DAFTAR ISI / TABLE OF CONTENTS

SURAT PENGANTAR / LETTER .......................................................................... 1

DAFTAR ISI / TABLE OF CONTENT ................................................................... 2

I. PENDAHULUAN / INTRODUCTION .......................................................... 3

II. PILE DYNAMIC ANALYZER ....................................................................... 3


II. 1. DATA TIANG UJI / TEST PILE DATA ............................................... 4
II. 2. ALAT PDA / PDA EQUIPMENTS ....................................................... 5
II. 3. METODE KERJA / METHOD STATEMENT ...................................... 5

III. MONITORING TIANG UJI / TEST PILE MONITORING .......................... 6


IV. DISKUSI / DISCUSSION................................................................................ 7

GAMBAR : Denah Pondasi


FIGURE : Site Plan

LAMPIRAN / APPENDICES

LAMPIRAN A : (10) Data PDA dan Analisis CAPWAP


APPENDIX A : (10) PDA Data and CAPWAP Analysis

LAMPIRAN B : Spesifikasi Alat PDA


APPENDIX B : Specification of PDA Equipment

LAMPIRAN C : Kalibrasi Transducer & Accelerometer


APPENDIX C : Transducer & Accelerometer Calibrations

GEOTECHNICAL INSTRUMENTATION:
INCLINOMETER PIEZOMETER WATER STAND PIPE OBSERVATION WELL SETTLEMENT GAUGES

FOUNDATION TESTING:
STATIC LOAD TEST (INSTRUMENTED WITH VWSG) DYNAMIC LOAD TEST (PDA+CAPWAP)
PILE INTEGRITY TEST (PIT) CROSSHOLE SONIC LOGGING
THERMAL INTEGRITY PROFILING (TIP)

ENVIRONMENT MONITORING:
VIBRATION MONITORING TILTMETER CRACKMETER
Ge tech EFATHAMA
Jl. Sunter Agung Niaga VI blok G6 no 40-41
Sunter Podomoro, Indonesia 14350
Telp. +62-21-293A1 P56721/22 Fax. +62-21-293A1 P56720
www.geotech-indonesia.com
H GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GE

I. PENDAHULUAN / INTRODUCTION

Sesuai permintaan Perum. Pembangunan According to the request of Perum.


Perumahan Nasional, pengujian (10) tiang Pembangunan Perumahan Nasional, (10)
dengan sistem Pile Driving Analyzer (PDA) Pile Driving Analyzer (PDA) test have been
telah dilaksanakan pada tanggal 14 - 17 done on February 14th - 17th, 2017 at
Februari 2017 di Proyek Rusunami Wisma Rusunami Wisma Atlet Project, located at
Atlet, berlokasi di Palembang. Palembang.

Tujuan pengujian PDA adalah untuk The purpose of PDA test is to confirm the
memperoleh kapasitas penurunan tiang dan part of pile capacity.
keutuhan tiang.

II. PILE DRIVING ANALYZER (PDA)

Pile Driving Analyzer (PDA) adalah suatu Pile Driving Analyzer (PDA) is a complete
sistem pengujian dengan menggunakan data full-system computer with special strain
digital komputer yang diperoleh dari strain transducer and accelerometer to determine the
transducer dan accelerometer untuk force and velocity graphic form when pile
memperoleh kurva gaya dan kecepatan ketika struck by a hammer. Results of PDA consist
tiang dipukul menggunakan palu dengan of pile capacity, displacement, hammer
berat tertentu. Hasil dari pengujian PDA energy, etc.
terdiri dari kapasitas tiang, energi palu,
penurunan, dll.

Pada umumnya, pengujian dengan metode In general, PDA testing done after pile have
PDA dilaksanakan setelah tiang mempunyai enough strength to resist impact from
kekuatan yang cukup untuk menahan hammer, another anticipation can be done
tumbukan palu. Metode lain yang dapat using cushion or lower the hammer stroke
digunakan untuk menahan tumbukan adalah and use heavier hammer.
dengan menggunakan cushion, merendahkan
tinggi jatuh palu & menggunakan palu yang
lebih berat.

GEOTECHNICAL INSTRUMENTATION:
INCLINOMETER PIEZOMETER WATER STAND PIPE OBSERVATION WELL SETTLEMENT GAUGES

FOUNDATION TESTING:
STATIC LOAD TEST (INSTRUMENTED WITH VWSG) DYNAMIC LOAD TEST (PDA+CAPWAP)
PILE INTEGRITY TEST (PIT) CROSSHOLE SONIC LOGGING
THERMAL INTEGRITY PROFILING (TIP)

ENVIRONMENT MONITORING:
VIBRATION MONITORING TILTMETER CRACKMETER
Ge tech EFATHAMA
Jl. Sunter Agung Niaga VI blok G6 no 40-41
Sunter Podomoro, Indonesia 14350
Telp. +62-21-293A1 P56721/22 Fax. +62-21-293A1 P56720
www.geotech-indonesia.com
H GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GE

II. 1. Data Tiang Uji / Test Pile Data

Data tiang uji disajikan dalam Tabel 1 Test pile data is presented in Table 1 below:
dibawah ini:

Pile Pile Pile Pile


Pile
Pile No Dimension Length Embedment Penetration Hammer Testing Date
Type
(cm) (m) (m) (m)
TOWER 2
30.6 29.8 29.6
NO 17
February 16th, 2017
TOWER 2
30.6 29.8 29.6
NO 109
TOWER 2
28.7 27.9 27.7 February 17th, 2017
NO 245
TOWER 2
30.3 29.7 29.5 February 16th, 2017
NO 319
TOWER 2
30.2 29.5 29.3 DROP H
NO 503 Square
40 X 40 3.0 February 17th, 2017
TOWER 3 Pile
34.5 33.9 33.7 Tons
NO 9
TOWER 3
35.0 34.4 34.2
NO 81
February 14th, 2017
TOWER 3
35.0 34.2 34.0
NO 82
TOWER 3
34.7 33.7 33.6 February 15th, 2017
NO 282
TOWER 3
34.5 33.9 33.7 February 17th, 2017
NO 502

II. 2. Alat PDA / PDA Equipments

PDA-PAX PDA-PAX
Dua (2) wireless strain transducer Two (2) wireless strain transducer
Dua (2) wireless accelerometer Two (2) wireless accelerometer
Peralatan tambahan; antara lain bor Additional tools, i.e.: concrete drill,
tangan, gerinda, dan perlengkapan grinder, bolt & nut and safety
safety. equipment

GEOTECHNICAL INSTRUMENTATION:
INCLINOMETER PIEZOMETER WATER STAND PIPE OBSERVATION WELL SETTLEMENT GAUGES

FOUNDATION TESTING:
STATIC LOAD TEST (INSTRUMENTED WITH VWSG) DYNAMIC LOAD TEST (PDA+CAPWAP)
PILE INTEGRITY TEST (PIT) CROSSHOLE SONIC LOGGING
THERMAL INTEGRITY PROFILING (TIP)

ENVIRONMENT MONITORING:
VIBRATION MONITORING TILTMETER CRACKMETER
Ge tech EFATHAMA
Jl. Sunter Agung Niaga VI blok G6 no 40-41
Sunter Podomoro, Indonesia 14350
Telp. +62-21-293A1 P56721/22 Fax. +62-21-293A1 P56720
www.geotech-indonesia.com
H GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GE

II. 3. Metode Kerja / Method Statement

Pengujian PDA dilaksanakan berdasarkan PDA test will be carried out in accordance
ASTM D4945-12. with ASTM D4945-12.
Pekerjaan persiapan dilaksanakan sebelum Preparation should be done before testing is
pengujian dilakukan. Persiapan ini antara conducted. The preparation works consist of
lain : steps as follow:

Kondisi kepala tiang sebaiknya rata, Make sure that pile head in straight,
simetris dan tegak lurus. edge and flat surface.
Pasang strain transducer dan Attach strain transducer and
accelerometer disisi tiang saling accelerometer to the side section of
tegak lurus dengan jarak minimal 1.5 pile with 1.5 X Diameter (D)
X Diameter (D) dari kepala tiang. distance from pile head. Make sure
Persiapkan palu dan cushion pada the location of the transducers is
kepala tiang. approximately180 and place in a
Masukkan kalibrasi strain transducer straight surface perpendicular to pile
dan accelerometer kemudian periksa body.
konesitas peralatan pengujian secara Install hammer and cushion to pile
keseluruhan. head,
Masukkan data tiang dan palu dalam Calibrate strain transducer and
PDA PAX. accelerometer; check the
Setelah semua tampak siap, selalu connectivity of all instruments using
lakukan pengecekan ulang untuk PDA equipment.
memastikan pengujian telah siap Input all pile data to PDA PAX.
dilaksanakan. After everything looks ready,
always do a double check to make
sure everything in a `ready
conditions', so the test can be done
nice.

GEOTECHNICAL INSTRUMENTATION:
INCLINOMETER PIEZOMETER WATER STAND PIPE OBSERVATION WELL SETTLEMENT GAUGES

FOUNDATION TESTING:
STATIC LOAD TEST (INSTRUMENTED WITH VWSG) DYNAMIC LOAD TEST (PDA+CAPWAP)
PILE INTEGRITY TEST (PIT) CROSSHOLE SONIC LOGGING
THERMAL INTEGRITY PROFILING (TIP)

ENVIRONMENT MONITORING:
VIBRATION MONITORING TILTMETER CRACKMETER
Ge tech EFATHAMA
Jl. Sunter Agung Niaga VI blok G6 no 40-41
Sunter Podomoro, Indonesia 14350
Telp. +62-21-293A1 P56721/22 Fax. +62-21-293A1 P56720
www.geotech-indonesia.com
H GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GE

Sesudah persiapan, pengujian dilakukan After preparation, testing will conducted on


dengan menjatuhkan palu ke kepala tiang pile by struck the pile head using proper
hingga diperoleh energi yang cukup dan hammer until sufficient energy and
tegangan tidak terlampaui agar kepala tiang maximum pile stresses reached without
tidak rusak. Saat pemukulan, beberapa breaking the pile. During the driving, some
variable tiang uji termonitor, seperti variable related to the test pile are
kapasitas tiang, energi, penurunan, maupun monitored, such as bearing capacity, elastic
integritas tiang. Setelah pengujian PDA settlement, integrity, etc. After PDA test
dilaksanakan, dilakukan analisa lebih lanjut conducted, analyzing done by CAPWAP
dengan CAPWAP untuk memperoleh load program to simulate the load transfer in
transfer tiang dan perilaku tanah pile and soil behavior, friction and end-
disekelilingnya, kapasitas friksi dan ujung bearing capacity, elastic and net settlement.
tiang, tegangan tekan dan tarik sepanjang
tiang serta penurunan tiang.

GEOTECHNICAL INSTRUMENTATION:
INCLINOMETER PIEZOMETER WATER STAND PIPE OBSERVATION WELL SETTLEMENT GAUGES

FOUNDATION TESTING:
STATIC LOAD TEST (INSTRUMENTED WITH VWSG) DYNAMIC LOAD TEST (PDA+CAPWAP)
PILE INTEGRITY TEST (PIT) CROSSHOLE SONIC LOGGING
THERMAL INTEGRITY PROFILING (TIP)

ENVIRONMENT MONITORING:
VIBRATION MONITORING TILTMETER CRACKMETER
Ge tech EFATHAMA
Jl. Sunter Agung Niaga VI blok G6 no 40-41
Sunter Podomoro, Indonesia 14350
Telp. +62-21-293A1 P56721/22 Fax. +62-21-293A1 P56720
www.geotech-indonesia.com
H GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GE

III. MONITORING TIANG UJI / TEST PILE MO NITORING

Pengujian PDA dapat memberi hasil berupa The advantages of PDA test is able to show
tegangan tekan maupun tarik maksimum yang several parameters, such as: Compression
terjadi pada tiang uji. Nilai tegangan tekan Stress (CSX) and Tension Stress (TXS).
yang terjadi (CSX) merupakan suatu This parameters are used to measure the
indikator besar tegangan tekan yang terjadi di indication of compression and tension stress
kepala tiang; dan nilai tegangan tarik yang consist from the hammer impact to the pile
terjadi (TSX) merupakan suatu indikator head. Otherwise, integrity value of pile
tegangan tarik yang terjadi saat pengujian (BTA) and length to damage (LTD) can be
dilakukan. Nilai integritas tiang uji (BTA) measured from PDA test; 100% means
dalam persen dan lokasi kerusakan (LTD) perfect condition of pile integrity.
juga dapat diperkirakan dari hasil PDA; nilai
100 memberikan indikasi keutuhan tiang uji
yang bagus.

Data tegangan dan integritas tiang kami Stress data and pile integrity can seen at table
sajikan dalam Tabel 2 berikut ini: 2 below:

CAPWAP
No Tiang
Pile No CSX TSX BTA LTD
(MPa) (MPa) (%) (m)

TOWER 2 NO 17 14.4 4.6 66.0 4.7

TOWER 2 NO 109 16.5 3.2 61.0 3.2

TOWER 2 NO 245 15.0 2.2 6.0 17.7

TOWER 2 NO 319 14.8 4.3 57.0 5.5

TOWER 2 NO 503 16.4 5.5 62.0 4.6

TOWER 3 NO 9 16.8 2.8 45.0 23.5

TOWER 3 NO 81 13.1 3.6 67.0 9.8

TOWER 3 NO 82 19.3 4.5 90.0 21.7

TOWER 3 NO 282 18.1 4.2 77.0 9.9

TOWER 3 NO 502 10.1 4.5 100.0 0.0

GEOTECHNICAL INSTRUMENTATION:
INCLINOMETER PIEZOMETER WATER STAND PIPE OBSERVATION WELL SETTLEMENT GAUGES

FOUNDATION TESTING:
STATIC LOAD TEST (INSTRUMENTED WITH VWSG) DYNAMIC LOAD TEST (PDA+CAPWAP)
PILE INTEGRITY TEST (PIT) CROSSHOLE SONIC LOGGING
THERMAL INTEGRITY PROFILING (TIP)

ENVIRONMENT MONITORING:
VIBRATION MONITORING TILTMETER CRACKMETER
Ge tech EFATHAMA
Jl. Sunter Agung Niaga VI blok G6 no 40-41
Sunter Podomoro, Indonesia 14350
Telp. +62-21-293A1 P56721/22 Fax. +62-21-293A1 P56720
www.geotech-indonesia.com
H GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GE

IV. DISKUSI / DISCUSSION

Hasil analisa CAPWAP kami diskusikan Result of CAPWAP Analysis is presented


dibawah ini, dengan hasil selengkapnya below with completed analysis result is
dapat dilihat pada Lampiran A : presented in Appendix A:

TOWER 2 NO 17 TOWER 2 NO 17
Nomor Tiang TOWER 2 NO 17 (Square Pile The pile TOWER 2 NO 17 (Square Pile 40 X
40 X 40 cm, L = 30.6 m Panjang Penetrasi 40 cm, L = 30.6 m - penetrate 29.6 m) shows
29.6 m) Hasil analisa menunjukkan kapasitas a pile capacity result of about 190.8 tons,
tiang uji (bearing capacity) sebesar 190.8 consist of 143.3 tons of shaft friction and
Ton dengan tahanan friksi sebesar 143.3 Ton 47.5 tons of end-bearing capacity. The total
dan tahanan ujung sebesar 47.5 Ton; and residual settlement is 16.0 mm and 2.0
Penurunan total sebesar 16.0 mm dengan mm, respectively.
penurunan tetap sebesar 2.0 mm.

TOWER 2 NO 109 TOWER 2 NO 109


Nomor Tiang TOWER 2 NO 109 (Square The pile TOWER 2 NO 109 (Square Pile 40
Pile 40 X 40 cm, L = 30.6 m Panjang X 40 cm, L = 30.6 m - penetrate 29.6 m)
Penetrasi 29.6 m) Hasil analisa menunjukkan shows a pile capacity result of about 166.5
kapasitas tiang uji (bearing capacity) sebesar tons, consist of 122.0 tons of shaft friction
166.5 Ton dengan tahanan friksi sebesar and 44.5 tons of end-bearing capacity. The
122.0 Ton dan tahanan ujung sebesar 44.5 total and residual settlement is 16.6 mm and
Ton; Penurunan total sebesar 16.6 mm 0.9 mm, respectively.
dengan penurunan tetap sebesar 0.9 mm.

TOWER 2 NO 245 TOWER 2 NO 245


Nomor Tiang TOWER 2 NO 245 (Square The pile TOWER 2 NO 245 (Square Pile 40
Pile 40 X 40 cm, L = 28.7 m Panjang X 40 cm, L = 28.7 m - penetrate 27.7 m)
Penetrasi 27.7 m) Hasil analisa menunjukkan shows a pile capacity result of about 109.2
kapasitas tiang uji (bearing capacity) sebesar tons, consist of 64.5 tons of shaft friction and
109.2 Ton dengan tahanan friksi sebesar 64.5 44.7 tons of end-bearing capacity. The total
Ton dan tahanan ujung sebesar 44.7 Ton; and residual settlement is 13.4 mm and 3.4
Penurunan total sebesar 13.4 mm dengan mm, respectively.
penurunan tetap sebesar 3.4 mm.

GEOTECHNICAL INSTRUMENTATION:
INCLINOMETER PIEZOMETER WATER STAND PIPE OBSERVATION WELL SETTLEMENT GAUGES

FOUNDATION TESTING:
STATIC LOAD TEST (INSTRUMENTED WITH VWSG) DYNAMIC LOAD TEST (PDA+CAPWAP)
PILE INTEGRITY TEST (PIT) CROSSHOLE SONIC LOGGING
THERMAL INTEGRITY PROFILING (TIP)

ENVIRONMENT MONITORING:
VIBRATION MONITORING TILTMETER CRACKMETER
Ge tech EFATHAMA
Jl. Sunter Agung Niaga VI blok G6 no 40-41
Sunter Podomoro, Indonesia 14350
Telp. +62-21-293A1 P56721/22 Fax. +62-21-293A1 P56720
www.geotech-indonesia.com
H GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GE

TOWER 2 NO 319 TOWER 2 NO 319


Nomor Tiang TOWER 2 NO 319 (Square The pile TOWER 2 NO 319 (Square Pile 40
Pile 40 X 40 cm, L = 30.3 m Panjang X 40 cm, L = 30.3 m - penetrate 29.5 m)
Penetrasi 29.5 m) Hasil analisa menunjukkan shows a pile capacity result of about 191.9
kapasitas tiang uji (bearing capacity) sebesar tons, consist of 137.9 tons of shaft friction
191.9 Ton dengan tahanan friksi sebesar and 54.0 tons of end-bearing capacity. The
137.9 Ton dan tahanan ujung sebesar 54.0 total and residual settlement is 20.4 mm and
Ton; Penurunan total sebesar 20.4 mm 2.0 mm, respectively.
dengan penurunan tetap sebesar 2.0 mm.

TOWER 2 NO 503 TOWER 2 NO 503


Nomor Tiang TOWER 2 NO 503 (Square The pile TOWER 2 NO 503 (Square Pile 40
Pile 40 X 40 cm, L = 30.2 m Panjang X 40 cm, L = 30.2 m - penetrate 29.3 m)
Penetrasi 29.3 m) Hasil analisa menunjukkan shows a pile capacity result of about 189.4
kapasitas tiang uji (bearing capacity) sebesar tons, consist of 132.4 tons of shaft friction
189.4 Ton dengan tahanan friksi sebesar and 56.9 tons of end-bearing capacity. The
132.4 Ton dan tahanan ujung sebesar 56.9 total and residual settlement is 16.1 mm and
Ton; Penurunan total sebesar 16.1 mm 0.3 mm, respectively.
dengan penurunan tetap sebesar 0.3 mm.

TOWER 3 NO 9 TOWER 3 NO 9
Nomor Tiang TOWER 3 NO 9 (Square Pile The pile TOWER 3 NO 9 (Square Pile 40 X
40 X 40 cm, L = 34.5 m Panjang Penetrasi 40 cm, L = 34.5 m - penetrate 33.7 m) shows
33.7 m) Hasil analisa menunjukkan kapasitas a pile capacity result of about 106.5 tons,
tiang uji (bearing capacity) sebesar 106.5 consist of 62.7 tons of shaft friction and 43.8
Ton dengan tahanan friksi sebesar 62.7 Ton tons of end-bearing capacity. The total and
dan tahanan ujung sebesar 43.8 Ton; residual settlement is 18.3 mm and 3.9 mm,
Penurunan total sebesar 18.3 mm dengan respectively.
penurunan tetap sebesar 3.9 mm.

TOWER 3 NO 81 TOWER 3 NO 81
Nomor Tiang TOWER 3 NO 81 (Square Pile The pile TOWER 3 NO 81 (Square Pile 40 X
40 X 40 cm, L = 35.0 m Panjang Penetrasi 40 cm, L = 35.0 m - penetrate 34.2 m) shows
34.2 m) Hasil analisa menunjukkan kapasitas a pile capacity result of about 182.2 tons,
tiang uji (bearing capacity) sebesar 182.2 consist of 117.0 tons of shaft friction and
Ton dengan tahanan friksi sebesar 117.0 Ton 65.2 tons of end-bearing capacity. The total
dan tahanan ujung sebesar 65.2 Ton; and residual settlement is 15.8 mm and 1.0
Penurunan total sebesar 15.8 mm dengan mm, respectively.
penurunan tetap sebesar 1.0 mm.

GEOTECHNICAL INSTRUMENTATION:
INCLINOMETER PIEZOMETER WATER STAND PIPE OBSERVATION WELL SETTLEMENT GAUGES

FOUNDATION TESTING:
STATIC LOAD TEST (INSTRUMENTED WITH VWSG) DYNAMIC LOAD TEST (PDA+CAPWAP)
PILE INTEGRITY TEST (PIT) CROSSHOLE SONIC LOGGING
THERMAL INTEGRITY PROFILING (TIP)

ENVIRONMENT MONITORING:
VIBRATION MONITORING TILTMETER CRACKMETER
Ge tech EFATHAMA
Jl. Sunter Agung Niaga VI blok G6 no 40-41
Sunter Podomoro, Indonesia 14350
Telp. +62-21-293A1 P56721/22 Fax. +62-21-293A1 P56720
www.geotech-indonesia.com
H GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GE

TOWER 3 NO 82 TOWER 3 NO 82
Nomor Tiang TOWER 3 NO 82 (Square Pile The pile TOWER 3 NO 82 (Square Pile 40 X
40 X 40 cm, L = 35.0 m Panjang Penetrasi 40 cm, L = 35.0 m - penetrate 34.0 m) shows
34.0 m) Hasil analisa menunjukkan kapasitas a pile capacity result of about 177.0 tons,
tiang uji (bearing capacity) sebesar 177.0 consist of 134.6 tons of shaft friction and
Ton dengan tahanan friksi sebesar 134.6 Ton 42.4 tons of end-bearing capacity. The total
dan tahanan ujung sebesar 42.4 Ton; and residual settlement is 20.3 mm and 3.0
Penurunan total sebesar 20.3 mm dengan mm, respectively.
penurunan tetap sebesar 3.0 mm.

TOWER 3 NO 282 TOWER 3 NO 282


Nomor Tiang TOWER 3 NO 282 (Square The pile TOWER 3 NO 282 (Square Pile 40
Pile 40 X 40 cm, L = 34.7 m Panjang X 40 cm, L = 34.7 m - penetrate 33.6 m)
Penetrasi 33.6 m) Hasil analisa menunjukkan shows a pile capacity result of about 190.5
kapasitas tiang uji (bearing capacity) sebesar tons, consist of 118.8 tons of shaft friction
190.5 Ton dengan tahanan friksi sebesar and 71.7 tons of end-bearing capacity. The
118.8 Ton dan tahanan ujung sebesar 71.7 total and residual settlement is 18.7 mm and
Ton; Penurunan total sebesar 18.7 mm 1.0 mm, respectively.
dengan penurunan tetap sebesar 1.0 mm.

TOWER 3 NO 502 TOWER 3 NO 502


Nomor Tiang TOWER 3 NO 502 (Square The pile TOWER 3 NO 502 (Square Pile 40
Pile 40 X 40 cm, L = 34.5 m Panjang X 40 cm, L = 34.5 m - penetrate 33.7 m)
Penetrasi 33.7 m) Hasil analisa menunjukkan shows a pile capacity result of about 161.2
kapasitas tiang uji (bearing capacity) sebesar tons, consist of 99.2 tons of shaft friction and
161.2 Ton dengan tahanan friksi sebesar 99.2 62.0 tons of end-bearing capacity. The total
Ton dan tahanan ujung sebesar 62.0 Ton; and residual settlement is 11.2 mm and 0.2
Penurunan total sebesar 11.2 mm dengan mm, respectively.
penurunan tetap sebesar 0.2 mm.

GEOTECHNICAL INSTRUMENTATION:
INCLINOMETER PIEZOMETER WATER STAND PIPE OBSERVATION WELL SETTLEMENT GAUGES

FOUNDATION TESTING:
STATIC LOAD TEST (INSTRUMENTED WITH VWSG) DYNAMIC LOAD TEST (PDA+CAPWAP)
PILE INTEGRITY TEST (PIT) CROSSHOLE SONIC LOGGING
THERMAL INTEGRITY PROFILING (TIP)

ENVIRONMENT MONITORING:
VIBRATION MONITORING TILTMETER CRACKMETER
Ge tech EFATHAMA
Jl. Sunter Agung Niaga VI blok G6 no 40-41
Sunter Podomoro, Indonesia 14350
Telp. +62-21-293A1 P56721/22 Fax. +62-21-293A1 P56720
www.geotech-indonesia.com
H GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GE

TABLE II
CAPWAP RESULTS SUMMARIES

CAPWAP
No Tiang
Daya Dukung Total Daya Dukung Friksi Daya Dukung Ujung Penurunan
Pile No
Pile Resistance Skin Friction End-bearing Settlement
(Ton) (Ton) (Ton) (mm)

TOWER 2 NO 17 190.8 143.3 47.5 16.0

TOWER 2 NO 109 166.5 122.0 44.5 16.6

TOWER 2 NO 245 109.2 64.5 44.7 13.4

TOWER 2 NO 319 191.9 137.9 54.0 20.4

TOWER 2 NO 503 189.4 132.4 56.9 16.1

TOWER 3 NO 9 106.5 62.7 43.8 18.3

TOWER 3 NO 81 182.2 117.0 65.2 15.8

TOWER 3 NO 82 177.0 134.6 42.4 20.3

TOWER 3 NO 282 190.5 118.8 71.7 18.7

TOWER 3 NO 502 161.2 99.2 62.0 11.2

GEOTECHNICAL INSTRUMENTATION:
INCLINOMETER PIEZOMETER WATER STAND PIPE OBSERVATION WELL SETTLEMENT GAUGES

FOUNDATION TESTING:
STATIC LOAD TEST (INSTRUMENTED WITH VWSG) DYNAMIC LOAD TEST (PDA+CAPWAP)
PILE INTEGRITY TEST (PIT) CROSSHOLE SONIC LOGGING
THERMAL INTEGRITY PROFILING (TIP)

ENVIRONMENT MONITORING:
VIBRATION MONITORING TILTMETER CRACKMETER
Ge tech EFATHAMA
Jl. Sunter Agung Niaga VI blok G6 no 40-41
Sunter Podomoro, Indonesia 14350
Telp. +62-21-293A1 P56721/22 Fax. +62-21-293A1 P56720
www.geotech-indonesia.com
H GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GE

GAMBAR / FIGURE
Denah Pondasi / Site Plan

GEOTECHNICAL INSTRUMENTATION:
INCLINOMETER PIEZOMETER WATER STAND PIPE OBSERVATION WELL SETTLEMENT GAUGES

FOUNDATION TESTING:
STATIC LOAD TEST (INSTRUMENTED WITH VWSG) DYNAMIC LOAD TEST (PDA+CAPWAP)
PILE INTEGRITY TEST (PIT) CROSSHOLE SONIC LOGGING
THERMAL INTEGRITY PROFILING (TIP)

ENVIRONMENT MONITORING:
VIBRATION MONITORING TILTMETER CRACKMETER
Ge tech EFATHAMA
Jl. Sunter Agung Niaga VI blok G6 no 40-41
Sunter Podomoro, Indonesia 14350
Telp. +62-21-293A1 P56721/22 Fax. +62-21-293A1 P56720
www.geotech-indonesia.com
H GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GE

LAMPIRAN A / APPENDIX A
(10) Data PDA & CAPWAP Analysis

GEOTECHNICAL INSTRUMENTATION:
INCLINOMETER PIEZOMETER WATER STAND PIPE OBSERVATION WELL SETTLEMENT GAUGES

FOUNDATION TESTING:
STATIC LOAD TEST (INSTRUMENTED WITH VWSG) DYNAMIC LOAD TEST (PDA+CAPWAP)
PILE INTEGRITY TEST (PIT) CROSSHOLE SONIC LOGGING
THERMAL INTEGRITY PROFILING (TIP)

ENVIRONMENT MONITORING:
VIBRATION MONITORING TILTMETER CRACKMETER
RUSUNAMI WISMA ATLET; Pile: TOWER 2 NO 17; SQUARE 40 DROP 3T; Blow: 3 (Test: 16-Feb-2017 09:18:) 20-Feb-2017
PT Geotech Alfabetha CAPWAP(R) 2006-3

950 tons 950 tons


Force Msd Force Msd
Force Cpt Velocity Msd

713 713

475 475

238 238

5 105 ms 5 105 ms
0 0
10 L/c 10 L/c

-238 -238

Pile
-475 -475

Load (tons) 15.0


Pile Top
Bottom Shaft Resistance
0 40 80 120 160 200
0.0 12.0 Distribution

9.0

Ru = 190.8 tons

tons/m
Rs = 143.3 tons 6.0
5.0 Rb = 47.5 tons
Dy = 14.0 mm 3.0
Dx = 16.0 mm
00
Pile Force
10.0
40 at Ru

80

Displacement (mm)
tons

15.0 120

160

200
20.0

CAPWAP(R) 2006-3 Licensed to PT Geotech Alfabetha


RUSUNAMI WISMA ATLET; Pile: TOWER 2 NO 17 Test: 16-Feb-2017 09:18:
SQUARE 40 DROP 3T; Blow: 3 CAPWAP(R) 2006-3
PT Geotech Alfabetha OP: Y2

CAPWAP SUMMARY RESULTS


Total CAPWAP Capacity: 190.8; along Shaft 143.3; at Toe 47.5 tons
Soil Dist. Depth Ru Force Sum Unit Unit Smith Quake
Sgmnt Below Below in Pile of Resist. Resist. Damping
No. Gages Grade Ru (Depth) (Area) Factor
m m tons tons tons tons/m tons/m2 s/m mm

190.8
1 3.1 2.9 0.6 190.2 0.6 0.20 0.13 1.313 4.537
2 5.1 4.9 0.7 189.5 1.3 0.36 0.23 1.313 4.537
3 7.2 7.0 1.7 187.8 3.1 0.85 0.53 1.313 4.537
4 9.2 9.0 4.4 183.4 7.4 2.12 1.33 1.313 4.537
5 11.3 11.1 5.2 178.2 12.6 2.52 1.57 1.313 4.537
6 13.4 13.2 6.5 171.7 19.1 3.18 1.99 1.313 4.537
7 15.4 15.2 5.5 166.2 24.7 2.70 1.68 1.313 4.537
8 17.5 17.3 5.8 160.4 30.4 2.81 1.75 1.313 4.537
9 19.5 19.3 6.1 154.3 36.5 2.97 1.86 1.313 4.537
10 21.6 21.4 9.5 144.8 46.0 4.61 2.88 1.313 4.537
11 23.6 23.4 19.1 125.8 65.1 9.27 5.79 1.313 4.537
12 25.7 25.5 28.6 97.2 93.7 13.91 8.69 1.313 4.537
13 27.7 27.5 28.4 68.7 122.1 13.83 8.64 1.313 4.537
14 29.8 29.6 21.3 47.5 143.3 10.34 6.47 1.313 4.353
Avg. Shaft 10.2 4.84 3.03 1.313 4.510
Toe 47.5 296.75 1.313 3.608
Soil Model Parameters/Extensions Shaft Toe
Case Damping Factor 1.264 0.419
Reloading Level (% of Ru) 100 100

CASE METHOD
J = 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
RP 308.6 292.9 277.3 261.6 246.0 230.3 214.7 199.0 183.4 167.8
RX 318.3 300.6 282.9 265.2 247.5 230.3 214.7 199.0 183.4 167.8
RU 352.2 340.9 329.6 318.3 307.0 295.8 284.5 273.2 261.9 250.6
RAU = 81.7 (tons); RA2 = 185.8 (tons)
Current CAPWAP Ru = 190.8 (tons); Corresponding J(RP)= 0.75; J(RX) = 0.75

VMX TVP VT1*Z FT1 FMX DMX DFN SET EMX QUS
m/s ms tons tons tons mm mm mm tonne-m tons
1.95 24.32 230.7 234.4 235.4 10.688 2.015 2.000 2.1 328.5

Page 1 Analysis: 20-Feb-2017


RUSUNAMI WISMA ATLET; Pile: TOWER 2 NO 17 Test: 16-Feb-2017 09:18:
SQUARE 40 DROP 3T; Blow: 3 CAPWAP(R) 2006-3
PT Geotech Alfabetha OP: Y2

PILE PROFILE AND PILE MODEL


Depth Area E-Modulus Spec. Weight Perim.
m cm2 tons/cm2 tons/m3 m
0.00 1600.00 354.0 2.400 1.600
29.80 1600.00 354.0 2.400 1.600
Toe Area 0.160 m2

Segmnt Dist. Impedance Imped. Tension Compression Perim.


Number B.G. Change Slack Eff. Slack Eff.
m tons/m/s % mm mm m

1 1.03 148.92 0.00 0.000 0.000 -0.000 0.000 1.600


6 6.17 55.00 -63.07 0.000 0.000 -0.000 0.000 1.600
7 7.19 148.92 0.00 0.000 0.000 -0.000 0.000 1.600
29 29.80 148.92 0.00 0.000 0.000 -0.000 0.000 1.600
Pile Damping 2.0 %, Time Incr 0.270 ms, Wave Speed 3803.3 m/s, 2L/c 15.7 ms

Page 2 Analysis: 20-Feb-2017


Geotech Engineering
RUSUNAMI WISMA ATLET PILE DRIVING ANALYZER
PDA OP: Y2 Version 2016.125
TOWER 2 NO 109
SQUARE 40 DROP 3T
BN 5
2/16/2017 2:06:48 PM
1000 6.71 RMX 174 tn
tn m/s RSU 222 tn
EMX 2.13 tn-m
F V CSX 16.5 MPa
TSX 3.2 MPa
LTD 3.2 m
DFN 1 mm
DMX 11 mm
BTA 61.0 (%)

LE 29.8 m
AR 1600.00 cm^2
EM 354 t/cm2
102.4ms
SP 2.40 t/m3
15.70 ms WS 3803.3 m/s
EA/C 148.9 tn-s/m
1000 1000 LP 29.6 m
tn tn
F12 A12
WD WU
F1: [N750] 153.2 (0.975)
F2: [C 343] 99.1 (0.975)
A1: [42400] 1155 g's/v (1.025)
A2: [42399] 1168 g's/v (1.025)

102.4ms
RUSUNAMI WISMA ATLET; Pile: TOWER 2 NO 109; SQUARE 40 DROP 3T; Blow: 5 (Test: 16-Feb-2017 14:06:) 20-Feb-2017
PT Geotech Alfabetha CAPWAP(R) 2006-3

950 tons 950 tons


Force Msd Force Msd
Force Cpt Velocity Msd

713 713

475 475

238 238

5 105 ms 5 105 ms
0 0
10 L/c 10 L/c

-238 -238

Pile
-475 -475

Load (tons) 15.0


Pile Top
Bottom Shaft Resistance
0 40 80 120 160 200
0.0 12.0 Distribution

9.0

Ru = 166.5 tons

tons/m
Rs = 122.0 tons 6.0
5.0 Rb = 44.5 tons
Dy = 15.6 mm 3.0
Dx = 16.6 mm
00
Pile Force
10.0
40 at Ru

80

Displacement (mm)
tons

15.0 120

160

200
20.0

CAPWAP(R) 2006-3 Licensed to PT Geotech Alfabetha


RUSUNAMI WISMA ATLET; Pile: TOWER 2 NO 109 Test: 16-Feb-2017 14:06:
SQUARE 40 DROP 3T; Blow: 5 CAPWAP(R) 2006-3
PT Geotech Alfabetha OP: Y2

CAPWAP SUMMARY RESULTS


Total CAPWAP Capacity: 166.5; along Shaft 122.0; at Toe 44.5 tons
Soil Dist. Depth Ru Force Sum Unit Unit Smith Quake
Sgmnt Below Below in Pile of Resist. Resist. Damping
No. Gages Grade Ru (Depth) (Area) Factor
m m tons tons tons tons/m tons/m2 s/m mm

166.5
1 3.1 2.9 0.2 166.3 0.2 0.07 0.04 1.025 7.064
2 5.1 4.9 0.3 166.0 0.5 0.13 0.08 1.025 7.065
3 7.2 7.0 1.9 164.2 2.3 0.91 0.57 1.025 7.065
4 9.2 9.0 6.2 158.0 8.5 3.02 1.89 1.025 7.065
5 11.3 11.1 8.4 149.6 16.9 4.10 2.56 1.025 7.065
6 13.4 13.2 5.7 143.8 22.7 2.78 1.74 1.025 7.065
7 15.4 15.2 3.3 140.5 26.0 1.60 1.00 1.025 7.065
8 17.5 17.3 3.9 136.6 29.9 1.90 1.19 1.025 7.065
9 19.5 19.3 5.3 131.3 35.2 2.59 1.62 1.025 7.065
10 21.6 21.4 9.7 121.7 44.8 4.70 2.93 1.025 7.065
11 23.6 23.4 17.6 104.1 62.4 8.54 5.34 1.025 7.065
12 25.7 25.5 19.4 84.7 81.8 9.46 5.91 1.025 6.901
13 27.7 27.5 20.6 64.0 102.5 10.04 6.28 1.025 6.660
14 29.8 29.6 19.5 44.5 122.0 9.50 5.94 1.025 6.440
Avg. Shaft 8.7 4.12 2.58 1.025 6.870
Toe 44.5 278.13 1.313 6.374
Soil Model Parameters/Extensions Shaft Toe
Case Damping Factor 0.840 0.392
Unloading Quake (% of loading quake) 97 100
Reloading Level (% of Ru) 100 100
Unloading Level (% of Ru) 78

CASE METHOD
J = 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
RP 310.7 287.9 265.1 242.4 219.6 196.8 174.0 151.3 128.5 105.7
RX 310.7 287.9 265.1 242.4 219.6 196.8 174.0 151.3 128.5 105.7
RU 340.6 320.8 301.0 281.2 261.4 241.6 221.8 202.0 182.3 162.5
RAU = 87.6 (tons); RA2 = 132.4 (tons)
Current CAPWAP Ru = 166.5 (tons); Corresponding J(RP)= 0.63; J(RX) = 0.63

VMX TVP VT1*Z FT1 FMX DMX DFN SET EMX QUS
m/s ms tons tons tons mm mm mm tonne-m tons
2.15 24.05 270.9 267.5 268.5 11.112 0.951 1.000 2.1 351.1

Page 1 Analysis: 20-Feb-2017


RUSUNAMI WISMA ATLET; Pile: TOWER 2 NO 109 Test: 16-Feb-2017 14:06:
SQUARE 40 DROP 3T; Blow: 5 CAPWAP(R) 2006-3
PT Geotech Alfabetha OP: Y2

PILE PROFILE AND PILE MODEL


Depth Area E-Modulus Spec. Weight Perim.
m cm2 tons/cm2 tons/m3 m
0.00 1600.00 354.0 2.400 1.600
29.80 1600.00 354.0 2.400 1.600
Toe Area 0.160 m2

Segmnt Dist. Impedance Imped. Tension Compression Perim.


Number B.G. Change Slack Eff. Slack Eff.
m tons/m/s % mm mm m

1 1.03 148.92 0.00 0.000 0.000 -0.000 0.000 1.600


6 6.17 50.00 -66.42 0.000 0.000 -0.000 0.000 1.600
7 7.19 148.92 0.00 0.000 0.000 -0.000 0.000 1.600
29 29.80 148.92 0.00 0.000 0.000 -0.000 0.000 1.600
Pile Damping 2.0 %, Time Incr 0.270 ms, Wave Speed 3803.3 m/s, 2L/c 15.7 ms

Page 2 Analysis: 20-Feb-2017


Geotech Engineering
RUSUNAMI WISMA ATLET PILE DRIVING ANALYZER
PDA OP: Y2 Version 2016.125
TOWER 2 NO 245
SQUARE 40 DROP 3T
BN 2
2/17/2017 8:20:09 AM
800 5.37 RMX 106 tn
tn m/s RSU 50 tn
EMX 1.66 tn-m
F V CSX 15.0 MPa
TSX 2.2 MPa
LTD 17.7 m
DFN 3 mm
DMX 12 mm
BTA 6.0 (%)

LE 27.9 m
AR 1600.00 cm^2
EM 354 t/cm2
102.4ms
SP 2.40 t/m3
14.70 ms WS 3803.3 m/s
EA/C 148.9 tn-s/m
800 800 LP 27.7 m
tn tn
F12 A12
WD WU
F1: [N750] 153.2 (1.15)
F2: [C 343] 99.1 (1.15)
A1: [42400] 1155 g's/v (0.85)
A2: [42399] 1168 g's/v (0.85)

102.4ms
RUSUNAMI WISMA ATLET; Pile: TOWER 2 NO 245; SQUARE 40 DROP 3T; Blow: 2 (Test: 17-Feb-2017 08:20:) 20-Feb-2017
PT Geotech Alfabetha CAPWAP(R) 2006-3

950 tons 950 tons


Force Msd Force Msd
Force Cpt Velocity Msd

713 713

475 475

238 238

5 105 ms 5 105 ms
0 0
11 L/c 11 L/c

-238 -238

Pile
-475 -475

Load (tons) 8.0


Pile Top
Bottom Shaft Resistance
0 24 48 72 96 120
0.0 6.4 Distribution

4.8

Ru = 109.2 tons

tons/m
Rs = 64.5 tons 3.2
4.0 Rb = 44.7 tons
Dy = 9.8 mm 1.6
Dx = 13.4 mm
00
Pile Force
8.0
24 at Ru

48

Displacement (mm)
tons

12.0 72

96

120
16.0

CAPWAP(R) 2006-3 Licensed to PT Geotech Alfabetha


RUSUNAMI WISMA ATLET; Pile: TOWER 2 NO 245 Test: 17-Feb-2017 08:20:
SQUARE 40 DROP 3T; Blow: 2 CAPWAP(R) 2006-3
PT Geotech Alfabetha OP: Y2

CAPWAP SUMMARY RESULTS


Total CAPWAP Capacity: 109.2; along Shaft 64.5; at Toe 44.7 tons
Soil Dist. Depth Ru Force Sum Unit Unit Smith
Sgmnt Below Below in Pile of Resist. Resist. Damping
No. Gages Grade Ru (Depth) (Area) Factor
m m tons tons tons tons/m tons/m2 s/m

109.2
1 3.1 2.9 1.6 107.5 1.6 0.57 0.35 1.136
2 5.2 5.0 3.1 104.4 4.7 1.50 0.94 1.136
3 7.2 7.0 5.7 98.7 10.5 2.77 1.73 1.136
4 9.3 9.1 6.8 91.8 17.3 3.31 2.07 1.136
5 11.4 11.2 9.9 81.9 27.2 4.80 3.00 1.136
6 13.4 13.2 10.5 71.4 37.7 5.08 3.17 1.136
7 15.5 15.3 9.6 61.8 47.3 4.65 2.91 1.136
8 17.6 17.4 8.1 53.8 55.4 3.91 2.44 1.136
9 19.6 19.4 4.6 49.1 60.0 2.23 1.39 1.136
10 21.7 21.5 2.0 47.2 62.0 0.95 0.59 1.136
11 23.8 23.6 1.3 45.9 63.3 0.63 0.40 1.136
12 25.8 25.6 0.7 45.2 63.9 0.32 0.20 1.136
13 27.9 27.7 0.5 44.7 64.5 0.26 0.16 1.136
Avg. Shaft 5.0 2.33 1.45 1.136
Toe 44.7 279.31 1.264
Soil Model Parameters/Extensions Shaft Toe
Quake (mm) 1.601 4.657
Case Damping Factor 0.492 0.379
Damping Type Smith Smith
Unloading Quake (% of loading quake) 30 36
Reloading Level (% of Ru) 100 100
Unloading Level (% of Ru) 25

CASE METHOD
J = 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
RP 195.7 171.4 147.2 123.0 98.7 74.5 50.3 26.0 1.8 0.0
RX 217.6 198.4 179.5 160.7 142.2 123.8 106.1 89.6 74.7 70.1
RU 195.7 171.4 147.2 123.0 98.7 74.5 50.3 26.0 1.8 0.0
RAU = 48.1 (tons); RA2 = 168.2 (tons)
Current CAPWAP Ru = 109.2 (tons); Corresponding J(RP)= 0.36; J(RX) = 0.58

VMX TVP VT1*Z FT1 FMX DMX DFN SET EMX QUS
m/s ms tons tons tons mm mm mm tonne-m tons
1.47 22.82 219.6 218.3 244.6 12.225 3.379 3.600 1.7 209.9

Page 1 Analysis: 20-Feb-2017


RUSUNAMI WISMA ATLET; Pile: TOWER 2 NO 245 Test: 17-Feb-2017 08:20:
SQUARE 40 DROP 3T; Blow: 2 CAPWAP(R) 2006-3
PT Geotech Alfabetha OP: Y2

PILE PROFILE AND PILE MODEL


Depth Area E-Modulus Spec. Weight Perim.
m cm2 tons/cm2 tons/m3 m
0.00 1600.00 354.0 2.400 1.600
27.90 1600.00 354.0 2.400 1.600
Toe Area 0.160 m2

Segmnt Dist. Impedance Imped. Tension Compression Perim.


Number B.G. Change Slack Eff. Slack Eff.
m tons/m/s % mm mm m

1 1.03 148.92 0.00 0.000 0.000 -0.000 0.000 1.600


17 17.57 50.00 -66.42 0.000 0.000 -0.000 0.000 1.600
18 18.60 148.92 0.00 0.000 0.000 -1.000 1.000 1.600
19 19.63 148.92 0.00 0.000 0.000 -0.000 0.000 1.600
27 27.90 148.92 0.00 0.000 0.000 -0.000 0.000 1.600
Pile Damping 2.0 %, Time Incr 0.272 ms, Wave Speed 3803.3 m/s, 2L/c 14.7 ms

Page 2 Analysis: 20-Feb-2017


Geotech Engineering
RUSUNAMI WISMA ATLET PILE DRIVING ANALYZER
PDA OP: Y2 Version 2016.125
TOWER 2 NO 319
SQUARE 40 DROP 3T
BN 3
2/16/2017 3:11:40 PM
1000 6.71 RMX 231 tn
tn m/s RSU 213 tn
EMX 2.99 tn-m
F V CSX 14.8 MPa
TSX 4.3 MPa
LTD 5.5 m
DFN 2 mm
DMX 15 mm
BTA 57.0 (%)

LE 29.7 m
AR 1600.00 cm^2
EM 354 t/cm2
102.4ms
SP 2.40 t/m3
15.60 ms WS 3803.3 m/s
EA/C 148.9 tn-s/m
1000 1000 LP 29.5 m
tn tn
F12 A12
WD WU
F1: [N750] 153.2 (0.95)
F2: [C 343] 99.1 (0.95)
A1: [42400] 1155 g's/v (1.05)
A2: [42399] 1168 g's/v (1.05)

102.4ms
RUSUNAMI WISMA ATLET; Pile: TOWER 2 NO 319; SQUARE 40 DROP 3T; Blow: 3 (Test: 16-Feb-2017 15:11:) 20-Feb-2017
PT Geotech Alfabetha CAPWAP(R) 2006-3

950 tons 950 tons


Force Msd Force Msd
Force Cpt Velocity Msd

713 713

475 475

238 238

5 105 ms 5 105 ms
0 0
10 L/c 10 L/c

-238 -238

Pile
-475 -475

Load (tons) 15.0


Pile Top
Bottom Shaft Resistance
0 40 80 120 160 200
0.0 12.0 Distribution

9.0

Ru = 191.9 tons

tons/m
Rs = 137.9 tons 6.0
7.0 Rb = 54.0 tons
Dy = 18.4 mm 3.0
Dx = 20.4 mm
00
Pile Force
14.0
40 at Ru

80

Displacement (mm)
tons

21.0 120

160

200
28.0

CAPWAP(R) 2006-3 Licensed to PT Geotech Alfabetha


RUSUNAMI WISMA ATLET; Pile: TOWER 2 NO 319 Test: 16-Feb-2017 15:11:
SQUARE 40 DROP 3T; Blow: 3 CAPWAP(R) 2006-3
PT Geotech Alfabetha OP: Y2

CAPWAP SUMMARY RESULTS


Total CAPWAP Capacity: 191.9; along Shaft 137.9; at Toe 54.0 tons
Soil Dist. Depth Ru Force Sum Unit Unit Smith
Sgmnt Below Below in Pile of Resist. Resist. Damping
No. Gages Grade Ru (Depth) (Area) Factor
m m tons tons tons tons/m tons/m2 s/m

191.9
1 3.1 2.9 0.1 191.9 0.1 0.02 0.01 1.035
2 5.1 4.9 0.2 191.7 0.2 0.09 0.06 1.035
3 7.2 7.0 0.5 191.2 0.7 0.23 0.15 1.035
4 9.2 9.0 1.2 190.0 1.9 0.59 0.37 1.035
5 11.3 11.1 5.0 185.1 6.9 2.42 1.51 1.035
6 13.3 13.1 8.9 176.1 15.8 4.37 2.73 1.035
7 15.4 15.2 10.3 165.8 26.1 5.00 3.13 1.035
8 17.4 17.2 8.1 157.7 34.2 3.97 2.48 1.035
9 19.5 19.3 5.4 152.3 39.6 2.63 1.64 1.035
10 21.5 21.3 6.8 145.5 46.5 3.34 2.09 1.035
11 23.6 23.4 15.6 129.9 62.0 7.59 4.74 1.035
12 25.6 25.4 25.8 104.2 87.8 12.57 7.86 1.035
13 27.7 27.5 26.1 78.1 113.8 12.72 7.95 1.035
14 29.7 29.5 24.1 54.0 137.9 11.78 7.36 1.035
Avg. Shaft 9.9 4.68 2.92 1.035
Toe 54.0 337.50 1.313
Soil Model Parameters/Extensions Shaft Toe
Quake (mm) 6.401 7.601
Case Damping Factor 0.959 0.476
Unloading Quake (% of loading quake) 99 92
Reloading Level (% of Ru) 100 100
Unloading Level (% of Ru) 96

CASE METHOD
J = 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
RP 296.8 283.6 270.4 257.2 244.0 230.8 217.7 204.5 191.3 178.1
RX 336.1 318.6 301.2 283.7 266.2 248.8 231.3 213.8 196.9 180.8
RU 294.0 280.5 267.1 253.6 240.1 226.7 213.2 199.7 186.2 172.8
RAU = 117.5 (tons); RA2 = 207.9 (tons)
Current CAPWAP Ru = 191.9 (tons); Corresponding J(RP)= 0.80; J(RX) = 0.83

VMX TVP VT1*Z FT1 FMX DMX DFN SET EMX QUS
m/s ms tons tons tons mm mm mm tonne-m tons
2.01 22.35 214.4 214.3 242.3 14.800 2.000 2.000 3.0 355.6

Page 1 Analysis: 20-Feb-2017


RUSUNAMI WISMA ATLET; Pile: TOWER 2 NO 319 Test: 16-Feb-2017 15:11:
SQUARE 40 DROP 3T; Blow: 3 CAPWAP(R) 2006-3
PT Geotech Alfabetha OP: Y2

PILE PROFILE AND PILE MODEL


Depth Area E-Modulus Spec. Weight Perim.
m cm2 tons/cm2 tons/m3 m
0.00 1600.00 354.0 2.400 1.600
29.70 1600.00 354.0 2.400 1.600
Toe Area 0.160 m2

Segmnt Dist. Impedance Imped. Tension Compression Perim.


Number B.G. Change Slack Eff. Slack Eff.
m tons/m/s % mm mm m

1 1.02 148.92 0.00 0.000 0.000 -0.000 0.000 1.600


7 7.17 50.00 -66.42 0.000 0.000 -0.000 0.000 1.600
8 8.19 148.92 0.00 0.000 0.000 -0.000 0.000 1.600
29 29.70 148.92 0.00 0.000 0.000 -0.000 0.000 1.600
Pile Damping 2.0 %, Time Incr 0.269 ms, Wave Speed 3803.3 m/s, 2L/c 15.6 ms

Page 2 Analysis: 20-Feb-2017


Geotech Engineering
RUSUNAMI WISMA ATLET PILE DRIVING ANALYZER
PDA OP: Y2 Version 2016.125
TOWER 2 NO 503
SQUARE 40 DROP 3T
BN 3
2/17/2017 9:51:58 AM
1000 6.71 RMX 223 tn
tn m/s RSU 356 tn
EMX 2.20 tn-m
F V CSX 16.4 MPa
TSX 5.5 MPa
LTD 4.6 m
DFN 0 mm
DMX 11 mm
BTA 62.0 (%)

LE 29.5 m
AR 1600.00 cm^2
EM 354 t/cm2
102.4ms
SP 2.40 t/m3
15.50 ms WS 3803.3 m/s
EA/C 148.9 tn-s/m
1000 1000 LP 29.3 m
tn tn
F12 A2
WD WU
F1: [N750] 153.2 (1)
F2: [C 343] 99.1 (1)
A2: [42399] 1168 g's/v (1)

102.4ms
RUSUNAMI WISMA ATLET; Pile: TOWER 2 NO 503; SQUARE 40 DROP 3T; Blow: 3 (Test: 17-Feb-2017 09:51:) 20-Feb-2017
PT Geotech Alfabetha CAPWAP(R) 2006-3

950 tons 950 tons


Force Msd Force Msd
Force Cpt Velocity Msd

713 713

475 475

238 238

5 105 ms 5 105 ms
0 0
10 L/c 10 L/c

-238 -238

Pile
-475 -475

Load (tons) 15.0


Pile Top
Bottom Shaft Resistance
0 40 80 120 160 200
0.0 12.0 Distribution

9.0

Ru = 189.4 tons

tons/m
Rs = 132.4 tons 6.0
5.0 Rb = 56.9 tons
Dy = 15.8 mm 3.0
Dx = 16.1 mm
00
Pile Force
10.0
40 at Ru

80

Displacement (mm)
tons

15.0 120

160

200
20.0

CAPWAP(R) 2006-3 Licensed to PT Geotech Alfabetha


RUSUNAMI WISMA ATLET; Pile: TOWER 2 NO 503 Test: 17-Feb-2017 09:51:
SQUARE 40 DROP 3T; Blow: 3 CAPWAP(R) 2006-3
PT Geotech Alfabetha OP: Y2

CAPWAP SUMMARY RESULTS


Total CAPWAP Capacity: 189.4; along Shaft 132.4; at Toe 56.9 tons
Soil Dist. Depth Ru Force Sum Unit Unit Smith Quake
Sgmnt Below Below in Pile of Resist. Resist. Damping
No. Gages Grade Ru (Depth) (Area) Factor
m m tons tons tons tons/m tons/m2 s/m mm

189.4
1 3.1 2.9 1.1 188.3 1.1 0.38 0.24 0.934 6.806
2 5.1 4.9 2.1 186.2 3.2 1.02 0.64 0.934 6.808
3 7.1 6.9 3.9 182.3 7.1 1.92 1.20 0.934 6.808
4 9.2 9.0 4.8 177.5 11.9 2.36 1.48 0.934 6.808
5 11.2 11.0 3.5 174.0 15.4 1.74 1.09 0.934 6.808
6 13.2 13.0 1.9 172.1 17.3 0.94 0.59 0.934 6.808
7 15.3 15.1 2.4 169.7 19.7 1.16 0.73 0.934 6.161
8 17.3 17.1 2.4 167.3 22.1 1.17 0.73 0.934 5.164
9 19.3 19.1 1.8 165.5 23.9 0.90 0.57 0.934 5.130
10 21.4 21.2 21.2 144.3 45.1 10.42 6.51 0.934 5.435
11 23.4 23.2 23.1 121.2 68.2 11.35 7.09 0.934 5.985
12 25.4 25.2 22.7 98.5 90.9 11.17 6.98 0.934 6.103
13 27.5 27.3 21.7 76.8 112.6 10.67 6.67 0.934 5.660
14 29.5 29.3 19.8 57.0 132.4 9.74 6.09 0.934 5.289
Avg. Shaft 9.5 4.52 2.83 0.934 5.844
Toe 56.9 355.94 1.313 5.756
Soil Model Parameters/Extensions Shaft Toe
Case Damping Factor 0.831 0.502
Reloading Level (% of Ru) 100 100
Unloading Level (% of Ru) 30

CASE METHOD
J = 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
RP 348.2 327.3 306.4 285.5 264.6 243.7 222.8 201.9 181.0 160.1
RX 348.2 327.3 306.4 285.5 264.6 243.7 222.8 201.9 181.0 160.1
RU 431.1 418.5 405.9 393.4 380.8 368.2 355.6 343.0 330.4 317.8
RAU = 143.6 (tons); RA2 = 222.1 (tons)
Current CAPWAP Ru = 189.4 (tons); Corresponding J(RP)= 0.76; J(RX) = 0.76

VMX TVP VT1*Z FT1 FMX DMX DFN SET EMX QUS
m/s ms tons tons tons mm mm mm tonne-m tons
2.28 23.80 339.4 217.7 266.9 10.849 0.304 0.300 2.2 394.5

Page 1 Analysis: 20-Feb-2017


RUSUNAMI WISMA ATLET; Pile: TOWER 2 NO 503 Test: 17-Feb-2017 09:51:
SQUARE 40 DROP 3T; Blow: 3 CAPWAP(R) 2006-3
PT Geotech Alfabetha OP: Y2

PILE PROFILE AND PILE MODEL


Depth Area E-Modulus Spec. Weight Perim.
m cm2 tons/cm2 tons/m3 m
0.00 1600.00 354.0 2.400 1.600
29.50 1600.00 354.0 2.400 1.600
Toe Area 0.160 m2

Segmnt Dist. Impedance Imped. Tension Compression Perim.


Number B.G. Change Slack Eff. Slack Eff.
m tons/m/s % mm mm m

1 1.02 148.92 0.00 0.000 0.000 -0.000 0.000 1.600


6 6.10 40.00 -73.14 0.000 0.000 -0.000 0.000 1.600
7 7.12 148.92 0.00 0.000 0.000 -0.000 0.000 1.600
29 29.50 148.92 0.00 0.000 0.000 -0.000 0.000 1.600
Pile Damping 2.0 %, Time Incr 0.267 ms, Wave Speed 3803.3 m/s, 2L/c 15.5 ms

Page 2 Analysis: 20-Feb-2017


Geotech Engineering
RUSUNAMI WISMA ATLET PILE DRIVING ANALYZER
PDA OP: Y2 Version 2016.125
TOWER 3 NO 9
SQUARE 40 DROP 3T
BN 3
2/17/2017 11:11:45 AM
800 5.37 RMX 111 tn
tn m/s RSU 113 tn
EMX 2.14 tn-m
F V CSX 16.8 MPa
TSX 2.8 MPa
LTD 23.5 m
DFN 4 mm
DMX 11 mm
BTA 45.0 (%)

LE 33.9 m
AR 1600.00 cm^2
EM 354 t/cm2
102.4ms
SP 2.40 t/m3
17.90 ms WS 3803.3 m/s
EA/C 148.9 tn-s/m
800 800 LP 33.7 m
tn tn
F12 A12
WD WU
F1: [N750] 153.2 (1.05)
F2: [C 343] 99.1 (1.05)
A1: [42400] 1155 g's/v (0.95)
A2: [42399] 1168 g's/v (0.95)

102.4ms
RUSUNAMI WISMA ATLET; Pile: TOWER 3 NO 9; SQUARE 40 DROP 3T; Blow: 3 (Test: 17-Feb-2017 11:11:) 20-Feb-2017
PT Geotech Alfabetha CAPWAP(R) 2006-3

900 tons 900 tons


Force Msd Force Msd
Force Cpt Velocity Msd

675 675

450 450

225 225

5 105 ms 5 105 ms
0 0
9 L/c 9 L/c

-225 -225

Pile
-450 -450

Load (tons) 5.0


Pile Top
Bottom Shaft Resistance
0 24 48 72 96 120
0.0 4.0 Distribution

3.0

Ru = 106.5 tons

tons/m
Rs = 62.7 tons 2.0
5.0 Rb = 43.8 tons
Dy = 14.4 mm 1.0
Dx = 18.3 mm
00
Pile Force
10.0
24 at Ru

48

Displacement (mm)
tons

15.0 72

96

120
20.0

CAPWAP(R) 2006-3 Licensed to PT Geotech Alfabetha


RUSUNAMI WISMA ATLET; Pile: TOWER 3 NO 9 Test: 17-Feb-2017 11:11:
SQUARE 40 DROP 3T; Blow: 3 CAPWAP(R) 2006-3
PT Geotech Alfabetha OP: Y2

CAPWAP SUMMARY RESULTS


Total CAPWAP Capacity: 106.5; along Shaft 62.7; at Toe 43.8 tons
Soil Dist. Depth Ru Force Sum Unit Unit Smith
Sgmnt Below Below in Pile of Resist. Resist. Damping
No. Gages Grade Ru (Depth) (Area) Factor
m m tons tons tons tons/m tons/m2 s/m

106.5
1 3.1 2.9 1.2 105.3 1.2 0.41 0.26 1.395
2 5.1 4.9 1.4 104.0 2.6 0.66 0.41 1.395
3 7.2 7.0 1.1 102.8 3.7 0.56 0.35 1.395
4 9.2 9.0 1.5 101.3 5.2 0.74 0.46 1.395
5 11.3 11.1 4.0 97.3 9.2 1.95 1.22 1.395
6 13.4 13.2 3.4 93.9 12.6 1.65 1.03 1.395
7 15.4 15.2 3.7 90.2 16.3 1.78 1.11 1.395
8 17.5 17.3 2.2 88.1 18.4 1.06 0.66 1.395
9 19.5 19.3 3.0 85.1 21.4 1.45 0.90 1.395
10 21.6 21.4 6.1 79.0 27.5 2.97 1.86 1.395
11 23.6 23.4 8.8 70.1 36.4 4.31 2.69 1.395
12 25.7 25.5 7.9 62.2 44.3 3.86 2.42 1.395
13 27.7 27.5 7.4 54.8 51.7 3.59 2.24 1.395
14 29.8 29.6 5.5 49.3 57.2 2.68 1.67 1.395
15 31.8 31.6 3.1 46.2 60.3 1.53 0.96 1.395
16 33.9 33.7 2.4 43.8 62.7 1.17 0.73 1.395
Avg. Shaft 3.9 1.86 1.16 1.395
Toe 43.8 273.69 1.326
Soil Model Parameters/Extensions Shaft Toe
Quake (mm) 7.185 5.196
Case Damping Factor 0.588 0.390
Unloading Quake (% of loading quake) 38 82
Reloading Level (% of Ru) 100 100
Unloading Level (% of Ru) 32

CASE METHOD
J = 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
RP 248.2 221.8 195.5 169.1 142.8 116.4 90.1 63.7 37.4 11.0
RX 267.2 241.0 214.7 188.4 162.2 136.2 111.3 88.3 81.6 81.6
RU 262.8 237.9 213.0 188.1 163.3 138.4 113.5 88.6 63.7 38.8
RAU = 79.9 (tons); RA2 = 92.8 (tons)
Current CAPWAP Ru = 106.5 (tons); Corresponding J(RP)= 0.54; J(RX) = 0.62

VMX TVP VT1*Z FT1 FMX DMX DFN SET EMX QUS
m/s ms tons tons tons mm mm mm tonne-m tons
1.73 22.96 255.1 256.5 274.5 11.437 3.899 3.900 2.1 279.3

Page 1 Analysis: 20-Feb-2017


RUSUNAMI WISMA ATLET; Pile: TOWER 3 NO 9 Test: 17-Feb-2017 11:11:
SQUARE 40 DROP 3T; Blow: 3 CAPWAP(R) 2006-3
PT Geotech Alfabetha OP: Y2

PILE PROFILE AND PILE MODEL


Depth Area E-Modulus Spec. Weight Perim.
m cm2 tons/cm2 tons/m3 m
0.00 1600.00 354.0 2.400 1.600
33.90 1600.00 354.0 2.400 1.600
Toe Area 0.160 m2

Segmnt Dist. Impedance Imped. Tension Compression Perim.


Number B.G. Change Slack Eff. Slack Eff.
m tons/m/s % mm mm m

1 1.03 148.92 0.00 0.000 0.000 -0.000 0.000 1.600


11 11.30 90.00 -39.56 0.000 0.000 -0.000 0.000 1.600
12 12.33 148.92 0.00 0.000 0.000 -0.000 0.000 1.600
24 24.65 50.00 -66.42 0.000 0.000 -0.000 0.000 1.600
25 25.68 148.92 0.00 0.000 0.000 -0.000 0.000 1.600
33 33.90 148.92 0.00 0.000 0.000 -0.000 0.000 1.600
Pile Damping 2.0 %, Time Incr 0.270 ms, Wave Speed 3803.3 m/s, 2L/c 17.8 ms

Page 2 Analysis: 20-Feb-2017


Geotech Engineering
RUSUNAMI WISMA ATLET PILE DRIVING ANALYZER
PDA OP: Y2 Version 2016.125
TOWER 3 NO 81
SQUARE 40 DROP 3T
BN 2
2/14/2017 10:10:12 AM
800 5.37 RMX 190 tn
tn m/s RSU 245 tn
EMX 1.56 tn-m
F V CSX 13.1 MPa
TSX 3.6 MPa
LTD 9.8 m
DFN 1 mm
DMX 10 mm
BTA 67.0 (%)

LE 34.4 m
AR 1600.00 cm^2
EM 354 t/cm2
102.4ms
SP 2.40 t/m3
18.20 ms WS 3803.3 m/s
EA/C 148.9 tn-s/m
800 800 LP 34.2 m
tn tn
F12 A12
WD WU
F1: [N750] 153.2 (0.95)
F2: [C 343] 99.1 (0.95)
A1: [42400] 1155 g's/v (1.05)
A2: [42399] 1168 g's/v (1.05)

102.4ms
RUSUNAMI WISMA ATLET; Pile: TOWER 3 NO 81; SQUARE 40 DROP 3T; Blow: 2 (Test: 14-Feb-2017 10:10:) 20-Feb-2017
PT Geotech Alfabetha CAPWAP(R) 2006-3

750 tons 750 tons


Force Msd Force Msd
Force Cpt Velocity Msd

563 563

375 375

188 188

5 105 ms 5 105 ms
0 0
8 L/c 8 L/c

-188 -188

Pile
-375 -375

Load (tons) 10.0


Pile Top
Bottom Shaft Resistance
0 40 80 120 160 200
0.0 8.0 Distribution

6.0

Ru = 182.2 tons

tons/m
Rs = 117.0 tons 4.0
5.0 Rb = 65.2 tons
Dy = 14.8 mm 2.0
Dx = 15.8 mm
00
Pile Force
10.0
40 at Ru

80

Displacement (mm)
tons

15.0 120

160

200
20.0

CAPWAP(R) 2006-3 Licensed to PT Geotech Alfabetha


RUSUNAMI WISMA ATLET; Pile: TOWER 3 NO 81 Test: 14-Feb-2017 10:10:
SQUARE 40 DROP 3T; Blow: 2 CAPWAP(R) 2006-3
PT Geotech Alfabetha OP: Y2

CAPWAP SUMMARY RESULTS


Total CAPWAP Capacity: 182.2; along Shaft 117.0; at Toe 65.2 tons
Soil Dist. Depth Ru Force Sum Unit Unit Smith
Sgmnt Below Below in Pile of Resist. Resist. Damping
No. Gages Grade Ru (Depth) (Area) Factor
m m tons tons tons tons/m tons/m2 s/m

182.2
1 2.0 1.8 0.1 182.1 0.1 0.04 0.03 1.238
2 4.0 3.8 0.3 181.7 0.4 0.16 0.10 1.238
3 6.1 5.9 0.4 181.4 0.8 0.19 0.12 1.238
4 8.1 7.9 0.7 180.7 1.5 0.35 0.22 1.238
5 10.1 9.9 0.9 179.7 2.4 0.46 0.29 1.238
6 12.1 11.9 1.3 178.5 3.7 0.62 0.39 1.238
7 14.2 14.0 4.0 174.4 7.7 2.00 1.25 1.238
8 16.2 16.0 7.0 167.4 14.8 3.48 2.17 1.238
9 18.2 18.0 6.7 160.6 21.5 3.33 2.08 1.238
10 20.2 20.0 4.6 156.0 26.1 2.29 1.43 1.238
11 22.3 22.1 5.4 150.6 31.5 2.67 1.67 1.238
12 24.3 24.1 6.9 143.7 38.5 3.43 2.14 1.238
13 26.3 26.1 6.7 137.0 45.1 3.29 2.05 1.238
14 28.3 28.1 14.1 123.0 59.2 6.95 4.35 1.238
15 30.4 30.2 19.6 103.4 78.8 9.69 6.05 1.238
16 32.4 32.2 19.4 83.9 98.2 9.60 6.00 1.238
17 34.4 34.2 18.7 65.2 117.0 9.26 5.79 1.238
Avg. Shaft 6.9 3.42 2.14 1.238
Toe 65.2 407.44 1.314
Soil Model Parameters/Extensions Shaft Toe
Quake (mm) 3.787 4.080
Case Damping Factor 0.972 0.575
Reloading Level (% of Ru) 100 100
Unloading Level (% of Ru) 26

CASE METHOD
J = 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
RP 266.0 252.5 239.0 225.5 212.0 198.4 184.9 171.4 157.9 144.4
RX 273.1 259.3 245.5 231.6 217.8 204.0 190.2 176.4 162.5 148.7
RU 303.4 293.6 283.8 274.0 264.3 254.5 244.7 234.9 225.1 215.3
RAU = 86.6 (tons); RA2 = 117.3 (tons)
Current CAPWAP Ru = 182.2 (tons); Corresponding J(RP)= 0.62; J(RX) = 0.66

VMX TVP VT1*Z FT1 FMX DMX DFN SET EMX QUS
m/s ms tons tons tons mm mm mm tonne-m tons
1.33 23.94 196.9 204.4 213.9 10.159 1.000 1.000 1.6 278.8

Page 1 Analysis: 20-Feb-2017


RUSUNAMI WISMA ATLET; Pile: TOWER 3 NO 81 Test: 14-Feb-2017 10:10:
SQUARE 40 DROP 3T; Blow: 2 CAPWAP(R) 2006-3
PT Geotech Alfabetha OP: Y2

PILE PROFILE AND PILE MODEL


Depth Area E-Modulus Spec. Weight Perim.
m cm2 tons/cm2 tons/m3 m
0.00 1600.00 354.0 2.400 1.600
34.40 1600.00 354.0 2.400 1.600
Toe Area 0.160 m2

Segmnt Dist. Impedance Imped. Tension Compression Perim.


Number B.G. Change Slack Eff. Slack Eff.
m tons/m/s % mm mm m

1 1.01 148.92 0.00 0.000 0.000 -0.000 0.000 1.600


12 12.14 75.00 -49.64 0.000 0.000 -0.000 0.000 1.600
13 13.15 148.92 0.00 0.000 0.000 -0.000 0.000 1.600
34 34.40 148.92 0.00 0.000 0.000 -0.000 0.000 1.600
Pile Damping 2.0 %, Time Incr 0.266 ms, Wave Speed 3803.3 m/s, 2L/c 18.1 ms

Page 2 Analysis: 20-Feb-2017


Geotech Engineering
RUSUNAMI WISMA ATLET PILE DRIVING ANALYZER
PDA OP: Y2 Version 2016.125
TOWER 3 NO 82_1
SQUARE 40 DROP 3T
BN 2
2/14/2017 11:50:18 AM
1000 6.71 RMX 166 tn
tn m/s RSU 245 tn
EMX 3.04 tn-m
F V CSX 19.3 MPa
TSX 4.5 MPa
LTD 21.7 m
DFN 3 mm
DMX 12 mm
BTA 90.0 (%)

LE 34.2 m
AR 1600.00 cm^2
EM 354 t/cm2
102.4ms
SP 2.40 t/m3
19.20 ms WS 3803.3 m/s
EA/C 148.9 tn-s/m
1000 1000 LP 34.0 m
tn tn
F12 A12
WD WU
F1: [N750] 153.2 (0.95)
F2: [C 343] 99.1 (0.95)
A1: [42400] 1155 g's/v (1.05)
A2: [42399] 1168 g's/v (1.05)

102.4ms
RUSUNAMI WISMA ATLET; Pile: TOWER 3 NO 82_1; SQUARE 40 DROP 3T; Blow: 2 (Test: 14-Feb-2017 11:50:) 20-Feb-2017
PT Geotech Alfabetha CAPWAP(R) 2006-3

950 tons 950 tons


Force Msd Force Msd
Force Cpt Velocity Msd

713 713

475 475

238 238

5 105 ms 5 105 ms
0 0
9 L/c 9 L/c

-238 -238

-475 -475

Load (tons) 15.0


Pile Top
Bottom Shaft Resistance
0 40 80 120 160 200
0.0 12.0 Distribution

9.0

Ru = 177.0 tons

tons/m
Rs = 134.6 tons 6.0
7.0 Rb = 42.4 tons
Dy = 17.3 mm 3.0
Dx = 20.3 mm
00
Pile Force
14.0
40 at Ru

80

Displacement (mm)
tons

21.0 120

160

200
28.0

CAPWAP(R) 2006-3 Licensed to PT Geotech Alfabetha


RUSUNAMI WISMA ATLET; Pile: TOWER 3 NO 82_1 Test: 14-Feb-2017 11:50:
SQUARE 40 DROP 3T; Blow: 2 CAPWAP(R) 2006-3
PT Geotech Alfabetha OP: Y2

CAPWAP SUMMARY RESULTS


Total CAPWAP Capacity: 177.0; along Shaft 134.6; at Toe 42.4 tons
Soil Dist. Depth Ru Force Sum Unit Unit Smith
Sgmnt Below Below in Pile of Resist. Resist. Damping
No. Gages Grade Ru (Depth) (Area) Factor
m m tons tons tons tons/m tons/m2 s/m

177.0
1 2.0 1.8 0.2 176.7 0.2 0.13 0.08 1.281
2 4.0 3.8 0.5 176.3 0.7 0.23 0.14 1.281
3 6.0 5.8 0.8 175.5 1.5 0.40 0.25 1.281
4 8.0 7.8 1.3 174.2 2.8 0.63 0.39 1.281
5 10.1 9.9 3.7 170.5 6.5 1.83 1.14 1.281
6 12.1 11.9 5.3 165.2 11.7 2.63 1.64 1.281
7 14.1 13.9 7.2 158.0 18.9 3.57 2.23 1.281
8 16.1 15.9 7.3 150.7 26.2 3.63 2.27 1.281
9 18.1 17.9 5.2 145.5 31.5 2.60 1.62 1.281
10 20.1 19.9 4.7 140.8 36.2 2.36 1.47 1.281
11 22.1 21.9 5.7 135.1 41.9 2.82 1.76 1.281
12 24.1 23.9 7.0 128.1 48.9 3.50 2.19 1.281
13 26.2 26.0 11.6 116.5 60.5 5.76 3.60 1.281
14 28.2 28.0 13.7 102.8 74.2 6.80 4.25 1.281
15 30.2 30.0 18.7 84.1 92.8 9.28 5.80 1.281
16 32.2 32.0 21.1 63.0 114.0 10.51 6.57 1.281
17 34.2 34.0 20.6 42.4 134.6 10.25 6.41 1.281
Avg. Shaft 7.9 3.96 2.47 1.281
Toe 42.4 264.69 0.318
Soil Model Parameters/Extensions Shaft Toe
Quake (mm) 3.177 6.619
Case Damping Factor 1.158 0.090
Unloading Quake (% of loading quake) 100 55
Reloading Level (% of Ru) 100 100
Unloading Level (% of Ru) 31

CASE METHOD
J = 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
RP 335.9 306.8 277.7 248.6 219.5 190.3 161.2 132.1 103.0 73.9
RX 335.9 306.8 277.7 248.6 219.8 192.5 166.1 142.8 123.3 108.5
RU 388.5 364.6 340.7 316.9 293.0 269.1 245.2 221.4 197.5 173.6
RAU = 58.3 (tons); RA2 = 166.8 (tons)
Current CAPWAP Ru = 177.0 (tons); Corresponding J(RP)= 0.55; J(RX) = 0.56

VMX TVP VT1*Z FT1 FMX DMX DFN SET EMX QUS
m/s ms tons tons tons mm mm mm tonne-m tons
2.10 24.07 313.0 314.1 314.6 12.196 3.000 3.000 3.0 400.2

Page 1 Analysis: 20-Feb-2017


RUSUNAMI WISMA ATLET; Pile: TOWER 3 NO 82_1 Test: 14-Feb-2017 11:50:
SQUARE 40 DROP 3T; Blow: 2 CAPWAP(R) 2006-3
PT Geotech Alfabetha OP: Y2

PILE PROFILE AND PILE MODEL


Depth Area E-Modulus Spec. Weight Perim.
m cm2 tons/cm2 tons/m3 m
0.00 1600.00 354.0 2.400 1.600
34.20 1600.00 354.0 2.400 1.600
Toe Area 0.160 m2
Top Segment Length 1.01 m, Top Impedance 148.92 tons/m/s
Pile Damping 2.0 %, Time Incr 0.264 ms, Wave Speed 3803.3 m/s, 2L/c 18.0 ms

Page 2 Analysis: 20-Feb-2017


Geotech Engineering
RUSUNAMI WISMA ATLET PILE DRIVING ANALYZER
PDA OP: Y2 Version 2016.125
TOWER 3 NO 282
SQUARE 40 DROP 3T
BN 3
2/15/2017 9:36:32 AM
1000 6.71 RMX 239 tn
tn m/s RSU 317 tn
EMX 2.51 tn-m
F V CSX 18.1 MPa
TSX 4.2 MPa
LTD 9.9 m
DFN 1 mm
DMX 12 mm
BTA 77.0 (%)

LE 33.7 m
AR 1600.00 cm^2
EM 354 t/cm2
102.4ms
SP 2.40 t/m3
17.70 ms WS 3803.3 m/s
EA/C 148.9 tn-s/m
1000 1000 LP 33.6 m
tn tn
F12 A12
WD WU
F1: [N750] 153.2 (0.95)
F2: [C 343] 99.1 (0.95)
A1: [42400] 1155 g's/v (1.05)
A2: [42399] 1168 g's/v (1.05)

102.4ms
RUSUNAMI WISMA ATLET; Pile: TOWER 3 NO 282; SQUARE 40 DROP 3T; Blow: 3 (Test: 15-Feb-2017 09:36:) 20-Feb-2017
PT Geotech Alfabetha CAPWAP(R) 2006-3

950 tons 950 tons


Force Msd Force Msd
Force Cpt Velocity Msd

713 713

475 475

238 238

5 105 ms 5 105 ms
0 0
9 L/c 9 L/c

-238 -238

Pile
-475 -475

Load (tons) 10.0


Pile Top
Bottom Shaft Resistance
0 40 80 120 160 200
0.0 8.0 Distribution

6.0

Ru = 190.5 tons

tons/m
Rs = 118.8 tons 4.0
5.0 Rb = 71.7 tons
Dy = 17.7 mm 2.0
Dx = 18.7 mm
00
Pile Force
10.0
40 at Ru

80

Displacement (mm)
tons

15.0 120

160

200
20.0

CAPWAP(R) 2006-3 Licensed to PT Geotech Alfabetha


RUSUNAMI WISMA ATLET; Pile: TOWER 3 NO 282 Test: 15-Feb-2017 09:36:
SQUARE 40 DROP 3T; Blow: 3 CAPWAP(R) 2006-3
PT Geotech Alfabetha OP: Y2

CAPWAP SUMMARY RESULTS


Total CAPWAP Capacity: 190.5; along Shaft 118.8; at Toe 71.7 tons
Soil Dist. Depth Ru Force Sum Unit Unit Smith Quake
Sgmnt Below Below in Pile of Resist. Resist. Damping
No. Gages Grade Ru (Depth) (Area) Factor
m m tons tons tons tons/m tons/m2 s/m mm

190.5
1 3.1 3.0 0.1 190.5 0.1 0.02 0.01 0.894 6.481
2 5.1 5.0 0.1 190.3 0.2 0.06 0.04 0.894 6.482
3 7.1 7.0 0.3 190.1 0.5 0.13 0.08 0.894 6.482
4 9.2 9.1 0.5 189.5 1.0 0.25 0.16 0.894 6.482
5 11.2 11.1 1.1 188.4 2.1 0.55 0.34 0.894 6.482
6 13.3 13.2 3.2 185.2 5.3 1.57 0.98 0.894 6.482
7 15.3 15.2 6.3 179.0 11.6 3.06 1.92 0.894 6.482
8 17.4 17.3 9.0 169.9 20.6 4.42 2.76 0.894 6.482
9 19.4 19.3 9.3 160.7 29.9 4.54 2.84 0.894 6.482
10 21.4 21.3 8.7 151.9 38.6 4.26 2.67 0.894 6.482
11 23.5 23.4 10.4 141.5 49.0 5.11 3.19 0.894 6.482
12 25.5 25.4 12.2 129.3 61.2 5.96 3.72 0.894 6.482
13 27.6 27.5 14.6 114.7 75.8 7.17 4.48 0.894 6.482
14 29.6 29.5 14.9 99.9 90.7 7.27 4.54 0.894 6.165
15 31.7 31.6 15.2 84.7 105.9 7.44 4.65 0.894 5.727
16 33.7 33.6 12.9 71.7 118.8 6.33 3.95 0.894 5.329
Avg. Shaft 7.4 3.54 2.21 0.894 6.220
Toe 71.7 448.31 1.313 6.265
Soil Model Parameters/Extensions Shaft Toe
Case Damping Factor 0.713 0.632
Reloading Level (% of Ru) 100 100
Unloading Level (% of Ru) 63

CASE METHOD
J = 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
RP 370.3 348.4 326.6 304.7 282.9 261.1 239.2 217.4 195.6 173.7
RX 370.5 348.7 326.8 304.9 283.0 261.2 239.3 217.4 195.6 173.7
RU 419.1 402.1 385.2 368.2 351.2 334.3 317.3 300.4 283.4 266.5
RAU = 117.2 (tons); RA2 = 117.2 (tons)
Current CAPWAP Ru = 190.5 (tons); Corresponding J(RP)= 0.82; J(RX) = 0.82

VMX TVP VT1*Z FT1 FMX DMX DFN SET EMX QUS
m/s ms tons tons tons mm mm mm tonne-m tons
1.97 23.90 294.1 294.6 295.5 12.398 1.000 1.000 2.5 374.2

Page 1 Analysis: 20-Feb-2017


RUSUNAMI WISMA ATLET; Pile: TOWER 3 NO 282 Test: 15-Feb-2017 09:36:
SQUARE 40 DROP 3T; Blow: 3 CAPWAP(R) 2006-3
PT Geotech Alfabetha OP: Y2

PILE PROFILE AND PILE MODEL


Depth Area E-Modulus Spec. Weight Perim.
m cm2 tons/cm2 tons/m3 m
0.00 1600.00 354.0 2.400 1.600
33.70 1600.00 354.0 2.400 1.600
Toe Area 0.160 m2

Segmnt Dist. Impedance Imped. Tension Compression Perim.


Number B.G. Change Slack Eff. Slack Eff.
m tons/m/s % mm mm m

1 1.02 148.92 0.00 0.000 0.000 -0.000 0.000 1.600


12 12.25 60.00 -59.71 0.000 0.000 -0.000 0.000 1.600
13 13.28 148.92 0.00 0.000 0.000 -0.000 0.000 1.600
33 33.70 148.92 0.00 0.000 0.000 -0.000 0.000 1.600
Pile Damping 2.0 %, Time Incr 0.269 ms, Wave Speed 3803.3 m/s, 2L/c 17.7 ms

Page 2 Analysis: 20-Feb-2017


Geotech Engineering
RUSUNAMI WISMA ATLET PILE DRIVING ANALYZER
PDA OP: Y2 Version 2016.125
TOWER 3 NO 502_1
SQUARE 40 DROP 3T
BN 2
2/17/2017 3:38:37 PM
800 5.37 RMX 159 tn
tn m/s RSU 178 tn
EMX 1.09 tn-m
F V CSX 10.1 MPa
TSX 4.5 MPa
LTD 0.0 m
DFN 0 mm
DMX 8 mm
BTA 100.0 (%)

LE 33.9 m
AR 1600.00 cm^2
EM 354 t/cm2
102.4ms
SP 2.40 t/m3
17.90 ms WS 3803.3 m/s
EA/C 148.9 tn-s/m
800 800 LP 33.7 m
tn tn
F12 A12
WD WU
F1: [N750] 153.2 (1)
F2: [C 343] 99.1 (1)
A1: [42400] 1155 g's/v (1)
A2: [42399] 1168 g's/v (1)

102.4ms
RUSUNAMI WISMA ATLET; Pile: TOWER 3 NO 502_1; SQUARE 40 DROP 3T; Blow: 2 (Test: 17-Feb-2017 15:38:) 20-Feb-2017
PT Geotech Alfabetha CAPWAP(R) 2006-3

750 tons 750 tons


Force Msd Force Msd
Force Cpt Velocity Msd

563 563

375 375

188 188

5 105 ms 5 105 ms
0 0
9 L/c 9 L/c

-188 -188

-375 -375

Load (tons) 10.0


Pile Top
Bottom Shaft Resistance
0 40 80 120 160 200
0.0 8.0 Distribution

6.0

Ru = 161.2 tons

tons/m
Rs = 99.2 tons 4.0
4.0 Rb = 62.0 tons
Dy = 10.9 mm 2.0
Dx = 11.2 mm
00
Pile Force
8.0
40 at Ru

80

Displacement (mm)
tons

12.0 120

160

200
16.0

CAPWAP(R) 2006-3 Licensed to PT Geotech Alfabetha


RUSUNAMI WISMA ATLET; Pile: TOWER 3 NO 502_1 Test: 17-Feb-2017 15:38:
SQUARE 40 DROP 3T; Blow: 2 CAPWAP(R) 2006-3
PT Geotech Alfabetha OP: Y2

CAPWAP SUMMARY RESULTS


Total CAPWAP Capacity: 161.2; along Shaft 99.2; at Toe 62.0 tons
Soil Dist. Depth Ru Force Sum Unit Unit Smith
Sgmnt Below Below in Pile of Resist. Resist. Damping
No. Gages Grade Ru (Depth) (Area) Factor
m m tons tons tons tons/m tons/m2 s/m

161.2
1 3.1 2.9 2.0 159.2 2.0 0.68 0.43 1.313
2 5.1 4.9 2.3 157.0 4.2 1.10 0.69 1.313
3 7.2 7.0 1.9 155.0 6.1 0.93 0.58 1.313
4 9.2 9.0 1.1 153.9 7.2 0.54 0.34 1.313
5 11.3 11.1 1.5 152.4 8.7 0.73 0.45 1.313
6 13.4 13.2 1.2 151.2 10.0 0.60 0.37 1.313
7 15.4 15.2 0.9 150.3 10.9 0.45 0.28 1.313
8 17.5 17.3 1.0 149.3 11.9 0.47 0.29 1.313
9 19.5 19.3 2.0 147.3 13.8 0.97 0.61 1.313
10 21.6 21.4 8.3 139.1 22.1 4.03 2.52 1.313
11 23.6 23.4 11.0 128.0 33.1 5.37 3.36 1.313
12 25.7 25.5 15.9 112.1 49.1 7.75 4.84 1.313
13 27.7 27.5 14.7 97.4 63.8 7.15 4.47 1.313
14 29.8 29.6 13.4 84.0 77.1 6.51 4.07 1.313
15 31.8 31.6 10.9 73.1 88.0 5.31 3.32 1.313
16 33.9 33.7 11.2 62.0 99.2 5.43 3.39 1.313
Avg. Shaft 6.2 2.94 1.84 1.313
Toe 62.0 387.38 1.313
Soil Model Parameters/Extensions Shaft Toe
Quake (mm) 2.064 2.020
Case Damping Factor 0.875 0.546
Reloading Level (% of Ru) 100 100
Unloading Level (% of Ru) 33

CASE METHOD
J = 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
RP 192.7 185.7 178.8 171.9 165.0 158.0 151.1 144.2 137.3 130.4
RX 210.4 201.7 193.0 184.3 175.7 167.1 158.6 150.3 142.2 135.6
RU 209.8 204.5 199.3 194.1 188.9 183.7 178.5 173.3 168.1 162.9
RAU = 38.3 (tons); RA2 = 97.7 (tons)
Current CAPWAP Ru = 161.2 (tons); Corresponding J(RP)= 0.45; J(RX) = 0.57

VMX TVP VT1*Z FT1 FMX DMX DFN SET EMX QUS
m/s ms tons tons tons mm mm mm tonne-m tons
0.89 22.15 131.4 130.4 165.0 8.165 0.215 0.300 1.1 256.8

PILE PROFILE AND PILE MODEL


Depth Area E-Modulus Spec. Weight Perim.
m cm2 tons/cm2 tons/m3 m
0.00 1600.00 354.0 2.400 1.600
33.90 1600.00 354.0 2.400 1.600
Toe Area 0.160 m2
Top Segment Length 1.03 m, Top Impedance 148.92 tons/m/s
Pile Damping 2.0 %, Time Incr 0.270 ms, Wave Speed 3803.3 m/s, 2L/c 17.8 ms

Page 1 Analysis: 20-Feb-2017


Ge tech EFATHAMA
Jl. Sunter Agung Niaga VI blok G6 no 40-41
Sunter Podomoro, Indonesia 14350
Telp. +62-21-293A1 P56721/22 Fax. +62-21-293A1 P56720
www.geotech-indonesia.com
H GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GE

LAMPIRAN B / APPENDIX B
SPESIFIKASI ALAT PDA
SPECIFICATION OF PDA EQUIPMENT

GEOTECHNICAL INSTRUMENTATION:
INCLINOMETER PIEZOMETER WATER STAND PIPE OBSERVATION WELL SETTLEMENT GAUGES

FOUNDATION TESTING:
STATIC LOAD TEST (INSTRUMENTED WITH VWSG) DYNAMIC LOAD TEST (PDA+CAPWAP)
PILE INTEGRITY TEST (PIT) CROSSHOLE SONIC LOGGING
THERMAL INTEGRITY PROFILING (TIP)

ENVIRONMENT MONITORING:
VIBRATION MONITORING TILTMETER CRACKMETER
Ge tech EFATHAMA
Jl. Sunter Agung Niaga VI blok G6 no 40-41
Sunter Podomoro, Indonesia 14350
Telp. +62-21-293A1 P56721/22 Fax. +62-21-293A1 P56720
www.geotech-indonesia.com
H GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GE

GEOTECHNICAL INSTRUMENTATION:
INCLINOMETER PIEZOMETER WATER STAND PIPE OBSERVATION WELL SETTLEMENT GAUGES

FOUNDATION TESTING:
STATIC LOAD TEST (INSTRUMENTED WITH VWSG) DYNAMIC LOAD TEST (PDA+CAPWAP)
PILE INTEGRITY TEST (PIT) CROSSHOLE SONIC LOGGING
THERMAL INTEGRITY PROFILING (TIP)

ENVIRONMENT MONITORING:
VIBRATION MONITORING TILTMETER CRACKMETER
Ge tech EFATHAMA
Jl. Sunter Agung Niaga VI blok G6 no 40-41
Sunter Podomoro, Indonesia 14350
Telp. +62-21-293A1 P56721/22 Fax. +62-21-293A1 P56720
www.geotech-indonesia.com
H GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GE

GEOTECHNICAL INSTRUMENTATION:
INCLINOMETER PIEZOMETER WATER STAND PIPE OBSERVATION WELL SETTLEMENT GAUGES

FOUNDATION TESTING:
STATIC LOAD TEST (INSTRUMENTED WITH VWSG) DYNAMIC LOAD TEST (PDA+CAPWAP)
PILE INTEGRITY TEST (PIT) CROSSHOLE SONIC LOGGING
THERMAL INTEGRITY PROFILING (TIP)

ENVIRONMENT MONITORING:
VIBRATION MONITORING TILTMETER CRACKMETER
Ge tech EFATHAMA
Jl. Sunter Agung Niaga VI blok G6 no 40-41
Sunter Podomoro, Indonesia 14350
Telp. +62-21-293A1 P56721/22 Fax. +62-21-293A1 P56720
www.geotech-indonesia.com
H GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GE

LAMPIRAN C / APPENDIX C
KALIBRASI TRANSDUCER & ACCELEROMETER
TRANSDUCER & ACCELEROMETER CALIBRATIONS

GEOTECHNICAL INSTRUMENTATION:
INCLINOMETER PIEZOMETER WATER STAND PIPE OBSERVATION WELL SETTLEMENT GAUGES

FOUNDATION TESTING:
STATIC LOAD TEST (INSTRUMENTED WITH VWSG) DYNAMIC LOAD TEST (PDA+CAPWAP)
PILE INTEGRITY TEST (PIT) CROSSHOLE SONIC LOGGING
THERMAL INTEGRITY PROFILING (TIP)

ENVIRONMENT MONITORING:
VIBRATION MONITORING TILTMETER CRACKMETER
Ge tech EFATHAMA
Jl. Sunter Agung Niaga VI blok G6 no 40-41
Sunter Podomoro, Indonesia 14350
Telp. +62-21-293A1 P56721/22 Fax. +62-21-293A1 P56720
www.geotech-indonesia.com
H GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GEOTECH GE

GEOTECHNICAL INSTRUMENTATION:
INCLINOMETER PIEZOMETER WATER STAND PIPE OBSERVATION WELL SETTLEMENT GAUGES

FOUNDATION TESTING:
STATIC LOAD TEST (INSTRUMENTED WITH VWSG) DYNAMIC LOAD TEST (PDA+CAPWAP)
PILE INTEGRITY TEST (PIT) CROSSHOLE SONIC LOGGING
THERMAL INTEGRITY PROFILING (TIP)

ENVIRONMENT MONITORING:
VIBRATION MONITORING TILTMETER CRACKMETER