You are on page 1of 2

NGUZO ENGINEERING CALCULATION SHEET

SERVICES, P.O. BOX Project: Proposed Commercial SHEET No.


4010, NAKURU. Development
Calculations by: JMW Job No.
Done by: DKM Date
REFERENCE CALCULATIO OUTPUT
NS
Member Forces
Member Dead Load Imposed Wind Load
(KN) Load (KN) (KN)
1. Top Chord
C-1 -12 -19.4 +5.4
D-2 -11.5 -18.4 +5.4
E-5 -10.8 -17.3 +5.4
F-6 -10.2 -16.3 +5.4

2. Bottom
Chord
A-1 +10.9 +17.5 -4.7
A-3 +9.4 +15 -3.9
A-7 +6.3 +10 -2.2

3. Struts
1-2 -1.4 -2.2 +0.6
3-4 -2.7 -4.3 +1.3
5-6 -1.4 -2.2 +0.6

4. Ties
2-3 +1.6 +2.5 -0.7
4-5 +1.6 +2.5 -0.7
4-7 +3.1 +5 -1.5
6-7 +4.7 +7.5 -2.2

You might also like