1.5 Inspection fit-up and welding between pipe 3568-DB-036-A2 with 3568-DB-036-A5.
As per ITP step 18&19(welding inspection-welding preparation& welding process), GQIS inspector checked
fit-up and welding between pipe 3568-DB-036-A2 with 3568-DB-036-A5, checked the fit-up gap about
2mm, alignment about 1mm, polished the weld area of two side welding seam about 20mm, during welding
checked consumable was H08MnMoA(SJ101), current about 884A and voltage about 30.1V, which in
accordance with WPS and specification, after finished one side of welding back gouging by electric arc, not
found any indication of welding defect and polish the groove then process back welding, also the reinforce
007 (Revision 0) Daily Report Dated: 29nd August 2016
Daily Report
www.GQIS.com
Customer: Edgen Murray Purchase Order 3568
No.: