Professional Documents
Culture Documents
FELIPE S. RIVERA
Civil Engineer TOTAL 16,200.00
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING
APPROVAL:
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
Page 1 of 105
REQUEST FOR: MEAL ALLOWANCES FOR MAPITA WORKERS
FELIPE S. RIVERA
Civil Engineer TOTAL 1,100.00
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING
APPROVAL:
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
Page 2 of 105
PROJECT
BAMBOO NURSERY COMPLEX
DATE
April 11 - 23, 2016
ADDRESS
Mapita Aguilar, Pangasinan
PREPARED BY
ERWIN B. SARMIENTO
Civil Engineer
CHECKED BY:
FELIPE S. RIVERA
Civil Engineer
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING
APPROVAL:
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
Page 3 of 105
REQUEST FOR: MEAL ALLOWANCES FOR MAPITA WORKERS
FELIPE S. RIVERA
Civil Engineer TOTAL 1,100.00
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING
APPROVAL:
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
Page 4 of 105
PROJECT
BAMBOO NURSERY COMPLEX
DATE
March 28 - April 9, 2016
ADDRESS
Mapita Aguilar, Pangasinan
PREPARED BY
ERWIN B. SARMIENTO
Civil Engineer
CHECKED BY:
FELIPE S. RIVERA
Civil Engineer
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING
APPROVAL:
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
Page 5 of 105
REQUEST FOR: MEAL ALLOWANCES FOR MAPITA WORKERS
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING
APPROVAL:
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
Page 6 of 105
REQUEST FOR: ALLOWANCES FOR MAPITA WORKERS
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING
APPROVAL:
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
Page 7 of 105
REQUEST FOR: ALLOWANCES FOR MAPITA WORKERS
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING
APPROVAL:
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
Page 8 of 105
REQUEST FOR: ALLOWANCES FOR MAPITA WORKERS
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING
APPROVAL:
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
Page 9 of 105
REQUEST FOR: ALLOWANCES FOR MAPITA WORKERS
CHECKED BY:
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
TOTAL
Dr. CEZAR T. QUIAMBAO 6,300.00
AMOUNT
Page 10 of 105
REQUEST FOR: ALLOWANCES FOR MAPITA WORKERS
CHECKED BY:
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
TOTAL
Dr. CEZAR T. QUIAMBAO 6,300.00
AMOUNT
Page 11 of 105
PROJECT
CSFIRST GREEN REQUEST FOR: DELIVERY
AMANPEREZ COMPOUND
Subject : SUBBASE WORKS @ Mapita Roads
DATE Location : Mapita Aguilar, Pangasinan
04 April, 2016
ADDRESS QUANTITY UNIT DESCRIPTION UNIT PRICE AMOUNT
Bayambang, Pangasinan
PREPARED BY 30 DT MSG 750.00 Err:509
FELIPE S. RIVERA
Civil Engineer Err:509
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant
Err:509
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
Err:509
APPROVED BY Err:509
Page 12 of 105
REQUEST FOR: ALLOWANCES FOR MAPITA WORKERS
CHECKED BY:
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
TOTAL
Dr. CEZAR T. QUIAMBAO 6,300.00
AMOUNT
Page 13 of 105
REQUEST FOR: ALLOWANCES FOR MAPITA WORKERS
ERWIN B. SARMIENTO
Civil Engineer
CHECKED BY:
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
TOTAL 4,500.00
AMOUNT
Page 14 of 105
REQUEST FOR: ALLOWANCES FOR MAPITA WORKERS
CHECKED BY:
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
TOTAL 6,900.00
AMOUNT
Page 15 of 105
REQUEST FOR: ALLOWANCES FOR MAPITA WORKERS
CHECKED BY:
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
TOTAL 7,200.00
AMOUNT
Page 16 of 105
REQUEST FOR: ALLOWANCES FOR MAPITA WORKERS
ERWIN B. SARMIENTO
Civil Engineer
CHECKED BY:
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
TOTAL 2,100.00
AMOUNT
Page 17 of 105
REQUEST FOR: ALLOWANCES FOR MAPITA WORKERS
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
TOTAL 7,800.00
AMOUNT
Page 18 of 105
REQUEST FOR: ALLOWANCES FOR MAPITA WORKERS
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
TOTAL 7,800.00
AMOUNT
Page 19 of 105
REQUEST FOR: ALLOWANCES FOR MAPITA WORKERS
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
TOTAL 7,800.00
AMOUNT
Page 20 of 105
REQUEST FOR: ALLOWANCES FOR MAPITA WORKERS
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
TOTAL 7,800.00
AMOUNT
Page 21 of 105
REQUEST FOR: ALLOWANCES FOR MAPITA WORKERS
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
TOTAL 7,800.00
AMOUNT
Page 22 of 105
REQUEST FOR: ALLOWANCES FOR MAPITA WORKERS
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
TOTAL 7,800.00
AMOUNT
Page 23 of 105
Subject : MAPITA WORKERS WITH ALLOWANCES
Page 24 of 105
REQUEST FOR: ALLOWANCES FOR MAPITA WORKERS
CHECKED BY:
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
TOTAL 7,200.00
AMOUNT
Page 25 of 105
Subject : MAPITA WORKERS WITH ALLOWANCES
Page 26 of 105
PROJECT
BAMBOO NURSERY COMPLEX
REQUEST FOR: ALLOWANCES FOR MAPITA WORKERS
ACCESS ROAD - 2.3 KM. Subject : MAPITA WORKERS WITH ALLOWANCES
DATE Location : Mapita, Aguilar, Pangasinan
October 26 - November 4, 2015
ADDRESS NAME OF WORKER DESIGNATION ALLOWANCE
Mapita Aguilar, Pangasinan
1 JIMMY GALSIM EXCAVATOR 150.00
PREPARED BY 2 ROBERT GARCIA LOADER/BACKHOE 150.00
3 JOHN ORACION LOADER 150.00
4 JAY-R ORACION LOADER 150.00
ERWIN B. SARMIENTO 5 ZALDY ELGIN EXCAVATOR 150.00
Civil Engineer 6 MARLON MONTEMAYOR ROLLER/COMPACTOR 150.00
FELIPE S. RIVERA
Civil Engineer
VERIFIED CORRECT
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
Page 27 of 105
Dr. CEZAR T. QUIAMBAO
CHAIRMAN-CEO
Page 28 of 105
PROJECT
BAMBOO NURSERY COMPLEX
REQUEST FOR: ALLOWANCES FOR MAPITA WORKERS
ACCESS ROAD - 2.3 KM. Subject : MAPITA WORKERS WITH ALLOWANCES
DATE Location : Mapita, Aguilar, Pangasinan
October 19-24, 2015
ADDRESS NAME OF WORKER DESIGNATION ALLOWANCE
Mapita Aguilar, Pangasinan
1 JIMMY GALSIM EXCAVATOR 150.00
PREPARED BY 2 ROBERT GARCIA LOADER/BACKHOE 150.00
3 JOHN ORACION LOADER 150.00
4 JAY-R ORACION LOADER 150.00
ERWIN B. SARMIENTO 5 ZALDY ELGIN EXCAVATOR 150.00
Civil Engineer 6 MARLON MONTEMAYOR ROLLER/COMPACTOR 150.00
FELIPE S. RIVERA
Civil Engineer
VERIFIED CORRECT
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
Page 29 of 105
REQUEST FOR: ALLOWANCES FOR MAPITA WORKERS
ERWIN B. SARMIENTO
Civil Engineer
CHECKED BY:
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
TOTAL 4,200.00
AMOUNT
Page 30 of 105
PROJECT
BAMBOO NURSERY COMPLEX
REQUEST FOR: ALLOWANCES FOR MAPITA WORKERS
ACCESS ROAD - 2.3 KM. Subject : MAPITA WORKERS WITH ALLOWANCES
DATE Location : Mapita, Aguilar, Pangasinan
October 12-17, 2015
ADDRESS NAME OF WORKER DESIGNATION ALLOWANCE
Mapita Aguilar, Pangasinan
1 JIMMY GALSIM EXCAVATOR 150.00
PREPARED BY 2 ROBERT GARCIA LOADER/BACKHOE 150.00
3 JOHN ORACION LOADER 150.00
4 JAY-R ORACION LOADER 150.00
ERWIN B. SARMIENTO 5 ZALDY ELGIN EXCAVATOR 150.00
Civil Engineer 6 MARLON MONTEMAYOR ROLLER/COMPACTOR 150.00
FELIPE S. RIVERA
Civil Engineer
VERIFIED CORRECT
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
Page 31 of 105
Dr. CEZAR T. QUIAMBAO
CHAIRMAN-CEO
Page 32 of 105
REQUEST FOR: ALLOWANCES FOR MAPITA WORKERS
PROJECT Subject : MAPITA WORKERS WITH ALLOWANCES
BAMBOO NURSERY
COMPLEX Location : Mapita, Aguilar, Pangasinan
ACCESS ROAD - 2.3 KM.
DATE NAME OF WORKER DESIGNATION ALLOWANCE
October 4 -9, 2016
ADDRESS 1 JIMMY GALSIM EXCAVATOR 150.00
Mapita Aguilar, Pangasinan 2 ROBERT GARCIA LOADER/BACKHOE 150.00
3 JOHN ORACION LOADER 150.00
PREPARED BY 4 JAY-R ORACION LOADER 150.00
5 ZALDY ELGIN EXCAVATOR 150.00
6 MARLON MONTEMAYOR ROLLER/COMPACTOR 150.00
ERWIN B. SARMIENTO
Civil Engineer 7 SONNY PEREZ DUMPTRUCK DRIVER 150.00
8 JELLEXIE MALICDEM DUMPTRUCK DRIVER 150.00
CHECKED BY: 9 FREDO EDURIA DUMPTRUCK DRIVER 150.00
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
Page 33 of 105
Dr. CEZAR T. QUIAMBAO
CHAIRMAN-CEO
Page 34 of 105
PROJECT
Bamboo Nursery Complex
REQUEST FOR: ALLOWANCES FOR MAPITA WORKERS
Subject : MAPITA WORKERS WITH ALLOWANCES
DATE Location : Mapita, Aguilar, Pangasinan
28 September, 2015
ADDRESS NAME OF WORKER DESIGNATION ALLOWANCE
Bayambang, Pangasinan
PREPARED BY 1 REY RESULTAN EXCAVATOR 150.00
2 ROBERT GARCIA LOADER/BACKHOE 150.00
ERWIN B. SARMIENTO 3 JOHN ORACION LOADER 150.00
Civil Engineer 4 JAY-R ORACION LOADER 150.00
CHECKED BY: 5 ZALDY ELGIN EXCAVATOR 150.00
6 MARLON MONTAMAYOR ROLLER/COMPACTOR 150.00
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
Page 35 of 105
REQUEST FOR: BNC ( ENGG. OFFICE & FORESTER'S OFFICE)
UNIT
PROJECT QUANTITY UNIT DESCRIPTION AMOUNT
PRICE
Bamboo Nursery Complex
BUNKHOUSE 100 bags Cement 230.00 23,000.00
DATE 2 DT Washed Sand 1400.00 2,800.00
11 January, 2016 2 DT Washed Gravel 1500.00 3,000.00
ADDRESS 16 pcs 12mm DSB 150.00 2,400.00
Bayambang, Pangasinan 30 pcs 10mm DSB 112.00 3,360.00
PREPARED BY 30 pcs 9mm DSB 76.00 2,280.00
200 pcs CHB (4") 8.00 1,600.00
ERWIN B. SARMIENTO GOOD LUMBER 0.00
Civil Engineer 8 pcs 4x4x12 400.00 3,200.00
CHECKED BY: 100 pcs 2X3X12 140.00 14,000.00
50 pcs 2X2X9 80.00 4,000.00
40 pcs 1X4X7 60.00 2,400.00
FELIPE S. RIVERA 2 kgs 1 1/2" CWN 70.00 140.00
Civil Engineer 5 kgs 2" CWN 70.00 350.00
VERIFIED CORRECT 5 kgs 3" CWN 70.00 350.00
5 kgs 4" CWN 70.00 350.00
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
Page 36 of 105
CHAIRMAN-CEO TOTAL VALUE 63,230.00
Page 37 of 105
REQUEST FOR: ELECTRICAL MATERIALS
UNIT
PROJECT QUANTITY UNIT DESCRIPTION AMOUNT
PRICE
Bamboo Nursery Complex 0.00
BUNKHOUSE 1 box #14 Stranded Wire 0.00
DATE 1 box #12 Stranded Wire 0.00
21 January, 2016 1 box Duplex Wire 0.00
ADDRESS 1 pc Circuit Breaker, 60 amp 0.00
Bayambang, Pangasinan 2 pcs Circuit Breaker, 30 amp
PREPARED BY 2 pcs Circuit Breaker, 20 amp
2 pcs Circuit Breaker, 15 amp
ERWIN B. SARMIENTO 24 pcs Single Switch
Civil Engineer 20 pcs Junction Box
CHECKED BY: 12 pcs Outlet, 2 gang
24 pcs Receptacle
24 pcs Anchor Box
FELIPE S. RIVERA 3 boxes Staple
Civil Engineer 3 pcs Electrical Tape
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
PRESIDENT-COO 0.00
0.00
APPROVED BY 0.00
0.00
0.00
0.00
Page 38 of 105
CHAIRMAN-CEO TOTAL VALUE 0.00
Page 39 of 105
REQUEST FOR: GOOD LUMBER (BUNKHOUSE)
UNIT
PROJECT QUANTITY UNIT DESCRIPTION AMOUNT
PRICE
Bamboo Nursery Complex
BUNKHOUSE 50 pcs 2X3X8 GOOD LUMBER
DATE
11 January, 2016 50 pcs 2X3X7 GOOD LUMBER 87.00 4,350.00
ADDRESS
Bayambang, Pangasinan 50 pcs 2X2X9 GOOD LUMBER 75.00 3,750.00
PREPARED BY
80 pcs 2X3X9 GOOD LUMBER 112.00 8,960.00
ERWIN B. SARMIENTO
Civil Engineer 17,060.00
CHECKED BY:
Delivered By:
RONALD SOTTO
FELIPE S. RIVERA Mapita Worker
Civil Engineer
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
Page 40 of 105
CHAIRMAN-CEO TOTAL VALUE 34,120.00
Page 41 of 105
REQUEST FOR: ADDITIONAL BAMBOO FOR BUNKHOUSE
Subject : BAMBOO
Location : Mapita, Aguilar, Pangasinan
UNIT
PROJECT QUANTITY UNIT DESCRIPTION AMOUNT
PRICE
Bamboo Nursery Complex
BUNKHOUSE 150 pcs KAWAYAN BAYOG 70.00 10,500.00
DATE
11 January, 2016 500 pcs KAWAYAN TINIK 70.00 35,000.00
ADDRESS
Bayambang, Pangasinan
PREPARED BY
ERWIN B. SARMIENTO
Civil Engineer 45,500.00
CHECKED BY:
Delivered By:
LEANDRO CAMBAY
FELIPE S. RIVERA Mapita Worker
Civil Engineer
VERIFIED CORRECT Received By:
JOEY DE VERA
Foreman
MAGIELYN A. RESULTAN
Accountant ALBERT JUNIO
Support Personnel
RECOMMENDING APPROVAL
ERWIN SARMIENTO
Engineer-In-Charge
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
Page 42 of 105
Dr. CEZAR T. QUIAMBAO
CHAIRMAN-CEO TOTAL VALUE 45,500.00
Page 43 of 105
REQUEST FOR: GOOD LUMBER (BUNKHOUSE)
UNIT
PROJECT QUANTITY UNIT DESCRIPTION AMOUNT
PRICE
Bamboo Nursery Complex
BUNKHOUSE 50 pcs 2X3X8 GOOD LUMBER 200.00 10,000.00
DATE
11 January, 2016 50 pcs 2X3X7 GOOD LUMBER 87.00 4,350.00
ADDRESS
Bayambang, Pangasinan 50 pcs 2X2X9 GOOD LUMBER 75.00 3,750.00
PREPARED BY
80 pcs 2X3X9 GOOD LUMBER 112.00 8,960.00
ERWIN B. SARMIENTO
Civil Engineer 27,060.00
CHECKED BY:
Delivered By:
RONALD SOTTO
FELIPE S. RIVERA Mapita Worker
Civil Engineer
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
Page 44 of 105
CHAIRMAN-CEO TOTAL VALUE 54,120.00
Page 45 of 105
REQUEST FOR: Bamboo Nursery Complex (BUNKHOUSE)
UNIT
PROJECT QUANTITY UNIT DESCRIPTION AMOUNT
PRICE
Bamboo Nursery Complex 5 kgs 2" CWN 70.00 350.00
BUNKHOUSE 5 kgs 3" CWN 70.00 350.00
DATE 120 bags Cement 230.00 27,600.00
11 January, 2016 4 elfs Sand 1500.00 6,000.00
ADDRESS 3 elfs Gravel 2400.00 7,200.00
Bayambang, Pangasinan 30 kgs Tie Wire 70.00 2,100.00
PREPARED BY 1000 pcs CHB (4") 8.00 8,000.00
50 pcs 9MM DRB 76.00 3,800.00
ERWIN B. SARMIENTO 50 pcs 10MM DRB 112.00 5,600.00
Civil Engineer 50 pcs 12MM DRB 150.00 7,500.00
CHECKED BY: 20 pcs PVC PIPE 1 1/2 60.00 1,200.00
2 liters PVC PIPE CEMENT 20.00 40.00
20 pcs PVC ELBOW 1/2 12.00 240.00
FELIPE S. RIVERA 8 pcs PVC COUPLING 1 1/2" 12.00 96.00
Civil Engineer 17 pcs PVC PIPE 2" 100.00 1,700.00
VERIFIED CORRECT 34 pcs PVC ELBOW 2" 12.00 408.00
8 pcs FAUCET 50.00
8 pcs FLOOR DRAIN 50.00 400.00
MAGIELYN A. RESULTAN 4 pcs SHOWER 350.00 1,400.00
Accountant 3 pcs TOILET BOWL 1200.00 3,600.00
5 pcs TEPLON 10.00 50.00
RECOMMENDING APPROVAL 8 pcs SWITCH 120.00 960.00
3 pcs JUNCTION BOX 20.00 60.00
1 box E. WIRE #12 1500.00 1,500.00
LEVIN. N. UY 5 pcs E. TAPE 60.00 300.00
PRESIDENT-COO 8 pcs SUCKET 100.00 800.00
12 pcs BULB 180.00 2,160.00
APPROVED BY 1 roll FLEXIBLE HOSE 1500.00 1,500.00
600 pcs TILES 8 x 8 30.00 18,000.00
15 bags ADHESIVE CEMENT 220.00 3,300.00
8 sets CR DOOR w/door knob 1500.00 12,000.00
Dr. CEZAR T. QUIAMBAO Labor : By Administration
Page 46 of 105
CHAIRMAN-CEO TOTAL VALUE 118,214.00
Page 47 of 105
REQUEST FOR: Bamboo Nursery C
Page 48 of 105
CHAIRMAN-CEO CHAIRMAN-CEO
Page 49 of 105
REQUEST FOR: Bamboo Nursery Complex (BUNKHOUSE)
UNIT
PROJECT DESCRIPTION AMOUNT
PRICE
Bamboo Nursery Complex 2" CWN 70.00 350.00
BUNKHOUSE 3" CWN 70.00 350.00
DATE Cement 230.00
11 January, 2016 Sand 1500.00
ADDRESS Gravel 2400.00
Bayambang, Pangasinan Tie Wire 70.00 2,100.00
PREPARED BY CHB (4") 8.00
9MM DRB 76.00 3,800.00 46
ERWIN B. SARMIENTO 10MM DRB 112.00 5,600.00 80
Civil Engineer 12MM DRB 150.00 7,500.00 115
CHECKED BY: PVC PIPE 1 1/2 60.00 1,200.00
PVC PIPE CEMENT 20.00 40.00
PVC ELBOW 1 1/2 12.00 240.00
FELIPE S. RIVERA PVC COUPLING 1 1/2" 12.00 96.00
Civil Engineer PVC PIPE 2" 100.00 1,700.00
VERIFIED CORRECT PVC ELBOW 2" 12.00 408.00
FAUCET 50.00
FLOOR DRAIN 50.00
MAGIELYN A. RESULTAN SHOWER 350.00
Accountant TOILET BOWL 1200.00
TEPLON 10.00
RECOMMENDING APPROVAL SWITCH 120.00
JUNCTION BOX 20.00
E. WIRE #12 1500.00
LEVIN. N. UY E. TAPE 60.00
PRESIDENT-COO SUCKET 100.00
BULB 180.00
APPROVED BY FLEXIBLE HOSE 1500.00
TILES 8 x 8 30.00
ADHESIVE CEMENT 220.00
CR DOOR w/door knob 1500.00
Dr. CEZAR T. QUIAMBAO
Labor : By Administration
Page 50 of 105
CHAIRMAN-CEO TOTAL VALUE 23,384.00
Page 51 of 105
REQUEST FOR: SALARY FOR GUARD (CAFGUS)
FELIPE S. RIVERA
Civil Engineer
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
TOTAL 21,500.00
AMOUNT
Page 52 of 105
REQUEST FOR: PSU CONCERT
UNIT
PROJECT QUANTITY UNIT DESCRIPTION AMOUNT
PRICE
WELCOME 2016
CONCERT 12 pcs Water Container, 80 liters 350.00 4,200.00
DATE 250 m Electric wire 21.00 5,250.00
04 January, 2016
ADDRESS
Bayambang, Pangasinan
PREPARED BY
ERWIN B.SARMIENTO
Civil Engineer
MAGIELYN A. RESULTAN
Accountant 0.00
0.00
RECOMMENDING APPROVAL 0.00
0.00
0.00
LEVIN. N. UY 0.00
PRESIDENT-COO 0.00
0.00
APPROVED BY 0.00
0.00
0.00
0.00
Dr. CEZAR T. QUIAMBAO
CHAIRMAN-CEO TOTAL VALUE 9,450.00
Page 53 of 105
REQUEST FOR: Bamboo Nursery Complex (BUNKHOUSE)
Subject : SEPTIC TANK & SITE DEVELOPMENT - BUNKHOUSE
Location : Mapita, Aguilar, Pangasinan
FELIPE S. RIVERA
Civil Engineer
VERIFIED CORRECT
Labor : By Administration
MAGIELYN A. RESULTAN 0.00
Accountant 0.00
0.00
RECOMMENDING APPROVAL 0.00
0.00
0.00
LEVIN. N. UY 0.00
PRESIDENT-COO 0.00
0.00
APPROVED BY 0.00
0.00
0.00
0.00
Dr. CEZAR T. QUIAMBAO
CHAIRMAN-CEO 29,240.00
Page 54 of 105
REQUEST FOR: Bamboo Nursery Complex (BUNKHOUSE)
UNIT
PROJECT QUANTITY UNIT DESCRIPTION AMOUNT
PRICE
Bamboo Nursery Complex 2 kgs Umbrella nail 120.00 240.00
BUNKHOUSE 2 kgs 1 1/2" CWN 70.00 140.00
DATE 5 kgs 2" CWN 70.00 350.00
03 November, 2015 5 kgs 3" CWN 70.00 350.00
ADDRESS 5 kgs 4" CWN 70.00 350.00
Bayambang, Pangasinan 12 rolls SAWALI Bamboo 350.00
PREPARED BY 120 bags Cement 230.00
4 elfs Sand 1500.00
ERWIN B. SARMIENTO 3 elfs Gravel 2400.00
Civil Engineer 30 kgs Tie Wire 70.00 2,100.00
CHECKED BY: 60 m Rope (3/4") 40.00
15 pcs Ridge Roll (8') 200.00
1000 pcs CHB (4") 8.00
FELIPE S. RIVERA 50 pcs 9MM DRB 90.00
Civil Engineer 200 pcs Bamboo 85.00 3,530.00
VERIFIED CORRECT Labor for harvesting Bamboo 2,000.00
Hauling of Bamboo up to the site 3,000.00
0.00
MAGIELYN A. RESULTAN Labor : By Administration
Accountant 0.00
0.00
RECOMMENDING APPROVAL 0.00
0.00
0.00
LEVIN. N. UY 0.00
PRESIDENT-COO 0.00
0.00
APPROVED BY 0.00
0.00
0.00
0.00
Dr. CEZAR T. QUIAMBAO
Page 55 of 105
CHAIRMAN-CEO TOTAL VALUE 12,060.00
Page 56 of 105
PROJECT
Bamboo Nursery Complex
BUNKHOUSE
DATE
03 November, 2015
ADDRESS
Bayambang, Pangasinan
PREPARED BY
ERWIN B. SARMIENTO
Civil Engineer
CHECKED BY:
FELIPE S. RIVERA
Civil Engineer
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
Page 57 of 105
CHAIRMAN-CEO
Page 58 of 105
REQUEST FOR: Bamboo Nursery Complex
UNIT
PROJECT QUANTITY UNIT DESCRIPTION AMOUNT
PRICE
Bamboo Nursery Complex
BUNKHOUSE 1 Pc Samsung TV 21" 10000.00 10,000.00
DATE 1 Pc Cignal Antenna 5000.00 5,000.00
15 December, 2015
ADDRESS
Aguilar, Pangasinan 3 pcs Laptop 25000.00 75,000.00
PREPARED BY ( For 3 Engineers)
ERWIN B. SARMIENTO
Civil Engineer
CHECKED BY:
FELIPE S. RIVERA
Civil Engineer 0.00
VERIFIED CORRECT 0.00
0.00
0.00
MAGIELYN A. RESULTAN 0.00
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY 0.00
PRESIDENT-COO 0.00
0.00
APPROVED BY 0.00
0.00
0.00
0.00
Dr. CEZAR T. QUIAMBAO
Page 59 of 105
CHAIRMAN-CEO TOTAL VALUE 90,000.00
Page 60 of 105
REQUEST FOR: Bamboo Nursery Complex (BUNKHOUSE)
UNIT
PROJECT QUANTITY UNIT DESCRIPTION AMOUNT
PRICE
Bamboo Nursery Complex
BUNKHOUSE 5 rolls 3/4' Water hose (Class A)
DATE 5 rolls 1' Water hose (Class A)
02 December, 2015
ADDRESS
Bayambang, Pangasinan
PREPARED BY
ERWIN B. SARMIENTO
Civil Engineer
CHECKED BY:
FELIPE S. RIVERA
Civil Engineer
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant 0.00
0.00
RECOMMENDING APPROVAL 0.00
0.00
0.00
LEVIN. N. UY 0.00
PRESIDENT-COO 0.00
0.00
APPROVED BY 0.00
0.00
0.00
0.00
Dr. CEZAR T. QUIAMBAO
Page 61 of 105
CHAIRMAN-CEO TOTAL VALUE 0.00
Page 62 of 105
REQUEST FOR: RADIO UNITS
Subject : HANDHELD RADIO & BASE RADIO STATION UNITS
Location : Mapita Aguilar, Pangasinan
PROJECT DESCRIPTION/ITEM UNITS AMOUNT
BAMBOO NURSERY COMPLEX
LOADER 1
DATE JCB TRACTOR 1
05 November, 2015 ROLLER/COMPACTOR 1
ADDRESS BULLDOZER 2
Mapita Aguilar, Pangasinan FORD RANGER 2
BACKHOE, 200 PC 1
PREPARED BY GRADER 2
DUMPTRUCKS 5
MINI-DUMP 1
ERWIN B. SARMIENTO
Civil Engineer BASE CAMP 1
FELIPE S. RIVERA
Civil Engineer
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
Page 63 of 105
Dr. CEZAR T. QUIAMBAO
CHAIRMAN-CEO TOTAL AMOUNT
Page 64 of 105
REQUEST FOR: DELIVERY
Subject : Gravel Delivery at CSFirst Green Learning Center
Location : Amanperez Bayambang, Pangasinan
ERWIN B. SARMIENTO
Civil Engineer
CHECKED BY:
FELIPE S. RIVERA
Civil Engineer
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
Page 65 of 105
REQUEST FOR: DELIVERY
Subject : Gravel Delivery at CSFirst Green Learning Center
Location : Amanperez Bayambang, Pangasinan
ERWIN B. SARMIENTO
Civil Engineer
CHECKED BY:
FELIPE S. RIVERA
Civil Engineer
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
Page 66 of 105
REQUEST FOR: DELIVERY
Subject : Sand Delivery at CSFirst Green Learning Center
Location : Amanperez Bayambang, Pangasinan
ERWIN B. SARMIENTO
Civil Engineer
CHECKED BY:
FELIPE S. RIVERA
Civil Engineer
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
Page 67 of 105
REQUEST FOR: 4-Unit Box Culvert along 2,3km Access Road
Subject : Construction of Box Culvert
Location : Mapita, Aguilar, Pangasinan
Labor (30%)
FELIPE S. RIVERA
Civil Engineer
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
Page 68 of 105
REQUEST FOR: Bamboo Nursery Complex (BUNKHOUSE)
Subject : RENOVATION OF BUNKHOUSE
Location : Mapita, Aguilar, Pangasinan
Page 69 of 105
Page 70 of 105
REQUEST FOR: Bamboo Nursery Complex (BUNKHOUSE)
Subject : RENOVATION OF BUNKHOUSE
Location : Mapita, Aguilar, Pangasinan
Page 71 of 105
Page 72 of 105
REQUEST FOR: Bamboo Nursery Complex (BUNKHOUSE)
Subject : RENOVATION OF BUNKHOUSE
Location : Mapita, Aguilar, Pangasinan
ERWIN B. SARMIENTO
Civil Engineer
CHECKED BY:
FELIPE S. RIVERA
Civil Engineer
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
Page 73 of 105
PRESIDENT-COO
APPROVED BY
Page 74 of 105
Page 75 of 105
REQUEST FOR: Bamboo Nursery Complex SUPPLIES
Subject : BNC SUPPLIES
Location : Mapita, Aguilar, Pangasinan
ERWIN B. SARMIENTO
Civil Engineer
CHECKED BY:
FELIPE S. RIVERA
Civil Engineer
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
APPROVED BY
Page 76 of 105
PROJECT
CSFIRST GREEN REQUEST FOR: DELIVERY
AMANPEREZ COMPOUND
Subject : CONCRETING WORKS
DATE Location : CSFirst Green Compound Amanperez, Bayambang
28 September, 2015
ADDRESS QUANTITY UNIT DESCRIPTION UNIT PRICE AMOUNT
Bayambang, Pangasinan
PREPARED BY 1 DT SAND 1400.00 Err:509
ERWIN B. SARMIENTO
Civil Engineer Err:509
CHECKED BY: Err:509
FELIPE S. RIVERA
Civil Engineer Err:509
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant
Err:509
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
Err:509
APPROVED BY Err:509
sub-total Err:508
Total 1,400.00
Page 77 of 105
PROJECT
Bamboo Nursery Complex
REQUEST FOR: MAPITA EMPLOYEE, DRIVERS & H.E. OPERATORS
Subject : BNC SUPPLIES for Employee
DATE Location : Mapita, Aguilar, Pangasinan
23 September, 2015
ADDRESS QUANTITY UNIT DESCRIPTION UNIT PRICE AMOUNT
Bayambang, Pangasinan
PREPARED BY 54 pcs Uniform(Long sleeves) Err:509
20 pcs Safety Shoes (steel toe) Err:509
ERWIN B. SARMIENTO 10 pcs White Helmet w/neck support
Civil Engineer 8 pcs Green Helmet w/neck support Err:509
CHECKED BY: 5 pcs Blue Helmet w/neck support Err:509
36 pcs Mask
18 pairs Ear Plug
FELIPE S. RIVERA 20 pcs colored Goggle
Civil Engineer 20 pcs Log Books Err:509
VERIFIED CORRECT 54 pcs Towels
18 pcs Coverall Safety Cloths
36 pairs Safety Gloves
MAGIELYN A. RESULTAN 1 roll Safety Caution Tape
Accountant 1 box FIRST AID KIT
2 pcs Scientific Calculator Err:509
RECOMMENDING APPROVAL (for engineer)
18 pcs Sleeping Bags
18 pcs Flashlights
LEVIN. N. UY 20 pcs Raincoats
PRESIDENT-COO For Mechanic
10 pcs Dumptruck Tires with steel ply Err:509
APPROVED BY Err:509
sub-total Err:508
Total 0.00
Page 78 of 105
PROJECT
CSFIRST GREEN REQUEST FOR: DELIVERY
AMANPEREZ COMPOUND
Subject : CONCRETING WORKS
DATE Location : CSFirst Green Compound Amanperez, Bayambang
15 September, 2015
ADDRESS QUANTITY UNIT DESCRIPTION UNIT PRICE AMOUNT
Bayambang, Pangasinan
PREPARED BY 1 DT SAND 1400.00 Err:509
1 DT GRAVEL 1500.00 Err:509
ERWIN B. SARMIENTO
Civil Engineer Err:509
CHECKED BY: Err:509
FELIPE S. RIVERA
Civil Engineer Err:509
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant
Err:509
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
Err:509
APPROVED BY Err:509
sub-total Err:508
Total 2,900.00
Page 79 of 105
PROJECT
CSFIRST GREEN REQUEST FOR: DELIVERY
AMANPEREZ COMPOUND
Subject : CONCRETING WORKS
DATE Location : CSFirst Green Compound Amanperez, Bayambang
15 September, 2015
ADDRESS QUANTITY UNIT DESCRIPTION UNIT PRICE AMOUNT
Bayambang, Pangasinan
PREPARED BY 20 DT MSG 750.00 Err:509
ERWIN B. SARMIENTO
Civil Engineer Err:509
CHECKED BY: Err:509
FELIPE S. RIVERA
Civil Engineer Err:509
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant
Err:509
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
Err:509
APPROVED BY Err:509
sub-total Err:508
Total 15,000.00
Page 80 of 105
PROJECT
CSFIRST GREEN REQUEST FOR: DELIVERY
AMANPEREZ COMPOUND
Subject : CONCRETING WORKS
DATE Location : CSFirst Green Compound Amanperez, Bayambang
09 September, 2015
ADDRESS QUANTITY UNIT DESCRIPTION UNIT PRICE AMOUNT
Bayambang, Pangasinan
PREPARED BY 3 DT MSG 750.00 Err:509
FELIPE S. RIVERA
Civil Engineer Err:509
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant
Err:509
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
Err:509
APPROVED BY Err:509
sub-total Err:508
Total 2,250.00
Page 81 of 105
PROJECT
CSFIRST GREEN REQUEST FOR: DELIVERY
AMANPEREZ COMPOUND
Subject : CONCRETING WORKS
DATE Location : CSFirst Green Compound Amanperez, Bayambang
09 September, 2015
ADDRESS QUANTITY UNIT DESCRIPTION UNIT PRICE AMOUNT
Bayambang, Pangasinan
PREPARED BY 3 DT MSG 750.00 Err:509
FELIPE S. RIVERA
Civil Engineer Err:509
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant
Err:509
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
Err:509
APPROVED BY Err:509
sub-total Err:508
Total 2,250.00
Page 82 of 105
PROJECT
CSFIRST GREEN REQUEST FOR: DELIVERY
AMANPEREZ COMPOUND
Subject : CONCRETING WORKS
DATE Location : CSFirst Green Compound Amanperez, Bayambang
07 September, 2015
ADDRESS QUANTITY UNIT DESCRIPTION UNIT PRICE AMOUNT
Bayambang, Pangasinan
PREPARED BY 1 DT SAND 1,400.00 Err:509
7 DT MSG 750.00 Err:509
ERWIN B. SARMIENTO Err:509
Civil Engineer Err:509
CHECKED BY: Err:509
FELIPE S. RIVERA
Civil Engineer Err:509
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant
Err:509
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
Err:509
APPROVED BY Err:509
sub-total Err:508
Total 6,650.00
Page 83 of 105
Project:
Proposed FENCE @ Bulilit
Petron Gasoline Station
Date:
Address:
Bayambang, Pangasinan
Prepared By: DESCRIPTION Qty Unit Unit Cost Amount
Portland Cement 350 bags 230.00 Err:509
Erwin B. Sarmiento Washed Sand 40 m3 400.00 Err:509
Civil Engineer - Office Washed Gravel 30 m 3
800.00 Err:509
Checked By: 10mm x 6.0m DSB 155 pcs. 99.00 Err:509
12mm x 6.0m DSB 200 pcs. 143.00 Err:509
G.I.Tie Wire, #16 25 kgs 70.00 Err:509
Felipe S. Rivera Jr. CHB (5") 2500 pcs. 15.00 Err:509
Civil Engineer - Operation coco lumber 250 BD.FT. 25.00 Err:509
Verified Correct: Marine Plywood(1/4'') 10 pcs 350.00 Err:509
CWN Nail ASSORTED 6 kgs 80.00 Err:509
Magielyn A. Resultan
Accountant
LEVIN. N. UY
PRESIDENT-COO LABOR 30 % Err:509
Approved By:
Page 84 of 105
Project:
Proposed FENCE @ Bulilit
REQUEST FOR : CONSTRUCTION MATERIALS
Petron Gasoline Station SUBJECT : BILL OF MATERIALS
Date: LOCATION : Amanperez Bayambang, Pangasinan
Address:
Bayambang, Pangasinan
Prepared By:
Erwin B. Sarmiento
Civil Engineer - Office
Checked By:
Magielyn A. Resultan
Accountant
Recommending Approval:
LEVIN. N. UY
PRESIDENT-COO
Approved By:
Page 85 of 105
Project:
CONSTRUCTION MATERIALS
Proposed FENCE @ Bulilit
BILL OF MATERIALS Petron Gasoline Station
Amanperez Bayambang, Pangasinan
Date:
Address:
Bayambang, Pangasinan
Prepared By:
Erwin B. Sarmiento
Civil Engineer - Office
Checked By:
Magielyn A. Resultan
Accountant
Recommending Approval:
LEVIN. N. UY
PRESIDENT-COO
Approved By:
Page 86 of 105
PROJECT
CSFirst Green Projects REQUEST FOR: DELIVERY
Subject : Miscellaneous Supplies
DATE Location : CSFirst Green Compound Amanperez, Bayambang
FELIPE S. RIVERA
Civil Engineer Err:509
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant
Err:509
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
Err:509
APPROVED BY Err:509
sub-total Err:508
Total 0.00
Page 87 of 105
PROJECT
CHB CANAL LINING
DRAINAGE PROJECT Inside The CSFirst Green AIDI Compound
(0.40M X 1.00M) Subject : Proposed Project Cost
DATE Location: Amanperez Bayambang, Pangasinan
APPROVED BY:
Err:509
Err:509
Err:509
Dr. CEZAR T. QUIAMBAO
CHAIRMAN-CEO
Total 272,825.00
Page 88 of 105
PROJECT
DRAINAGE PROJECT Outside the CSFirst Green AIDI Compound
REINFORCED CONCRETE CANAL
(1.00M X 1.00M) Subject : Proposed Project Cost
DATE Location: Amanperez Bayambang, Pangasinan
APPROVED BY:
Err:509
Err:509
Total 255,610.00
Page 89 of 105
PROJECT
BAMBOO PLANTATION REQUEST FOR: MEAL ALLOWANCE
subject : Monthly Allowance for CAFGU - Security Forces
DATE location : Mapita, Aguilar, Pamgasinan
March 1-31, 2016
ADDRESS QUANTITY UNIT DESCRIPTION UNIT PRICE AMOUNT
Aguilar, Pangasinan
Groceries
PREPARED BY: 1 set 2,200.00 Err:509
(assorted)
1 bag Rice 2,300.00 Err:509
ERWIN B. SARMIENTO Err:509
Civil Engineer Err:509
NOTED BY: Err:509
FELIPE S. RIVERA
Civil Engineer Err:509
VERIFIED CORRECT:
MAGIELYN A. RESULTAN
Accountant
Err:509
RECOMMENDING APPROVAL:
LEVIN. N. UY
PRESIDENT-COO
Err:509
APPROVED BY: Err:509
sub-total Err:508
Total 4,500.00
Page 90 of 105
PROJECT
BAMBOO PLANTATION REQUEST FOR: MEAL ALLOWANCE
subject : Monthly Allowance for CAFGU - Security Forces
DATE location : Mapita, Aguilar, Pamgasinan
February, 2016
ADDRESS QUANTITY UNIT DESCRIPTION UNIT PRICE AMOUNT
Aguilar, Pangasinan
Groceries
PREPARED BY: 1 set 2,200.00 Err:509
(assorted)
1 bag Rice 2,300.00 Err:509
ERWIN B. SARMIENTO Err:509
Civil Engineer Err:509
NOTED BY: Err:509
FELIPE S. RIVERA
Civil Engineer Err:509
VERIFIED CORRECT:
MAGIELYN A. RESULTAN
Accountant
Err:509
RECOMMENDING APPROVAL:
LEVIN. N. UY
PRESIDENT-COO
Err:509
APPROVED BY: Err:509
sub-total Err:508
Total 4,500.00
Page 91 of 105
PROJECT
BAMBOO PLANTATION REQUEST FOR: MEAL ALLOWANCE
subject : Meal Allowance for CAFGU - Security Forces
DATE location : Mapita, Aguilar, Pamgasinan
FELIPE S. RIVERA
Civil Engineer Err:509
VERIFIED CORRECT:
MAGIELYN A. RESULTAN
Accountant
Err:509
RECOMMENDING APPROVAL:
LEVIN. N. UY
PRESIDENT-COO
Err:509
APPROVED BY: Err:509
sub-total Err:508
Total 4,800.00
Page 92 of 105
PROJECT
Proposed Bulilit Petron REQUEST FOR: DELIVERY
Gasoline Station subject : BACKFILLING WORKS
DATE location : Amanperez Bayambang, Pangasinan
03 August, 2015
ADDRESS QUANTITY UNIT DESCRIPTION UNIT PRICE AMOUNT
Bayambang, Pangasinan
PREPARED BY: 35 DT LOOSE MATERIAL - SOIL 100.00 Err:509
Err:509
ERWIN B. SARMIENTO Err:509
Civil Engineer Err:509
NOTED BY: Err:509
FELIPE S. RIVERA
Civil Engineer Err:509
VERIFIED CORRECT:
MAGIELYN A. RESULTAN
Accountant
Err:509
RECOMMENDING APPROVAL:
LEVIN. N. UY
PRESIDENT-COO
Err:509
APPROVED BY: Err:509
sub-total Err:508
Total 3,500.00
Page 93 of 105
PROJECT
Proposed Bulilit Petron REQUEST FOR: DELIVERY
Gasoline Station subject : BACKFILLING WORKS
DATE location : Amanperez Bayambang, Pangasinan
30 March, 2017
ADDRESS QUANTITY UNIT DESCRIPTION UNIT PRICE AMOUNT
Bayambang, Pangasinan
PREPARED BY: 80 DT LOOSE MATERIAL - SOIL 100.00 Err:509
Err:509
ERWIN B. SARMIENTO Err:509
Civil Engineer Err:509
NOTED BY: Err:509
FELIPE S. RIVERA
Civil Engineer Err:509
VERIFIED CORRECT:
MAGIELYN A. RESULTAN
Accountant
Err:509
RECOMMENDING APPROVAL:
LEVIN. N. UY
PRESIDENT-COO
Err:509
APPROVED BY: Err:509
sub-total Err:508
Total 8,000.00
Page 94 of 105
PROJECT
AMANPEREZ LEARNING REQUEST FOR: DELIVERY
CENTER subject : BACKFILLING WORKS
DATE location : Amanperez Bayambang, Pangasinan
30 March, 2017
ADDRESS QUANTITY UNIT DESCRIPTION UNIT PRICE AMOUNT
Bayambang, Pangasinan
PREPARED BY: 64 DT 100.00 Err:509
Err:509
ERWIN B. SARMIENTO Err:509
Civil Engineer Err:509
NOTED BY: Err:509
FELIPE S. RIVERA
Civil Engineer Err:509
VERIFIED CORRECT:
MAGIELYN A. RESULTAN
Accountant
Err:509
RECOMMENDING APPROVAL:
LEVIN. N. UY
PRESIDENT-COO
Err:509
APPROVED BY: Err:509
sub-total Err:508
Total 6,400.00
Page 95 of 105
PROJECT
PROPOSED BULILIT PETRON REQUEST FOR: DELIVERY
STATION subject : BACKFILLING WORKS
DATE location : Amanperez Bayambang, Pangasinan
30 March, 2017
ADDRESS QUANTITY UNIT DESCRIPTION UNIT PRICE AMOUNT
Bayambang, Pangasinan
PREPARED BY: 64 DT 100.00 Err:509
Err:509
ERWIN B. SARMIENTO Err:509
Civil Engineer Err:509
NOTED BY: Err:509
FELIPE S. RIVERA
Civil Engineer Err:509
VERIFIED CORRECT:
MAGIELYN A. RESULTAN
Accountant
Err:509
RECOMMENDING APPROVAL:
LEVIN. N. UY
PRESIDENT-COO
Err:509
APPROVED BY: Err:509
sub-total Err:508
Total 6,400.00
Page 96 of 105
PROJECT
CSFIRST GREEN REQUEST FOR: DELIVERY
AMANPEREZ COMPOUND
Subject : CONCRETING WORKS
DATE Location : CSFirst Green Compound Amanperez, Bayambang
27 August, 2015
ADDRESS QUANTITY UNIT DESCRIPTION UNIT PRICE AMOUNT
Bayambang, Pangasinan
PREPARED BY 1 DT SAND 1,400.00 Err:509
1 DT GRAVEL 1,500.00 Err:509
ERWIN B. SARMIENTO Err:509
Civil Engineer Err:509
CHECKED BY: Err:509
FELIPE S. RIVERA
Civil Engineer Err:509
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant
Err:509
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
Err:509
APPROVED BY Err:509
sub-total Err:508
Total 2,900.00
Page 97 of 105
PROJECT
CSFIRST GREEN REQUEST FOR: DELIVERY
AMANPEREZ COMPOUND
Subject : CONCRETING WORKS
DATE Location : CSFirst Green Compound Amanperez, Bayambang
17 August, 2015
ADDRESS QUANTITY UNIT DESCRIPTION UNIT PRICE AMOUNT
Bayambang, Pangasinan
PREPARED BY 1 DT SAND ### Err:509
1 DT GRAVEL ### Err:509
ERWIN B. SARMIENTO Err:509
Civil Engineer Err:509
CHECKED BY: Err:509
FELIPE S. RIVERA
Civil Engineer Err:509
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant
Err:509
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
Err:509
APPROVED BY Err:509
sub-total Err:508
Total 2,900.00
Page 98 of 105
PROJECT
DRAINAGE PROJECT REQUEST FOR: DELIVERY
Subject : Construction of Drainage
DATE Location : CSFirst Green Compound Amanperez, Bayambang
FELIPE S. RIVERA
Civil Engineer Err:509
VERIFIED CORRECT
MAGIELYN A. RESULTAN
Accountant
Err:509
RECOMMENDING APPROVAL
LEVIN. N. UY
PRESIDENT-COO
Err:509
APPROVED BY Err:509
sub-total Err:508
Total 1,500.00
Page 99 of 105
PROJECT
MSG DELIVERY - REQUEST FOR: DELIVERY
AMANPEREZ
subject : SPREADING OF MSG
DATE location : Amanperez Bayambang, Pangasinan
30 March, 2017
ADDRESS QUANTITY UNIT DESCRIPTION UNIT PRICE AMOUNT
Bayambang, Pangasinan
PREPARED BY: 5 DT MIXED SAND & GRAVEL 750.00 Err:509
Err:509
ERWIN B. SARMIENTO Err:509
Civil Engineer Err:509
NOTED BY: Err:509
FELIPE S. RIVERA
Civil Engineer Err:509
VERIFIED CORRECT:
MAGIELYN A. RESULTAN
Accountant
Err:509
RECOMMENDING APPROVAL:
LEVIN. N. UY
PRESIDENT-COO
Err:509
APPROVED BY: Err:509
sub-total Err:508
Total 3,750.00
FELIPE S. RIVERA
Civil Engineer Err:509
VERIFIED CORRECT:
MAGIELYN A. RESULTAN
Accountant
Err:509
RECOMMENDING APPROVAL:
LEVIN. N. UY
PRESIDENT-COO
Err:509
APPROVED BY: Err:509
sub-total Err:508
Total 9,750.00
Address:
Bayambang, Pangasinan
Prepared By: DESCRIPTION Qty Unit Unit Cost Amount
Reinforced Concrete Culvert (1.00m) 23 pcs 2,600.00 Err:509
Erwin B. Sarmiento Portland Cement 7 bags 220.00 Err:509
Civil Engineer - Office Washed Sand 1 elf 1,200.00 Err:509
Checked By: Washed Gravel 1 elf 2,200.00 Err:509
CHB (6") 150 pcs 15.00 Err:509
12mm x 6.0m DSB 5 pcs 143.00 Err:509
Felipe S. Rivera Jr. GI Tie Wire #16 1 kg 70.00 Err:509
Civil Engineer - Operation Angle Bar, 2" x 3/8" 2 pcs 530.00 Err:509
Verified Correct: Flat Bar, 2" x 3/8" 3 pcs 370.00 Err:509
Plywood (1/4") 1 pc 350.00 Err:509
Coco lumber ( 2"x 3" x 10' ) 10 pcs 75.00 Err:509
Magielyn A. Resultan CWN ( 1-1/2" ) 0.5 kg 80.00 Err:509
Accountant CWN ( 2" ) 1 kg 80.00 Err:509
LEVIN. N. UY
PRESIDENT-COO LABOR 30 % Err:509
Approved By:
Address:
Bayambang, Pangasinan
Prepared By:
Erwin B. Sarmiento
Civil Engineer - Office
Checked By:
Magielyn A. Resultan
Accountant
Recommending Approval:
LEVIN. N. UY
PRESIDENT-COO
Approved By:
Address:
Bayambang, Pangasinan
Prepared By:
Erwin B. Sarmiento
Civil Engineer - Office
Checked By:
Magielyn A. Resultan
Accountant
Recommending Approval:
LEVIN. N. UY
PRESIDENT-COO
Approved By:
PREPARED BY:
Err:509
ERWIN B. SARMIENTO Err:509
Civil Engineer Err:509
NOTED BY: Err:509
FELIPE S. RIVERA
Civil Engineer Err:509
VERIFIED CORRECT:
MAGIELYN A. RESULTAN
Accountant
Err:509
RECOMMENDING APPROVAL:
LEVIN. N. UY
PRESIDENT-COO
Err:509
APPROVED BY: Err:509
sub-total
Total