You are on page 1of 3

Company Name: M/s Sri Venkatachalapathy Electricals

Infrastructure Requirement

S.No Description Qty Operation

1 Power/Hydraulic Press 1 Cutting


2 Hydraulic Press 1 Punching
3 Hyd Notching M/c 1 Notching
4 Plate Shearing M/c 1 Plate Shearing
5 Hyd Iron Maker 1 Multi (Punching ,Cutting, Notching)
6 Number Stamping Press 1
7 Welding M/C 1
8 Radial Drilling M/c 1
9 Magnetic Drilling M/C 1
10 Grinding M/c (AG-7) 2
11 Bending Die 1 Heat Bending
12 Cutting Tool 2
13 Punching Tool 2
14 Gas Cutter 1
15 Shed with all civil works 80 x40 Feet
16 EOT Crane 1 4 Ton
17 Mobile Crane 12 Ton Handling
18 Power 60 HP

Total
apathy Electricals
ment

Cost (in
Make Capacity(MT)
Lakhs)Approx
8 100
10 100
8 75
12 100
Sun Rise 8.5 100
3.5 75
0.3 400 Amp
4.5 25- 30 Mm
0.3 Dia 25 Mm
0.3 7 ''
0.07
0.4
0.12
0.45
30
8
3
2

99.44
ED VAT Transportation RM Cost
Raw Material 37000 3862 1738 500 36500
Fabrication 2500
OH 1000
Galvanisation 13000
Total 53500 5661 2548 53500
O/P ED 1799
O/P VAT 810
Final Cost 56108
2500
1300

You might also like