The document outlines construction projects including the construction of a new taxiway, apron, and fillet area. It lists several construction tests and data that were carried out as part of the quality control process. These include soil testing, aggregate testing, compaction testing at different layers, mix design testing of asphalt and concrete, and daily quality control testing during construction.
The document outlines construction projects including the construction of a new taxiway, apron, and fillet area. It lists several construction tests and data that were carried out as part of the quality control process. These include soil testing, aggregate testing, compaction testing at different layers, mix design testing of asphalt and concrete, and daily quality control testing during construction.
The document outlines construction projects including the construction of a new taxiway, apron, and fillet area. It lists several construction tests and data that were carried out as part of the quality control process. These include soil testing, aggregate testing, compaction testing at different layers, mix design testing of asphalt and concrete, and daily quality control testing during construction.
TRIALL COMPACTION CBR SUB GRADE CBR ON PLACE BASE COURSE PEKERJAAAN : Pembuatan Taxiway Baru (150 m x 23 m), Apron Baru (238 m x 110 m) Dan Fillet (403,125 m2) Termasuk Marking
DATA TEST :
SONDIR DAN HAND BORING
PENGUJIAN PROPERTIES AGREGAT KEAUSAN AGREGAT TEST AWAL LABORATORIUM TRIALL COMPACTION CBR SUB GRADE JOB MIX DESIGN CTBC PENGUJIAN GEOSINTETIK MIXING CONTROL SUB BASE CBR ON PLACE SUB GRADE SANDCONE TEST TOP SUB BASE CBR ON PLACE CTBC MIXING CONTROL CTBC COMPRESSIVE STRENGTH TEST CTBC PEKERJAAAN : Pembuatan Taxiway Baru (150 m x 23 m), Apron Baru (238 m x 110 m) Dan Fillet (403,125 m2) Termasuk Marking
DATA TEST :
CBR ON PLACE SUB GRADE
CBR ON PLACE SUB BASE LAYER 1 CBR ON PLACE TOP SUB BASE MIXING CONTROL SUB BASE SANDCONE TEST TOP SUB BASE CBR ON PLACE CTBC COMPRESSIVE STRENGTH TEST CTBC PEKERJAAAN : Pembuatan Taxiway Baru (150 m x 23 m), Apron Baru (238 m x 110 m) Dan Fillet (403,125 m2) Termasuk Marking
DATA TEST :
DESIGN MIX FORMULA BETON
CBR ON PLACE SUB GRADE TAXIWAY CBR ON PLACE SUB BASE TAXIWAY HOTBIN AMP AGGREGAT TEST JOB MIX FORMULA AC JOB MIX FORMULA ATB DAILY CONTROL HOTMIX ATB DAILY CONTROL HOTMIX AC & CORE DRILL DAILY CONTROL HOTMIX ATB DAILY CONTROL HOTMIX AC & CORE DRILL CBR ON PLACE SUB GRADE TAXIWAY CBR ON PLACE SUB BASE TAXIWAY HOTBIN AMP AGGREGAT TEST JOB MIX FORMULA ATB JOB MIX FORMULA AC PEKERJAAAN : Galian dan Pembuangan Di Daerah Sisi Udara Untuk Pemantapan Lahan Disisi Udara dan Darat, 117.250 M3
DATA TEST :
DYNAMIC CONE PENETROMETER (DCP)
PEKERJAAAN : Galian dan Pembuangan Di Daerah Sisi Udara Untuk Pemantapan Lahan Disisi Udara dan Darat, 117.250 M3
DATA TEST :
DYNAMIC CONE PENETROMETER (DCP)
DYNAMIC CONE PENETROMETER PEKERJAAAN :
PEKERJAAN PEMBUATAN GSE TERMINAL BARU
DATA TEST :
PENGUJIAN PROPETIES AGREGAT
CBR SUB GRADE PENGUJIAN GEOSINTETIK CBR SUB BASE CBR BASE COURSE HOTBIN AMP AGGREGAT TEST JOB MIX FORMULA AC DAILY CONTROL HOTMIX AC & CORE DRILL PEKERJAAAN :
PEKERJAAN PEMBUATAN GSE TERMINAL BARU
DATA TEST :
PENGUJIAN PROPETIES AGREGAT
CBR SUB GRADE PENGUJIAN GEOSINTETIK PEKERJAAAN :
PEKERJAAN PEMBUATAN GSE TERMINAL BARU
DATA TEST :
CBR SUB BASE
CBR BASE COURSE HOTBIN AMP AGGREGAT TEST JOB MIX FORMULA AC DAILY CONTROL HOTMIX AC & CORE DRILL