100 Most Important SAP PP Interview Questions
6. Explain PI sheet.
11. What is MRP Area or How can I excluede one storage location stock from MRP?
13. When you run MRP, What steps it Perform in Back ground or How do you schedule BG job
for MRP
18. Difference between Manual reorder point and Automatic reorder point.
20. In the monthly lot size proc, how to generate lot at the end of Period?
21. Different types of scrap or difference between types of scraps.
28. What is the SPRO Path for requirement class and req. type?
30. What is Individual and collective requirements and differecne between them in MTO
scenario?
34. Explain Flexible Planning procedure or How many levels of Flexible planning.
35. What is Material status and which view of the material master it is available?
46. What is alternative BOM, or diff between BOM group and Group BOM?
47. Difference between Routing, Ref op set, Rate routing and Ref rate routing.
49. What are the parameters are there in Order type or in dependent para. config?
50. Once the Production order is created, how to change the BOM and routing in that order?
57. How can you create production order without routing and BoM?
60. What is trigger Point. What are the setting required to trigger one action?
61. What are the levels of batch, explain batch determination process?
73. What do you do to run MRP for just one MRP Controller?
75. What is the transaction code to run MRP for sales order?
76. What is the transaction code to execute forecast, and explain types of forecast model?
93. Difference between plan cost, Actual cost and target cost.