201O 2nd International Conference on Industrial and Information Systems

System Design of Electric Locomotives Operational Safety Monitoring Network


Based on PROFIBUS-DP

2 l
Yang Chenghui 1 WuXiaojun Du Lina
College of Electrical Engineering Gansu Baiyin Tobacco Company College of Electrical Engineering
Northwest University for China National Tobacco Corporation Northwest Univerisity for
Nationalities Baiyin, China730900 Nationalities
Lanzhou, China 730030 yghcklrjxdgy@163.com Lan zhou, 730030,China
yangchenghui36@163.com dulina 003@126.com
_

Ab stract---considering the actual situation and the use system latency effectively, and lay a good foundation for the
requirements of electric locomotive operation readiness in our promotion of railway system. This time we changed the
country, we designed a security network control system based traditional manual operation mode, and we are sure that the
on PROFIBUS-DP. The systems implement the system will have good practical value and promotion
communications between a master class and third-party prospects.
equipment, as well as the interactive operation from PLC and
non-contact IC card to SCM System. We described the Multi­ II. ELECTRIC LCOMOTIVE READINESS OPERATION
task scheduling mechanism and the security of data
communications of Monitoring Network System details. At last, A. RequestAnalysis and worliflow of electric locomotive
we did a perfect laboratory debug to this network control readiness operation.
system, and we got satisfactory results, laid a good foundation
for the promotion and application in railway system.
Control requirements and work flow is the basis of
monitoring network system design, it is also a main reference
Keywords-electric locomotive; PROFIBUS-DP; monitoring when we select the system program, so the analysis and
network; multi-task scheduling mechanism; data security improvement of control requirements and work flow is
particularly important.
The control requirements are as followed:
I. INTRODUCTION
Firstly, before the operations, make sure the isolation
In recent years, electrified railway in China has achieved switch has been divided into gate state, and ground rod
remarkable development and progress, in high-speed and should be grounded immediately after the isolation switch is
overloading fields. But the core technology, design disconnected.
standardization, as well as project management is far from Secondly, to switch on isolation switch, we must ensure
the intemational advanced level, especially the low level of that no maintenance staff is on the roof, grounding rod and
equipment, backward of detection and maintenance methods the earth has been disconnected.
[1]. The workflow of the system is as followed:
So far, the domestic electric locomotives (including Firstly, we should check whether the parking position is
EMU) and reorganization of operating control system has suitable, if it does, we should input the locomotive number,
made a lot of results [2, 3], and all of them used centralized and apply for maintenance. Otherwise, we should continue
digital control system or DCS (Distributed Control System, check the parking position.
DCS)[4], which are traditional. They can centrally manage, Then, the worker will see whether the sub-gate
decentralized control, but these systems are not interoperable conditions are fit, and decide to input the sub-gate command
distributed control system. The closing communication or not. Received the command, maintenance personnel will
networks expensive price, making it difficult to promote climb to the top, and do the repair work. When the work is
these results. finished, the man on duty will check again, if he/she is sure
In order to change the backward situation of detection that the equipment is normal and the maintained personnel
and maintenance methods, and lower the system cost, we has got off, he will hop the switch. Then locomotive be
designed and developed security network control system pulled away, and the stocks road system standby
based on field bus technology electric locomotive readiness
operation, which is open, decentralized and can do digital B. Security of monitoring network model
communication. We used graph theory and constructed a Security of monitoring network system using the
comprehensive analysis of token ring, which will reduce the PROFIBUS-DP, S7-300PLC as its master, and S7-200PLC

978-1-4244-8217-7110/$26.00 ©2010 IEEE IIS 2010


192

Authorized licensed use limited to: Bibliothèque ÉTS. Downloaded on September 27,2023 at 22:56:36 UTC from IEEE Xplore. Restrictions apply.
through the EM277 module as its slave, then a class from the box can open automatically, maintenance staff can get the
station can communicate with a third party equipment. The key and do repair work on the roof.
network model is consisted of monitoring layer, control layer While the other difficulty is, after the locomotive
and perform layer. In the monitoring layer, there are maintenance, only when we ensure that no one on the roof
interface of Industrial Ethernet and IPC, they formed the and ground rod has been disconnected with the earth, then
monitoring system. The control layer is the core of the isolation switch can be closed. To solve this difficulty, we
system, the use of PROFIBUS-DP, let the operator realize use the roof industrial cameras to obtain roof images, then
the centralized management and decentralized control to we can send it to the monitoring machine via Industrial
each slave station. While the perform layer receive command Ethernet, so the people on watch can understand the roof
from the control layer, implement the functions of each situation at any time. The system detects if there people on
module. the roof any more, and then output the closing command.

III. HARDWARE SYSTEM.SECURITY OF MONITORING IV. SOFTWARE DESIGN OF SAFETY MONITORING


NETWORK NETWORK SYSTEM

A. Composition of safety monitoring network hardware A. Structure design of software


By using the pure master - slave network security Software structure design of safety monitoring network
monitoring systems, monitoring network can realizes data system includes: Master /slave network configuration
exchange between various module and the host computer. module, non-contact type IC card operation management
All the communications include the communication between module, data exchange module between Slave PLC and the
Master PLC and PC configuration software, Slave PLC and SCM system, control module to the implementation motor.
non-contact IC card, Slave PLC and SCM. The The function of master / slave network configuration module
communication between Master PLC (S7-315-2DP) and PC is to realize the data change between master PLC and slave
configuration software is only used when KingView6.51 PLC. While the non-contact type IC card operation
definite the equipment, select PLC / Siemens / S7-300 series management module includes the authentication of
(Profi-Bus) DP, and then defined variable as the PLC I / 0 maintenance staff, operating records, and the close or open
variables in the KingView6.51 data dictionary. By the of isolation switch. And the input of locomotive number. ,
communication between Slave PLC and the IC card, LCD display and the voice prompts in the operator steps is
monitoring system can obtain the job Information of the realized by the data exchange module between Slave PLC
operator automatically. The communication between the and the SCM system. Through the last module, PLC control
PLC and SCM can realize the input of a locomotive No. and "interlock, linkage" of the isolation switch and ground rod.
voice prompts.
B. Design of communication protocol [6]
We selected the S7-315-2DP [4, 5] as the master, S7-226
as the slave. The two RS485 communication port of S7-266 After the configuration of master/slave network, the
are connected to non-contact IC card reader and address assignment and data formats is assigned. It is shown
microcontroller systems. The VO ports of CPU226 are in Table I.
connected to the implementation motor. Our system uses the
OLM (Optical Link Module) modules and the composition
TABLE I MASTER / SLAVE CONFIGURAnON ADDRESS ASSIGNMENT
of the glass fiber with a redundant ring, which enhanced the
AND DATA FORMATS
reliability of the network. We selected OLM/Gl2 type OLM
module, whose transmission distance is 3000m.. Hardware
Address and Station
configuration and module functions are as follows: formats
Motorcycle parking position detection module uses two Mas/erPLC SlavePLC J SlavePLC 2

general-purpose limit switch, 1.5m apart in orbit, the Configuration


2 10 11
direction of the installation, when the parking spaces Address
appropriate, the speech output "please stop"; The using of Data Format 30 B/Frame 30 B/Frame 30 B/Frame
80C320 microcontroller and LCD display, can realize the
input locomotive number and operation tips. Got the roof By the communication between Slave PLC and the IC
image by industrial camera, and show it on the control card, the operator can get information on the operation
interface, and it can help to check whether to open or close automatically; its data exchange format is shown in Table 2.
the switch.
TABLE II DATA FORMATS BETWEEN SLAVE PLC WITH ICCARD
B. Analysis of difficulties and implementation
ICCard
The first difficulty is that, before we can ensure the Road No. Name Gender Position Swipe Time
No.
isolation switch has been sub-gated and the ground rod
1 byte 10 byte 8 byte 1 byte 4 byte 4 byte
grounded maintenance personnel's can not reach the top and
do their job. Considering this, we designed a special kind
multi-use key which can open many locks, the key is placed
in the key box on the ground, if the equipment is ok, the key

193

Authorized licensed use limited to: Bibliothèque ÉTS. Downloaded on September 27,2023 at 22:56:36 UTC from IEEE Xplore. Restrictions apply.
The communication between the PLC and SCM, realized destroy, even may cause the death of the staff. Both the
the input of locomotive number and voice prompts, and its PROFIBUS and PROFINET have used the Profligate
data exchange formats such as shown in Table 3. security technology. At present, the security level can get to
be SIL3 by using Prophesied, and may exceed this level
Security monitoring network is a pure master - slave DP
network system, the use of with Profi-Bus technology drives
TABLE IlL DATA FORMAT BETWEEN SLAVE PLC WITH SCM can be realized Profi-Bus-based security technology [11].
SYSTEM
This system uses secure input / output module to drive the
Road No. L ocomotive No. Voice prompts implementation motor, in order to ensure the security of data
transmission. Without changing the software, equipment
1 byte 10 byte Pe nding
operate in the VI-paragraph, and the level of security can get
to be SIL2.
C. Design of multi-task scheduling mechanism
E. Testing of system software
Field bus control system; break through the limit of DCS
system which use communications networks, and overcome Software system testing is essential for the normal
the deficiencies caused by a closed system. On the other operation of the software. In order to achieve the on-site
hand, it has the new full-distributed architecture [7]. installation and testing of monitoring network system, we
The system adopts the multi-tasking data processing have developed a communication simulation program
system, so the safety monitoring network system can meet testing procedures. By accepting the instructions from Host
more complex real-time data processing requirements. Multi­ computer, the module receives operating command from
task real-time data processing module includes: locomotive control procedures. After the operator input directive,
location, roof image data acquisition, data processing, data laboratory simulation system will respond to operation. If
storage, control output, take single-stranded channel data the state of communication is off-line, the operator can also
processing for example, the scheduling foundation is shown input commands manually. No matter the hardware and
in Figure 1. software testing, or laboratory tests, the results were normal
and the stability of the system is very good.

� Monitor the host Return



V. MONITORING SOFTWARE DESIGN
[fl
ct
.... Software architecture designed to reduce software
Control the SCM
--l '"C Return engineering design and realization of the complexity of the
I» r
[fl
'" n software can increase the reliability of the system.
[fl
5' 0 Detection of Return Preparation of the entire electric locomotive safety
:T
;:;: (1)
0.. monitoring network operating system software architecture
E t: Collect data Return
N' � design include: master / slave network configuration
� ....
"0 modules, non-contact ID card operations management
o· ....
:::l 0
Store the data Return
(JQ
module, and from the station PLC SCM system data
....
I» exchange module, the implementation of Station PLC motor
3 Deal with the error Return
control module, and several main modules design.

A. Platform--KingView
Figure I. Multi-task scheduling functions Host monitoring software used King view 6.52 [10, 11]
developments, running on windows XP platform. In the
configuration software options, analyzed and compared by
By the master PLC of the interrupt mechanism, we
realized multi-task scheduling. The PLC timer is used as using a Beijing-controlled automation software technology

clock management, and the timer will generate time blocks, company Kingview Configuration software. It is simple and
then the system allocate them to different task. According to flexible operation of the visual interface, real-time, a good
interrupt source of PLC, we can decide the task priority. parallel processing capability, rich multimedia vivid screen,
When the switch is on, the scheduling form will be a sound security mechanism, alarm functions, and more
initialized according to the default. Besides, we can also diversification benefits.
modify the scheduling form by monitoring the system After the adoption of a reasonable configuration,
information, and then realize real-time data processing of the automatic control mode in the mainframe computer in the
entire system. visual display is convenient to observe the entire process of
locomotive maintenance, real-time monitoring and control.
D. Security of monitoring network data [8, 9]
So in the process of introducing industrial control
As a master - slave network system, the security
configuration software is essential, it makes more intuitive
monitoring network is based on PROFIBUS-DP, the
control, and more secure. In the realization of the following
requirements to both real-time and data security is high.
methods to focus on four aspects: Graphics, interface
Isolating switch malfunction may lead the equipment to

194

Authorized licensed use limited to: Bibliothèque ÉTS. Downloaded on September 27,2023 at 22:56:36 UTC from IEEE Xplore. Restrictions apply.
settings, rendering various graphical symbols; Achieve configuration, came up with relevant network
graphics and control interface between the physical state of communication protocol, and conducted a more detailed
the corresponding settings; Dynamically generated database, analysis on real-time data processing and security [12, 13].
historical records, statements, etc.; Realization of real-time Finally, we do a relatively complete functional testing on the
monitoring capabilities. entire software system, and obtained the good results.

B. System configuration REFERENCES

Safety monitoring network systems in order to achieve [ I) People Railway. September 16, 2006 2nd edition, Author: Jinsheng­
Mi, Wang Jian.
the various modules and PC data exchange between related
[2) Yan-min Huang. The Oesigen of the Servicing Work Safety
to the communication are: Main Station PLC and PC
Supervision System for Electric Locomotive and EUM. Southwest
configuration software communications from the station Jiaotong University, 2003.
PLC and non-contact between the IC card communication (3) Ming-sheng Ma. Electric locomotive (EMUs) and reorganization of
from the station PLC and the communication between the the operational safety of joint control of computer systems research
microcontrollers. Main Station PLC (S7-315-2DP) and PC practice (0). Central South University, 2005.

configuration software communications only in the (4) Zhi-hao Lin. Fieldbus and Industrial Ethernet Beijing Mechanical
Industry Press, 2006.
Kingview6.52-definition equipment selection PLC /
(5) Chang-chu Liao.S7-300/400PLC Fieldbus and Industrial Ethernet
Siemens / S7-300 Series Profibus-DP, and then
Beijing: Mechanical Industry Press, 2006.
Kingview6.52 in the data dictionary PLC defined as
(6) Cui Jian. Siemens Industrial Network Communications Guide.
variables and the corresponding I / 0 variables. Beijing: Mechanical Industry Press, 2006.
PLC communication with the main station, the main (7) Hui-xian Yang. Fieldbus technology and its applications. Beijing:
station selection S7-300 PLC, SIMATIC S7-300 Series Tsinghua University Press, 1999.
PLC agreement MPI support agreement with Siemens S7- (8) Jianjun Meng, Chenghui Yang, Wenzhe Qi, Servicing Work Safety
Supervision System for Electric Locomotive Based on Configuration
300 Series PLC communications in Monitoring Software.
Software, Proceedings of the 2008 International Symposium on
Need your computer to install or use MPI PC-Card Electronic Commerce and Security, pp 467-470.
Adapter. (9) Herbert Barthel & Dr. W olfgang Stripf. The latest progress of
Profisafe. Instrument Standardization and Metrology, 2005 (6) :4-6.
VI. CONCLUSION
(10) Control of Beijing Science and Technology Development, Co., Ltd.,
Considering the actual situation and the use requirements Beijing: Kingview 6.5 Manua1.2003.
of electric locomotive, we designed the safety monitoring [ I I) Control of Beijing Science and Technology Development,
Co., Ltd.,
Beijing: Kingview 6.5 manual command language function Fast
network system. The technical problems of traditional
Facts.2003.
manual operation, such as low work efficiency, security risks
(12) Chenghui Yang Chuanjun Ren. Communication Application onthe
and so on, have all been solved. By using the PROFIBUS­
Servicing Work Safety Supervision System for Electric
DP bus technology, we realized self-locking and linkage Locomotive. ,Proceedings ofKAM2008,2008,pp: 371-373.
control to Electric Locomotive Operation Readiness, and put (13) Yang Chenghui, Meng Jianjun, Qi Wenzhe. Electric Locomotive
forward a new operational procedure, which is different from Servicing Work Safety Supervision System. Proceedings of
manual operation. The duties of custody are transferred to IFITA2009, pp:709-711.
the attendant, so we can reduce the positions of staff on-site.
We discussed about the hardware selection and slave

195