GROUND RULE
1. ALL MOBILE PHONES SHOULD BE IN SWITCH-OFF MODE OR SILENT MODE DURING THE
SESSION
2. THIS IS A KNOLEDGE SHARING SESSION
3. ALL SHOULD RESPECT INDIVIDUALS’ VIEW
4. DOUBT (IF ANY) WILL BE CLEARED (OR TRIED TO CLEAR) ONE BY ONE
5. EVERYBODY MAY SHARE THEIR KNOW-HOW RELATED TO THE SUBJECT
6. NUMBER OF SLIDES: 27, WILL BE COVERED IN 30 TO 35 MINS (IDEAL)
M/s Nabors Rig in Kakinada Flare during Drilling operation (not during testing)
600 0 F &
above
5000 F
u-HPHT
4000 F
HPHT
3000 F
10 KP 15KP 20 KP 25 KP &
above
Challenges of HPHT Wells
• Create higher rated MWD, LWD tools and other sub-surface Drilling
and Production tools to cope up with High Pressure and High
Tempt conditions.
• Overcoming the problems encountered during Drilling
• Cementing-cement Cracking, Micro Annulus, Zonal Isolation, High
density of drilling fluid-Stability, gel formation, Loss Circulation.
Challenges of HPHT Wells (cont.)
• Down hole pressure valves (above 350 deg F)
• Materials Gap-Elastomer stability at high temp, H2S Resistant alloys with
their corresponding strength
• Well control- Unplanned Events,
Uncertainty downhole P&T
Accidental Loads
Blowouts/uncontrolled flow.
• Narrow window between Pore Pressure and Frac-Pressure
• Hydrocarbon Influx and dissolution in oil based mud.
• Design of Casing-
– Higher Strength materials
– Design code mismatch between allowable stre
Challenges of HPHT Wells (cont.)
Example
• IN THICK SALT GYPSUM FORMATION: RECOMMENDATIONS – SUITABLE
CASING SHOULD BE-TP 155 STELL GRADE
• CEMENT SLURRY - 2.4 – 2.6 GM/CC (HI-DENSITY)
• SPACER – 2.4 – 2.65 GM/CC (SALT TOLERANT)
CEMENTATION: POST CRACK DESIGN
b) API STANDARDS
d) CASING/CEMENTING
e) BOP EQUIPMENT
f) CONTAINMENT
g) INSPECTION/MECHANICAL INTEGRITY
h) ECONOMIC ANALYSIS
WELL CONTROL RULES (CONT.)