You are on page 1of 1

PERHITUNGAN DAYA DUKUNG IJIN VERTIKAL PONDASI TIANG BOR

PROYEK : RUSUN = 800 mm


NO. BH1
Rumus Daya Dukung TIANG BOR Berdasarkan NSPT :
Diameter Shaft = 0.80 m
Diameter Ujung = 0.80 m Q ult = Qu + Qs
2
Area Shaf (As) = 0.502 m
Area Bulb (Ab) = 0.502 m
2
Q ult = (12XNUjungxAb)+(KellxLixFi) SAND/PASIR
Keliling Shaft (Os)= 2.512 m
SF 1 SF 2 Fi = 0,1 N
Keliling Ujung (Ob)= 2.512 m
(10XNUjungxAb)+(KellxLixFi) CLAY/SILT
SF1 = 2.5 Tekan SF 1 SF 2 Fi = 0,3 N
SF2 = 2.5 Friction

Kedalaman Li Jenis N Fi Li.Fi Kel Qs i Qs kum Qu i Q all


(m) (m) Tanah (SPT) Skin Friction m2 (ton) (ton) (ton) (ton)

0 0.00 - 0.00 0.60 0.00 2.51 0.00 0.00 15.07 6.03


2 2.00 C 6.00 1.50 3.00 2.51 7.54 7.54 37.68 15.07
4 2.00 C 9.00 1.90 3.80 2.51 9.55 17.08 32.66 16.08
6 2.00 C 4.00 1.40 2.80 2.51 7.03 24.12 12.56 11.86
8 2.00 C 1.00 0.60 1.20 2.51 3.01 27.13 5.02 11.66
10 2.00 C 1.00 0.30 0.60 2.51 1.51 28.64 5.02 12.86
12 2.00 C 1.00 0.80 1.60 2.51 4.02 32.66 17.58 18.49
14 2.00 C 6.00 1.20 2.40 2.51 6.03 38.68 27.63 24.12
16 2.00 C 5.00 2.50 5.00 2.51 12.56 51.24 47.73 34.57
18 2.00 C 14.00 3.20 6.40 2.51 16.08 67.32 67.82 47.63
20 2.00 C 13.00 5.10 10.20 2.51 25.62 92.94 92.94 64.11
22 2.00 C 24.00 5.40 10.80 2.51 27.13 120.07 102.99 78.37
24 2.00 C 17.00 9.10 18.20 2.51 45.72 165.79 168.30 115.35
26 2.00 C 50.00 11.70 23.40 2.51 58.78 224.57 251.20 166.80
28 2.00 C 50.00 12.80 25.60 2.51 64.31 288.88 195.94 168.20
30 2.00 C 28.00 11.70 23.40 2.51 58.78 347.66 168.30 182.87
32 2.00 C 39.00 8.00 16.00 2.51 40.19 387.85 130.62 191.31
34 2.00 C 13.00 5.90 11.80 2.51 29.64 417.49 50.24 175.24
36 2.00 C 7.00 2.80 5.60 2.51 14.07 431.56 37.68 182.07
38 2.00 C 8.00 2.60 5.20 2.51 13.06 444.62 47.73 191.72
40 2.00 C 11.00 3.00 6.00 2.51 15.07 459.70 55.26 199.96