Validating Operational Effectiveness for Existing Data Centers


The Management & Operations (M&O) Stamp of Approval encompasses a set of benchmarks and best
practices that have been proven to support effective data center operations and reduce human errorthe
leading cause of data center outages. Regardless of the underlying design and infrastructure of a facility,
well-informed management practices, systematic and documented policies and procedures, and effective
training regimens, when applied and followed consistently, can insulate a data center from the majority of
downtime risk.

Management & Operations The M&O Stamp of Approval path begins with an
Assessment and Award on-site evaluation of the current practices in place
Attaining the M&O Stamp of Approval assures at a data center. Uptime Institute experts review
stakeholders and the market that your data center documentation and policies, interview personnel, and
satisfies industry-recognized criteria for excellence, directly observe operations activities. The assessment
risk management, and reliability. It is a stand-alone process is a thorough, multi-day analysis to determine
assessment of critical facilities management and if appropriate management and operations behaviors
operations practices of a non-Tier Certified data exist and if they are executed effectively. It provides
center, encompassing both day-to-day activities on accountability for the operations team, service
the ground and upstream planning and decision- vendors, and leadership. The M&O Stamp of Approval
making. Earning this credential demonstrates your is being leveraged by organizations with a globally
organizations leadership and commitment to distributed footprint to drive standardization and
operational excellence. sustain operational excellence.

Key Areas Assessed

The M&O behaviors are divided into five categories, with criteria in each that
have been identified as necessary for a site to achieve its full uptime potential,
reduce its risk of errors, and maintain efficient operations.

Planning, Coordination, and Management


Site Policies Financial Process Reference Library Capacity Management

E IN
STITUTE APP
RO
Staffing and Organization
TIM V
Staffing Qualifications Organization
UP

ED

M&O Company
Training
Data Center Staff Vendors
Site
Exp. Day Month Year Operating Conditions
Load Management Operating Set Points

Maintenance
PM Program Housekeeping MMS Vendor Support Deferred Maintenance
Predictive Maintenance Life-Cycle Planning Failure Analysis Program
Uptime Institutes M&O principles are built upon For enterprise owners, it gives you and your
the fundamental conviction that operations and stakeholders the assurance needed that effective
management issues are addressable, often without a operating practices and risk management
major resource commitment, and represent the single measures are in place
greatest opportunity to reduce the risk of data center
For colocation and managed service providers,
incidents and downtime.
it enhances the industry reputation of your data
Sites that meet criteria in all five categories are center by acknowledging accomplishment as
awarded the M&O Stamp of Approval. Youll also witnessed through an independent and unbiased
receive a report of findings and recommendations on third-party.
how the organization can align resource allocation
with facilities performance to minimize human error
If you have your processes and content down,
and extract maximum value from your installed
getting M&O is the gold standard. Everything else
infrastructure.
becomes easy. Compare that to owning an SSAE
M&O Stamp of Approval awards are valid for two certyou might not be anywhere near qualified
years. Operational excellence is in large part about to pass M&O.
maintaining discipline and consistency over time
John Sheputis,
and making continual adaptation to changes in the
President, Infomart Data Centers
environment. Accordingly, Uptime Institute requires
reassessment every two years.

Reduce downtime risk and validate the operational

We sought a level of achievement to differentiate excellence of your data center. Contact the experts

beyond what was expected or commonplace. in management and operations at Uptime Institute

Uptime Institutes M&O Stamp of Approval today and let The Global Data Center Authority help

requires a level of rigor and aptitude specific to you keep your operations on track.

data centers that digs into, and recognizes, our


operational achievements. Questions?
Please contact your regional representative online:
David Meredith
http://uptimeinstitute.com/contact-us,
Senior Vice President, CenturyLink
email us at: info@uptimeinstitute.com,
or by phone at: +1 206.706.4149

Benefits of the M&O Stamp of Approval For more information about the Management &
Earning the M&O Stamp of Approval validates the rigor Operations assessment criteria and a list of recipients
and effectiveness of your data center management of the M&O Stamp of Approval, visit the Uptime
and operations. It helps: Institute website: https://uptimeinstitute.com/
management-and-operations
Provide a consistent and proven set of standards,
processes, and measurements across an entire
global data center portfolio

Validate that you have appropriate measures in


place to safeguard your facility from errors and
failuresmitigating the human factors risk that
accounts for the majority of unplanned downtime

Protect your investment in data center equipment


and systems and increase the market value of your
data center
Uptime Institute is a division of The 451 Group, a leading technology
Improve resource allocation industry analyst and data company. Uptime Institute has office locations
in the U.S., Mexico, Costa Rica, Brazil, U.K., Spain, U.A.E., Russia,
Establish a more effective selection process for
Taiwan, Singapore, and Malaysia.
service providers
Visit www.uptimeinstitute.com for more information.