BRIDGES
THREE SIGNATURE BRIDGES- REGGIO EMILIA ITALY
SAMUEL BECKETT BRIDGE DUBLIN - IRELAND
SERRERIA BRIDGE VALENCIA - SPAIN
WOODALL RODGERS BRIDGE-DALLAS USA
VENICE FOOTBRIDGE-ITALY
JERUSALEM BRIDGE -ISRAEL
SKYSCRAPERS
TURNING TORSO. MALM. SUECIA
CHICAGO SPIRE USA
PROFESSIONALEXPERIENCE: PROFESSIONALEXPERIENCE:
Morethan20yearsasstructuralengineerandmanager 7yearsasstructuralengineer
ThethreebridgesinReggioEmiliaaresingular
steelstructuresdesignedbySantiagoCalatrava
to improve vehicular access and to provide an
impressivenewentrancefromthenorth.
.
THREESIGNATUREBRIDGES.REGGIOEMILIA
LOCATION
CENTRALTIEDARCHBRIDGE.MAINDATA
Client: T.A.V. SpA , Comune Reggio Emilia
General Contractor: Rodano Consortile Scarl
Steel Subcontractor: Cimolai S.p.A.
Project Value: 18 Million euros
Total Steel S355 Tonnage: 4000 Tons
Total Concrete Volume poured: 11000m3
Height arch over deck 45m , Main Span 220 m
CENTRALBRIDGE.STRUCTURALDESCRIPTION
StructuralLayout:
Theprimarymemberinthestructuralschemeisthecentralarch(typeBowString with220mspan
and45mhigh)subjecttodirectcompression.
Thecentralbridgeisasinglespanstructurewithoneendfully fixedinthelongitudinaldirection.The
otherendhasalongitudinallyslidingsupportwithashockabsorber.
Thedeckisatrapezoidalsinglecellclosedboxgirderfromwhichcantileverribsspringevery3.5mto
configureanoverall27mwidedeck.
220m
CENTRALBRIDGE.STRUCTURALDESCRIPTION.CENTRALARCH
Themainarchistheprimarymemberinthestructuralschemesubjecttodirect compression.Many
calculationsweredevelopedinordertostudythebucklingbehaviorduetotheslendernessofthearch,
including2ndordernonlinearbucklinganalysisthatwasundertakenonatwostagebasis.Atfirststagea
destabilizingloadwasappliedtothemodeltoinvokeanimperfectionatthecrownofthearchof270mm
withinthegeometry.Atsecondstageanonlinearbucklinganalysiswascarriedoutusingthedeformed
shapefromStage1asthestartingpointfortheanalysis.
Inthistypeofstructurethecablesrestraintheinplanebucklingofthearchviathehungdeckwiththe
outofplanebuckling normallymorerestrictive(seefigure).
CENTRALBRIDGE.ARCHSECTIONS
The arch consists of two 4 sided
trapezoidal boxes with 1.02m
distance between them. Both
boxes are intermittently
connected which contributes
significantly to the behavior of
the arch for lateral buckling. The
inner face of each box is a truss
andnotstandardplate..
the arch is easy for inspection
and maintenance during the
service life of the bridge. The
plate thicknesses of the arch
rangebetween30mmand65mm.
CENTRALBRIDGE.STRUCTURALDESCRIPTION.CENTRALARCH
Thespringingofthearchisone
ofthemoreparticularpartsof
thebridgeasthebigoculus
capturestheattentionofthe
users.Thispartplaysan
importantroleinthestructural
schemebecauseistheelement
whichcarriesalltheforcesfrom
thearchtothedeck.The
springingismainlyaboxmadeof
thickplateswithinternal
stiffeners inordertoavoidthe
localbucklingofthewebs.
CENTRALBRIDGE.STRUCTURALDESCRIPTION.DECK
Thedeckisthetie ofthestructural
schemeandassuchisthemember
whichissubjectedmainlyunder
tensionefforts.
Thedeckworksalsolikeabeam
supportedelasticallybyeachpairof
cablesbecauseitisthememberof
thebridgethatsupportsdirectlythe
liveloads.
Thedeckisatrapezoidalsinglecellclosedbox
girder fromwhichcantileverribsspringevery
3.5mtoconfigureanoverall27mwidedeck
(includinglateralparapets).Theboxgirderis
madeofplatesof3060mmthickness.The
runningsurfaceforthevehiclesisasteel
orthotropicdeckmadeofa14mmplatewith
openlongitudinalstiffenersof20mm
CENTRALBRIDGE.STRUCTURALDESCRIPTION.CABLES
The50pairsof44mm
diametercables ofthemain
bridgearelockedcoilwith
thefixedanchoragewithin
thearchandtheactive
anchorageinthecentralbox
girder.Inthiswaythe
torsional rigidityofthe
structureispredominantly
controlledbythetorsional
stiffnessofthecentralbox
girder.
CENTRALBRIDGE.STRUCTURALDESCRIPTION
SUPPORTCONDITIONS
Thecentralbridge,asatiedarch,isasingle
spanstructurewithonesupportfullyfixed
inthelongitudinaldirection.Theotherend
hasalongitudinallyslidingsupportwitha
3500kNshockabsorber(LockUpDevice or
LUD)providedinordertoallowthelow
velocitydisplacementsprimarilyfrom
temperatureandtorestrainthelongitudinal
directionfortheseismicevent.Inthisway
thehorizontalforcesfromtheseismic
actionaredistributedatbothabutments.
Thereare4potbearingsattheabutments.
Theabutmentsaremadeofreinforced
concrete andtheycarrythereactionsfrom
thebridgetothegroundby36unitsof1.5m
diameterspilesateachabutment.
STEELFABRICATION
CENTRAL BRIDGE. ERECTION. LAUNCHING
Thestructurewaserectedtakinginto
accountthatthetrafficflowingalongthe
motorwaybelowshouldbemaintained
duringtheerection.
Thecontractorproposedtolaunchfrom
onesidethedeckwithlargesegments
ofthearchonit.
CENTRAL BRIDGE. ERECTION.LIFTING ARCH SEGMENTS
.Thesegmentsofthearchwereliftbymeansofthree
temporarytowersprovidedwithheavyliftingsystems
CENTRAL BRIDGE. ERECTION.LIFTING ARCH SEGMENTS
CENTRALBRIDGE.FINISHES
CENTRALBRIDGE.FINISHES
TWINBRIDGES.STRUCTURALDESCRIPTION
Structural Layout:
The twin bridges across the roundabouts are cable stayed bridges consisting of 1400tons of
S355 steel for each one. The pylon is positioned in the transversal plane to the direction of the
bridge (Figure) and divides the deck in two symmetrical spans of 90m
220m
90m
TWINBRIDGES.STRUCTURALDESCRIPTION.CENTRALARCH
Themainbearingelementisthe
centralsteelpylon,whichisa69m
higharchandrises58moverthe
platform
Thepylonispositionedinthe
transversalplanetothedirectionof
thebridgeanddividesthedeckintwo
symmetricalspansof90m.The
transversalsectionofthepylonisa
nonregular7sidedpolygonmadeof
38mmplates.
TWINBRIDGES.STRUCTURALDESCRIPTION.CENTRALARCH
TWINBRIDGES.STRUCTURALDESCRIPTION.DECK
Theplatformis12.5mwideandis
supportedby25pairsofcables.Itis
dividedinonelaneperdirectionfor
thevehiculartraffic.Theconceptof
thedeckisidenticaltothatofthe
centralbridge,acentralhollowbox
fromwhichtwocantileverribsspring
toformatotal14.6mwidedeck
(includinglateralparapets).Theribs
arespacedlongitudinallyat3.5m
centers.
Theboxgirderismadeof15and22
mmthickplatesandthefloorforthe
vehiclesisasteelorthotropicdeck
madeofa14mmplatewithopen
longitudinalstiffenersof20mm
TWINBRIDGES.STRUCTURALDESCRIPTION.CABLES
The25pairsof60mmdiameter
cables ofeachtwinbridgeare
lockedcoiltypeandtheyare
anchoredfromthecenterofthe
decktothepylonmakingavery
originalpattern
TWINBRIDGES.STRUCTURALDESCRIPTION
SUPPORTCONDITIONS
Bothendsofthedeckareslidingsupported.Thecentralsupport ofthedeckatthemid
spanconsistsonarigidconnectionwiththepylon.Thissupportisthepointwhich
restrainsthedecklongitudinally.
Duetothefactthatbothendsofthebridgeareslidingsupports,oneofthecritical
loadconditionswastheunsymmetricalcaseofjustonespanloaded.Inthiscasethe
cablesofthenonloadedspanplaytheroleofbackstays.Inthistypologyofbridge
underthiseventtheresistingactionisthebendingandaxialstiffnessofthedeck.
TWINBRIDGES.STRUCTURALDESCRIPTION
Forthetorsional loadcases,thepotbearings(compressiononlysupports)aresuppliedwithacoupleof
bars(tensiononlysupports)placedatbothedgesofthetransversalsection.Inthiswaythetorsional
forcescanbeabsorbedbytakingadvantageoftheleverarmbetweenoneofthebarsandtheopposite
potbearing.Benefitsinthecostofthebearingsarealsoimportantbecauseupliftresistingdevicesare
notnecessaryandthepotbearingcanbestandard.Thebarsareanchoredtotheendoftheribwitha
slottedpinwhichallowsthelongitudinalmovementsofthedeck.
Theabutmentsaremadeofreinforcedconcreteandtheycarrythereactionsfromthebridgetothe
groundby15unitsof1.5mdiameterspilesateachabutment.Thepylonissupportedbymeansoftwo
pilescapsof42pilesof1.5mdiameter
TWINBRIDGES.ERECTION
Theerectionofthecable
stayedbridgeswasmore
conventionalbutnotless
interesting.Theerection
consistedonsupportingthe
deckwithjusttwotemporary
supports.ThePylonwas
erectedinthreelargepieces
(twostraightlegsandthetipof
thearch)withoutanysupport.
Thenthecableswereinstalled
andputintensioninorderto
removethetemporary
supports
TWINBRIDGES.ERECTION
TWINBRIDGES.FINISHES
TWINBRIDGES.FINISHES
SAMUELBECKETTBRIDGE,DUBLIN
SUMMARY
OpenedDecember2009
Landmark movable structure spanning the
maritime gateway to the City, linking the outer
orbitalroute.
LocatedeastoftheCityscentre and within the
newlydevelopedDocklands area.
Forprivatecaruse,publictransport,cyclistsand
pedestrians.
Client&Engineer: DublinCityCouncil
Engineerssupervision: DublinCityCouncil&
Flint&Neill
Designer: SantiagoCalatrava
IndependentChecker: Roughan &ODonovan
Contractor: GrahamHollandiaJV
Projectcost: ca.60000000 Euros
ConstructionPeriod: 30months
SAMUELBECKETTBRIDGE
GENERALDESCRIPTION
123mlongswingbalancecablestayedbridgewithaninclined
andcurvedpylon,andwithunequalspans.Thebridgerotates
90 inthehorizontalplanetoallowshipstopass,withtheaxis
ofrotationapproximately28mfromthesouthquay.
Steeltonnage:Deck 1860t,Pylon373t,Cables 90t
CounterBallasttonnage:Steel+HeavyConcrete2820t
SAMUELBECKETTBRIDGE.DESIGN
STRUCTURALLAYOUTANDDESIGN
AstheSamuelBeckettBridgeisaswingbridge,twomainconditionsneededtobedesigned for:
1. Openposition: Novehicularloadingandnosupportattheends.
2. Closedposition: Subjecttoliveloadingsandsupportattheembankments.
SAMUELBECKETTBRIDGE.DESIGN
STRUCTURALLAYOUTANDDESIGN
AstheSamuelBeckettBridgeisaswingbridge,twomainconditionsneededtobedesigned for:
1. Openposition: Novehicularloadingandnosupportattheends.
2. Closedposition: Subjecttoliveloadingsandsupportattheembankments.
SAMUELBECKETTBRIDGE.DESIGN
STRUCTURALLAYOUTANDDESIGN
AstheSamuelBeckettBridgeisaswingbridge,twomainconditionsneededtobedesigned for:
1. Openposition: Novehicularloadingandnosupportattheends.
2. Closedposition: Subjecttoliveloadingsandsupportattheembankments.
ThebridgewasfirstdesignedfortheOpenposition.
Balancebridge,i.e.obtainminimalnetmomentatcentralsupportbyprescribingthecounterbalance
mass.
Achieverequiredprofileofthestructureandalignmentatabutments:Byspecifyingtensionsinfore
andbackstays.
Designthestructurewithoutvehicularloading.
Secondlythebalanced bridgewithcorrectshapewasdesignedfortheClosedposition.
Designthestructurewithliveloads.
Therefore,alltheelementsofthebridgeweredesignedaccordingtoanenvelopeofthetwoconditions.
SAMUELBECKETTBRIDGE.DESIGN
DECK
The main fore deck structure, the front span, is a multicell box girder, made up from relatively thin (10
20mm) steel plates stiffened internally using a combination of longitudinal bulb flats, angle sections and
trapezoidal stiffeners. Cantilevered from this main box section are the ribs and steel decking which form the
pedestrianandcycletracks.
Thebackspan,whichhousesthecounterbalance,isalsoamulticellboxgirderbut,madeupfromunstiffened
steelplates(2060mm).Thecellsinthebackspanweregenerallyfilledwithaheavy,selfcompactingconcrete,
whichalsosupportsthesteelplates,preventingthemfrombucklinglocally.
SAMUELBECKETTBRIDGE.DESIGN
DECK
The cross section of the deck consists of two pedestrian and cycle tracks and four lanes for car traffic, two of
whichcanbeadaptedtoaccommodatetramsinthefuture.
Thetopoftheboxatthefrontspanconsistsofa14mmthickplatewith12mmtrapezoidalstiffeners.The36
mmmasticasphaltlayerwastakenaccountofinthefatiguecheckforthisorthotropicdeck.
The single, central, line of forestays supporting the front span from a curved pylon tends to lead to large
torsional forces in the deck due to unbalanced live loadings either side of the line support. Therefore, an
advantageofusingamulticellboxsectionisitsinherenttorsional rigidity.
SAMUELBECKETTBRIDGE.DESIGN
PYLON
The pylonwas fabricatedfromshapedandweldedthicksteelplates(80120
mm),formingavariableboxsection.
The25forestaysareattachedtothecurved,inclinedandslenderpylon.The
pylon in turn transmits the applied cable reactions, via axial forces mainly,
but also bending moments, to its base where it is fully connected to the
main deck and the central lifting cylinder, and to its apex where it is
restrainedbythesixinclinedbackstays.
The pylon is restrained from buckling in the longitudinal direction by the
forestays, but is slender in the transverse direction between the top and
bottom where it is restrained by the backstays and deck structure. The
bucklingfactor(forthefirstshapeofbuckling)wasfoundtobe3.6.
SAMUELBECKETTBRIDGE.DESIGN
CABLESTAYS
Thecablestaysarealllockedcoilstrands,withtwentyfive60mmdiameterstrandssupportingthefrontspan
andatotalofsix145mmdiameterstrandstowardstheback.
BridonLockedCoilStrands:
ForeStayDiameter: 60mm
Min.BreakingLoad: 3590kN
Max.PermanentForce: 961kN
Max.WorkingLoad: 1292kN
BackStayDiameter: 145mm
Min.BreakingLoad: 20100kN
Max.PermanentForce: 9200kN
Max.WorkingLoad: 10050kN
SAMUELBECKETTBRIDGE.DESIGN
CENTRALSUPPORT
Themainsupportintheriverconsistsofeighteen1200mmdiametercastinplacepilessupportinga15x15m
pilecap, 3 m deep and a circular concrete pier of varying diameter housing the hydraulic turning and lifting
equipment, and the horizontal and vertical bearings, which support the entire bridge while turning. The
equivalentspringstiffnessofthepierwasfoundandappliedas circularspringsupportintheFEmodelofthe
steelsuperstructure.
SAMUELBECKETTBRIDGE
LOCKINGPIN&EXPANSIONJOINTSYSTEM
Attheendsofthebridgehydraulicallycontrolledlockingpinsattachthebridgestructuretothehousingscast
into the abutments. The locking pins are designed as part of the bridge rotation mechanism and provide the
finalalignmentofthebridge,verticallyandhorizontally.This isnecessaryduetotherangeofdeflectionsatthe
bridgeendssuchastemperatureeffectsandcablesag.
Anintelligenthydraulicallycontrolledexpansionjointsystemisinstalled.
SAMUELBECKETTBRIDGE.CONSTRUCTION
CENTRALSUPPORT
Siteinvestigationrevealedthepossibilityofwaterpressurein therockexertinganupliftontheunderside
of the clay, such that it could cause the base of the cofferdam to heave. Pressure relief wells were
installedandthepiezometers indicatedthatthepressure under the base remained at safe levels during
construction.
The top section of the pier was complex in its geometry with the outside surface curving in two planes.
Bespokeformworkwasdesignedandassembledandtheconcretecastinquarters.
SAMUELBECKETTBRIDGE.CONSTRUCTION
CENTRALCYLINDER
The central cylinder has a diameter of 2.5 m and has a plate thickness of
120mm. To reduce the friction moment resistance at the bottom, a 15
tonnesconeshapedcastitemwasweldedon.Atthelevelofthehorizontal
bearingsIconel(austenitic nickelchromiumbased superalloy) was welded
on and machined to create a hard and lowfriction surface. This cylinder
transfers the entire weight of the bridge (5,850 tonnes) and any out of
balancemomentwhenthebridgeisturningorinopenposition.
SAMUELBECKETTBRIDGE.CONSTRUCTION
ROTATIONMECHANISM
SAMUELBECKETTBRIDGE.CONSTRUCTION
FABRICATION,ASSEMBLYANDTRANSPORT
Thedeckwasfabricatedfirstineightsectionsandthepylonin five.Thesizeoftheindividualelementstowas
dictated by the facilities at Hollandias workshops (amount of handling necessary and their painting facility).
Hollandia determinedthatthebridgedeckshouldbemadeupofeightsectionsandthatthese,oncepainted,
would be joined together on a prepared assembly area where the completed unit could be easily transferred
ontoaseagoingbargefortransporttoDublin.
SAMUELBECKETTBRIDGE.CONSTRUCTION
WELDING
A range of welding processes were used during fabrication with each method selected to suit the joint
configuration and position. Automated processes such as submerged arc were used whenever possible but
with manual methods, mainly flux core, also being used extensively. All butt welds and a proportion of fillet
weldswereexaminedusingUTmethodsforburieddefectsandMPIforsurfacebreakingdefects.
Allvisibleweldsweregroundflushduetoarchitecturalreasons.
SAMUELBECKETTBRIDGE.CONSTRUCTION
ASSEMBLY
SAMUELBECKETTBRIDGE.CONSTRUCTION
ASSEMBLY
As the deck deck sections came out of the paint shop they were positioned at the correct position and
height at the assembly area, and welded to the adjacent section, finally forming one bridge deck. The
pylonbasesectionwasprefabricatedandfittedtothebridgedeckandtheremainingfoursectionswere
weldedtogether,liftedpositionedandtemporarilysupportedwhilstthefinalcircumferentialweldswere
laid.
SAMUELBECKETTBRIDGE.CONSTRUCTION
LOADOUT
Thebridgewasnoreadytobetransferredontothebarge.Trailerswaspositionedunderneaththebridge
anddroveofftheassemblyareaandontothebargeinaslowand controlledmanner.
SAMUELBECKETTBRIDGE.CONSTRUCTION
SEATRANSPORT
The Contractor investigated the sea route from Hollandias fabrication yard in Rotterdam to Dublin. The East
Link Bridge in Dublin was found to be the limiting width restriction and the Konigshaven Bridge in Rotterdam
giving the height limit. A detailed follow up investigation identified that if some railings and street furniture
could be temporarily removed from the East Link Bridge it would be possible for the complete bridge
superstructure,includingpylonandstays,topassthroughonasuitabletidelevel.
SAMUELBECKETTBRIDGE.CONSTRUCTION
SEATRANSPORT
The superstructure was shipped to Dublin in May 2009. The journey from Rotterdam to Dublin was carefully
monitored throughout the 628 mile journey. This took eight days to complete as the shipment was forced to
shelterfromhighwindsforaperiodbeforetraversingtheIrish Sea.
SAMUELBECKETTBRIDGE.CONSTRUCTION
SEATRANSPORT
The sea transport and the sudden appearance of a land mark structure received a lot of positive publicity in
localandinternationalmedia.
TheSamuelBeckettBridgethroughEastLinkBridgewhenarriving inDublin.
SAMUELBECKETTBRIDGE.CONSTRUCTION
C.O.G.ANDSKIDDING
Following arrival in Dublin, with the bridge still supported on the barge and now moored to the quay wall, it
was necessary to ballast the back span using heavy concrete and steel blocks to ensure the centre of gravity
waslocatedcentrallywithinthesupportzone.Thestructurewas thenskiddedalongtheseagoingbarge to a
positionthatallowedthebackspantobesupportedonasecondbarge,henceleavingthebridgesupportarea
free above the river. The bridge lifting cylinder had been positioned within the main support pier and would
laterbeweldedtothemainstructure.
SAMUELBECKETTBRIDGE.CONSTRUCTION
LOADTRANSFER
With the bridge now balanced and supported on two barges, at high tide the barges were moved so as to
position the bridge support area directly above the pier that had been cast in the river. As the tide level
continued to reduce, the barges could be moved away from the bridge leaving the structure balanced and
supportedontherimbearing.
SAMUELBECKETTBRIDGE.CONSTRUCTION
FIRSTROTATION/CLOSINGOFBRIDGE
Onceinposition,thefinalweldedconnectionofthebridgeliftingcylinderwasmadeandthehydraulicsystem
connectedandtemporarilyactivatedtorotatethebridgetospan theriverforthefirsttime.
SAMUELBECKETTBRIDGE.CONSTRUCTION
COUNTERBALLAST
Someofthecellsarefilledwithacombinationofsteelblocksandconcrete.Inordertoachievethefinalbridge
balancetheamountofsteelballastplacedonsiteduringconstructioninthesecellswasadjustable.Thisallows
for the addition or removal of mass in order to balance any future changes made to the superimposed dead
loadsonthebridge.
The final balancing was carried out by removing the horizontal bearings at the central support, leaving only
three vertical supports. If any of the two supports at the bridge ends did or did not not have any weight on
itself,thecounterballasthadtobeadjusteduntilbothhadapproximatelynoreaction.Duringthisprocessone
could easily calculate what the outofbalance moment was knowing reaction, measured with loadcells and
armofcantilever.
SAMUELBECKETTBRIDGE.CONSTRUCTION
GEOMETRYCONTROL
AstheContractorreportedactualdeadloadsanddeflectionsasignificantamountofreanalysiswas
requiredtoachieveagoodbalancebetweenfinalcableforcesandbridgedeformations.Wherecable
forceswerechangedtoamendthedeformationoftheendsofthedeck,stressesinthebridge
structurechangedaccordinglyandhadtobechecked.Thebackspanofthebridgeisextremelystiff,
whilstthepylonandfrontspandeformrelativelyeasily.Thisresultedinacomplexequationwith
numerousvariables,whichwasfinallysolvedbyamendinglevelsattheabutments,ballastquantities
andcableforces.
SERRERIA BRIDGE VALENCIA (2005-2008)
Cablestayedbridge.Span155m.Deckwidth38m
Inclinedcurvedpylon height125m
SERRERIA BRIDGE - VALENCIA
Client:CACSA(PublicentityoftheValenciaRegionalGovern)
GeneralContractor:Jointventure:FCCandPavasal
SteelSubcontractor:HORTACoslada,LaCorua,Spain
ProjectValue:40Millioneuros
ProjectCompletionProgramme:3years
TotalSteelTonnage:5055Tons
TotalConcreteVolumepoured:21160m3
Heightpylon125m,MainSpan155m,totalLength350m
ErectionofPylonunit.Boltconnectedandwelded
JERUSALEM BRIDGE ISRAEL
Period of Construction: April 2006 to August 2008 (without the track bed)
Transportthefuturelightrailsystemandpedestriansoveramajorintersectionandplaza
Curveddeckplanview.Cablestayedbridge.Themastformsanangle
JERUSALEM BRIDGE ISRAEL
GeneralContractor: RAMET
SteelFabricator: KOORMetals
(CIMOLAI SPAassubcontractor)
Span=160m
HeightofPylon=118m
SteelTonnage:
Deck=2720tons
Footbridge=48tons
Pylon=1241tons
Concrete: 5500cubicmeter
VENICEFOOTBRIDGE.ITALY
20052008
Staticscheme:DepressedArch.Span81m.Rise4.8mRise/Spanratio1/16
Weightsteelstructure408tons
Specialprecaution:Horizontalreactionscontrolofsettlements
VENICEFOOTBRIDGE.ITALY
20052008
OLYMPICGAMESATHENS2004
OLYMPICSTADIUMANDVELODROMEROOFS
INTRODUCTION
Santiago Calatrava : Project of aesthetic
unification of OAKA area for the 2004
OlympicGames
Twosingularstructures:
OlympicStadiumRoof
VelodromeRoof
OLYMPICSTADIUMROOF.ATHENS
Goal: Provide a new roof for the existing stadium
compatible with the renovation works..
Main Challenges:
Description:
The roof will be composed of a pair of bent leaves,
which will cover a surface of some 25,000 m2. The two
halves are simmetrical and connected only at two
points.
Mainbearingsystem:2paralellarches
typeBowString 304mspan,80m
heightandlocated141.4mapart.
Transmissionofhorizontalloads
Externalside:diagonalelements
Internalside:diagonalsand
vierendeelbeamatthreelastribs.
4bearingpoints
NorthSide:Fullyrestrained
movementsandrotations
SouthSide:Fullyrestrainedbut
longitudinaldisplacements.
OLYMPICSTADIUMROOF.ATHENS
STRUCTURAL DESCRIPTION
Mainbearingsystem:
MAINDECISIONS
Erectionofthetwohalfroofsseparatedfromthestadium
Preassemblyandweldingongroundoflargeelements:4
piecesof70m.
Onehalfroofstarted3weeksbefore
OLYMPICSTADIUMROOF.ATHENS
ERECTION AND STRUCTURAL IMPLICATIONS ARCH ERECTION
FirstStage PartialRemovalofshoringtowersofarches:
Desapeo Desapeo Desapeo
Lowering250mmattemporarytowers spanand 250mm 250mm
removingrestoftemporarytowers.
Thisprocesstransfers1850tononthedefinitive
supports42%ofthefinalweight.
Benefits:
1.Usingtheelementsofthecentraltowerforthe
secondarytowers.
2.Reductionofforcesinotherelementsduetoarches
selfweight.
Reductionupto30%bending
momentstransverseribs.
Reductionupto30%axialeffortat
diagonalsandlongitudinalelements.
OLYMPICSTADIUMROOF.ATHENS
ERECTION AND STRUCTURAL IMPLICATIONSERECTION OF HALF-ROOFS
SecondStageErectionHalf Roofs:
Stressingsecondarycables,removalof
secondarytowers,andfinallyremoving
shoringtowersunderarches.
Themainstructure(archtorsiontube)is
bearingonfinalsupports9000ton.
Thelongestribshadtobereinforcedwith
temporarytrussesuntilbothroofswere
connected.
OLYMPICSTADIUMROOF.ATHENS
Temporarysteelbeams
ERECTION AND STRUCTURAL IMPLICATIONS andskiddshoes
SKIDDING OF HALF-ROOFS
Equipment:
1. Finalroofsupportsequipedwith
temporarysteelbeamsmountedon
skiddshoesbearingonconcretewalls.
2. SteelskiddshoesonPTFElayerslidingon
stainlesssteeltracks. Concretewall Lateraldampers
andlateral
guiding
3. Hidraulicjacksformovement.
4. Lateraldampersmountedatnorthside.
Slidingdata: Finalsupports
1. Speed:1.4mm/seg
2. Mximumaceleration:7.2mm/seg2
3. Frictioncoeficient:2.6% Temporary
beams
Hidraulicjacks
OLYMPICSTADIUMROOF.ATHENS
ERECTION AND STRUCTURAL IMPLICATIONS SKIDDING OF HALF-ROOFS
Finalpositionaftersliding:
Theconnectionjointofthetwohalf
roofswereintentionallyleft
separated160mmaserection
tolerance.Thegapisfilledwithsteel
plates.
.
OLYMPICSTADIUMROOF.ATHENS
ERECTION AND STRUCTURAL IMPLICATIONSFINAL SUPPORTS FIXED TO FOUNDATIONS
SupportsNorthSide:Fullyrestrainedallthemovements.
SupportsSouthSide:Fullyrestrained,butlongitudinalmovement
OLYMPICSTADIUMROOF.ATHENS
STRUCTURAL ANALYSIS
Mostimportantissues:
1.Archesstability.
2.Constructionstagestakedintoaccountintheanalysis.
3.Cablesmodelling.
4.Modellingofvariabledepthribs,incluidinglateralbuckling
analysis.
5.Nongeometriclinearity Precambersincludedinthe
analysis.
6.Acctions:
6.1Wind:Windtunneltestsforload
estimation.
6.2Seismicactions,twodifferentanalysis:
Responsespectrumlineardynamicanalysisandnonlinear
analysiswithequivalentstaticloads.
OLYMPICSTADIUMROOF.ATHENS
LIST OF PARTICIPANTS AND MAIN DATA
Longitudinal Elevation
Plan View
OLYMPICVELODROMEROOF.ATHENS
Main data
Steel in structure 3380 tons
Cables 80 tons
Participants
SUMMARY
LOCATION
HSB Turning Torso is located in Malm ( Sweden ) at the
Western Harbour area, near the sea and close to the city
center. The intention of the owner HSB Malm was to
createalandmarkforthecity.
FOUNDATION
CentralCore
The main load bearing structural element for vertical
andhorizontalloadsisthecentralconcretecore,which
has an internal diameter of 10,5m and variable
thicknessbetween2,5minthebasementto0,40mat
thetopofthetower.
ConcreteColumn
There is a continuous reinforced concrete column
(aproximate dimensions 1.5x1.5 m) located at the
corneroftheplans.
CONCRETESTRUCTURE
Exterior exoskeleton
The exterior steel truss or exoskeleton provides
additionalhorizontalstiffnesstothebuilding.
CONCRETE COLUMN:
factor factor
-1
m/m m/m m/m c,h (C) m/m m/m m/m c,v (C)-1
NOTES:
1.- Linear interpolation for the intermediate cubes
2.- A constant variation of temperature has been applied to the whole core = -30 C
STRUCTURALANALYSIS
Global Model
Thestructuralanalysisofthebuildingwasmadewithaglobal
finite element model with the sofware SAP 2000. The model
simulates all the concrete and steel elements as well as the
foundationsslabsandpiles.
Deck
level ShearWalls
Standardlevel (radialand
perimetral)
Perimetercolumns
Conicalslab
STRUCTURALANALYSIS
Verification of Concrete elements. Reinforcement area.
Duetotheimportanthyperstaticalforcesandtheinteractionbetweenthedifferentelements(core,cloumn,slabsandshear
walls ) it is not possible to analyzed each element isolated but to extract the forces from the global FEM model. After the
analysisofthemodeltheoutputresultsoftheshellelementsofthecore,slabsandshearwalls,andforallloadcombinations
were processed with a postprocessing program in order to obtain the necessary reinforcement in both local directions and
bothfacesoftheelementforthepredominantcase,consideringallforcesandmomentsandthematerialfeatures.
STRUCTURALANALYSIS
Analysis of displacements
ThedisplacementsforserviceabilityLimit
State were calculated at the top of the
buiding for the worst wind actions for a
100yearreturnperiod.
Quantities
Heightofbuilding: 192m.
Numberoffloorsaboveground:55
Totalsurface: 31,900m2
Apartamentstotalsurface(cubes3to9):16,500m2
Officestotalusefulsurface(cubos1y2):4,500m2
Concrete: 25,000m3
Reinforcementsteel: 4,400Tons.
SteelstructureExteriorexoesqueleton:820Tons.
Faadesurface: 20,000m2
Glasssurface: 5,500m2
Elevators:3forapartaments,2foroffices.
PARTICIPANTS
Elevators KONE AB
THANK YOU FOR YOUR ATTENTION