You are on page 1of 1

1 2 3 4 5 6 7 8 9 10

KEY PLAN
PN TN

A A

2213

1913

1613
00
8 7
30

1313
24
3

4WW- 20102-BB1

350 20WW- 20101-BB1

15

30
15
300

15
C
B 152
00
B

100
3

100
700
210 10
0

515
670

315
760
210
8"

6"
15

15

8"
6"

200
3" 2"

2"
3"

30
30

140
230

230
210

188 188

90
305

720
15
210 437 6 SET OPENINGS 350
350
0

SG SG 6PA-20202-BB1

315

45
315

45
8 85 100 85 8
M1 M1
24" N4 24"
1"

131.8
90 270 90

N1 N1
8" 1" 8"
N4

135

135
225

225
180 180

2115

C
0 0

SG

315

45

45
315

M1 M1
24" N4 24"
1"

NP

90 N2 270 90
8"

210 N1
8" 1"
N4
N1
8"
0
N4
6"

45

315
135
225 135

225
N1
6"

180 180 M1
20"
270 90

N5
1"

135
225
N3

0 3"

180

SG SG

315

45

45
315

M1 M1
24" N4 24"
1"

0
N4
90 270 90 6"
45

315
N1 N1
8" 1" 8"
N4 N1
6"

U-BOLT 8"
M1
20"
270 90

135
225 135

225
N5
1"

180

225

135
N3
3"

180

100 100
0 0

DETAIL LIFTING LUG


SG SG

315
SS 304

45
315

45
0
N4
6"
M1 M1 45
24" N4 24" 315
1"

N1
6"

270 90 270 90 M1
20"
90

N1 N1
8" 1" 8" N5
N4 1"

225
135

135
N3

225 135 3"

180

225
180 180

0
N4
6"
0 0

308
45

315
SG SG

315

315
45

45
210
N1
6"

M1
20"
M1 M1 270 90
24" N4 24"
1"
N5
NP 1"

270 90 N2 270

135
8"

225
N3
3"
N1 N1 180
8" 1" 8"
N4

135

135
225 LIFTING LUG

225
180 180
0
N4
6"
45

315
N1
6"

M1

324
0 270 90
20"

SG SG

45

45
N5
315 1"

225

135
M1 N3
24" 3"

180
NP

270 90 N2 270
8"

N1 N1
1" 8"
N4

135

225

225
180 180

ANGLE L 75x75x5 X
Y

A36 FRP COATED


210
OPENING EXHAUST
131.6 DETAIL 1
210

SUPPORT DEGAS INLET


241
DETAIL 4
BILL OF MATERIAL
D 42

NO. DESCRIPTION MATERIAL SPEC D

1 PIPE 8" PVC


2 PIPE 3" PVC
922 1107
152 210 210 210 210 210 210 210 210 241 42
772

622 807
957
3 CAP 8" PVC
22
472 657

110 110 110 110 110 110 110 110 110


4 CAP 3" PVC
100 100 100 100 100 100 100 100 100

110 80 90 100 345 299 209 219

158 150 150 150 150 150 49 25 25 25 25 25 25 35


80

25
90
80

25
90
80

25
90
80

25
90
80

25
90
80

25
90
80

25
90
80

25
90
80

25
90

5 ANGLE L 75 x 75 x 5 A36 FRP COATED


33 33 33 33 33 33 33 33 33 33 33 33 33 33 33
219 110
5

300
22
992 1123 6 U-BOLT 8" SS 304
2115
428 310
352
8x
22
16x 11
M10
332 300 10 7 OPENING EXHAUST FRP, ISOPHTALIC, & GROVING

510
,23
20
2,74

LATERAL DISTRIBUTION 8 LIFTING LUG A36 FRP COATED

96
345

10
E E

101
9 PLATE LIFTING LUG PVC

101
10 PIPE 3"

500

520
PVC

520
596

596
101
DETAIL 2 11 MALE SOCKET A36 FRP COATED

101
345
298,5

202,74

12 FEMALE SOCKET SS 304

17

96
22,23

70
10
5

113 113
101 101 13 PLATE 3" FRP, ISOPHTALIC, & GROVING

DETAIL NOZZLE N1 DETAIL DUCTING N1, N2 13 NOZZLE FRP, ISOPHTALIC, & GROVING
NOTE :
ALL DIMENSION DRAWING ARE IN MILIMETER UNLESS OTHERWISE SPECIFIED

F F

176
108
Top PVC Plate 3 mm
48 5 FOR APPROVAL OJA DKY DDY RMT 10/02/17

3
.3
75 Opening 48x70mm (4 UNITS)
1

70
HOLES 20mm FOR WATER 5 FOR APPROVAL ATP DKY DDY RMT 11/01/17

123
Pipe 3"

215
90
Sock Female 3"

42 42
PIPE 1" FOR WATER 7 4 FOR APPROVAL ATP DKY DDY RMT 22/12/16
2300 4 .8
82
3 FOR APPROVAL ATP DKY DDY RMT 24/10/16

25
TOP VIEW
88

250 250 250 250 250 250 250 250


108 2 FOR APPROVAL ATP DKY DDY RMT 30/08/16
114
1 FOR APPROVAL ATP DKY DDY RMT 02/06/16
297420

176

PIPE 3" FOR AIR 0 FOR APPROVAL ATP DKY DDY RMT 25/05/16
90
215 REV DESCRIPTION DESIGN CHEKD APPRD AUTHD DATE
290
82
Sock Male 3"
A3

250

46 54
100
Bed

55
75

90
PROJECT NAME :
250

108 G
AMMONIA - UREA II PROJECT
250

2000 MTPD AMMONIA AND 1725 MTPD UREA


DETAIL AIR DISTRIBUTOR
250

GRESIK, EAST JAVA, INDONESIA


250

10
250

175
CLIENT NAME :
250

20x20 1
2

PETROKIMIA
250

200

200
2300

250

GRESIK

815
250

H
250

340
250

CONTRACTOR :
250

70
250
270
250

290
340 PT. ADHI KARYA (Persero) Tbk
250

BEYOND CONSTRUCTION
250

340
250

0
M16
7 VENDOR :

75
I

29

BUANAHDIIPT.PAANAUAJUB
HIJAU
PADI
PT.
304
PT. PADI HIJAU BUANA
PT
. PA D A NA
I H I JA U BU

WITHOUT
REPRODUCED
BE
SHALL
DOCUMENT
THIS
OF
PART
BUANANO
HIJAU
PADI
PT.
OF
PROPERTY
THE
AND
ARECONFIDENTIAL
IN,
THERE
CONTAINED
INFORMATION
AND
DOCUMENT
RESERVEDTHIS
RIGHTS
OWNER:DATEDESCRIPTIONAPPROVEDCHECKEDDRAWNALL
NO.SHEETS:1234567891011121314151612345678910111213141516ACDEFGHIJKACDEFGHIJK00NTS01
NO.DRAWING
NO.PROJECT
BY:SCALE:DATE:APPROVED:REVISION
BY:CHECKED
TITLE:DRAWN
:DRAWING
NOTES:PROJECT:Contractor
:GENERAL
Contractor
PROJECTMain
II
UREA
GRESIKAMMONIA
PETROKIMIA
TbkPT.
(Persero)
KARYA
ADHI
BalancePT.
DemineralizationWater
and
Water
)Filtered
6
x
10
BUANABB(
HIJAU
PADI
PT.
OF
PERMISSION
WRITTEN
PERIOR
THE
250 250 250 250 250 250 250 250 250

610

33
MANUFACTURE :
290

170

250 250 250 250

2284
250 250 250 250 DETAIL MAINHOLE M1, M2, M3 PT. GOLDEN MULTI INDAH GLASSTECH

2300

DRAWING NAME :

DETAIL 3
J
SIGNATURE

SCALE : DRAWING NO : REV.


SPECI

DOCUMENT NO : SHEET. OF

1 2 3 4 5 6 7 8 9 10

You might also like