 kg/cm < ø (1.06 vfc') = 9,972 kg/cm
2 * ( b1 + b2 ) * d
Ok !!
6. Sketch :
D 13 @ 150 D 13 @ 150
7. Pedestal :
Check requirement :
Ratio = Pedestal Length 100
= = 2,50 < 2.5 Short Column
Width of pedestal 40
Rebar requirement :
2
ρo= 0,01 As = ρ o Ag = 16,00 cm
2
Used 16D-13 As = 21,24 cm Ok!