MECH-498

5 sub-team activities: electrical team


Jacob Stinson

1) Finalize specs, such as the number of telemetry lines we have, the video camera
resolution we need for successful stereovision, etc.
2) Finish prototyping of handling timer events
3) Finishing prototyping of motor control
4) Finish prototyping of data collection. This includes:
a. Prototyping possible wifi communication to avoid data lines through slip ring
b. Master-Slave setup between main MCU and secondary MCU
c. Hardware design of FPGA for data processing
5) Finalize sensor suites through testing accel/gyros and stereovision with boom/solar
panel
6) Integrate some fail-safes to mitage the risk of our system failing if the main MCU fails