ACE/TECHNICAL/DIWS*

ARSEA CONSULTING ENGINEERS SDN BHD (333114-U)


DESIGN INFORMATION WATER SUPPLY

Project: Date:
Client
Type of Design Engineer
Bu
ild
in
g

Design
No. Descriptions Remarks
Parameters

A. Design Guidelines For Water Supply - Malaysian Water Association


(MWA)
- Panduan Teknik Air JKR 92/87

B. Water Demand

B.1 Scale of Development 1 litre = 0.264 gallon


B.2 Total Water Demand 1 m3 = 264 gallon

C. Local Authority

C.1 Scale of Development


C.2 Total Water Demand Refer to Appendix `B

D. Existing Pipeline

D.1 Location

D.2 Type of Pipe


D.3 Size of Pipe (mm)

E. Pressure Head Test

E.1 Location

E.2 Fee (Rm)


E.3 Pressure Available (meter/bar) 10m = 1 bar

F. Incoming Pipe

F.1 Location
F.2 Normal Tapping
F.3 Pipe Jacking

G. Distribution Pipeline

G.1 Peak flow (gallon per minute gpm) 2.5 x total water
demand (gpm)

G.2 Fire flow (gallon per minute gpm) Total water demand
(gpm)+ fire risk (gpm)
(refer Appendix `C)

G.3 Residual Head (meter)


G.3.1 Peak Flow
G.3.2 Fire Flow

A4.1 Rev 05
ACE/TECHNICAL/DIWS*

Design
No. Descriptions Remarks
Parameters

G.4 Type of pipe


G.4.1 Under Roads & Paved Area M.S Pipe/D.I Pipe D.I Pipe
G.4.2 Marrine Area D.I Pipe D.I Pipe
G.4.3 Incoming M.S/ D.I Pipe D.I Pipe
G.4.4 Others HDPE

G.5 Pipe Coefficient


G.5.1 M.S Pipe G.5.1 110
G.5.2 D.I Pipe G.5.2 110
G.5.3 HDPE G.5.3 - 130

G.6 Minimum Cover - 1.2m for pipes buried at


the side and under road
- 0.9m for pipes buried in
ground, away from roads
H. Distribution System

H.1 Residual Head (meter) Required Elevated Water Tank

H.2 Pumping System Running Hours (hours) 12 hours

H.3 Suction Tank (capacity from total water


demand)
H.4 Elevated water tank capacity from total
water demand
H.5 Suction Tank
H.5.1 Type
H.5.2 Size

H.5.3 Capacity Gallons/day


H.6 Elevated Water Tank
H.6.1 Type
H.6.2 Size

H.6.3 Capacity Gallons/day


H.6.4 Height of Elevated Structure Highest supply level +
minimum residual
head + losses
I. Submission

I.1 Submission level

J. Contribution

J.1 Constribution fees (RM) Determine by local Authority

K. Approval Validity

K.1 Approval Validity (years) 2 years

L. Design Software CASIO Software for Hardys Cross Method


pipe network (loop)
analysis

No. Appendix A Appendix B


Water Demand Local Authority

A4.2 Rev 05
ACE/TECHNICAL/DIWS*

1. Low Cost Terrace = 1135 lpd (250 Johor - Syarikat Air Johor (SAJ)
House /Flat gpd) Holdings
2. Single Storey Melaka Sdn Bhd
Terrace / Low = 1360 lpd (300 Negeri - Perbadanan Air Melaka
Medium & Medium gpd) Sembilan - Jabatan Bekalan air negeri
3. Costs Flats Selangor sembilan
Double Storey - Syarikat Bekalan Air Selangor
Terrace House/High = 1590 lpd (350 Perak Sdn Bhd
4. Cost Flats gpd) Pulau Pinang - Lembaga Air Perak
Semi Detached Kedah - Perbadanan Air Pulau Pinang
5. House - Jabatan Bekalan Air Negeri
Bungalow / = 1820 lpd (400 Perlis Kedah
6. Condominiums gpd) - Jabatan Bekalan Air Negeri
Shophouse (Single Pahang Perlis
7. Storey)/ Gerai = 2270 lpd - Jabatan Bekalan Air Negeri
Shophouse (Double (500gpd) Terengganu Pahang
8. Storey) Kelantan - Syarikat Air Terengganu
Shophouse (Three = 2270 lpd (500 Sabah - Syarikat Air Kelantan
9. Storey) gpd) Sarawak - Lembaga Air Sabah
Light Industrial - Lembaga Air Sarawak
10. Workshop = 2730 lpd (600
Semi Detached / gpd)
11. Bungalow
Workshops = 4090 lpd (900
12. Heavy Industry gpd)

13. Medium Industry = 1590 lpd (350


gpd)
14. Light Industry
= 2730 lpd (600
Office / Complex / gpd)
15. Commercial
(Domestic Usage) = 65,000 l/ha/day
Hotels (with dining (6,000 gal/acre/day)
and laundry facility = 50,000 l/ha/day
Demestic Usage) (4,500 gal/acre/day)
Hotel (3 star) = 33,000 l/ha/day
(3,000 gal/acre/day)
16. Hotel (5 star) = 1,200
lpd/100Sq.M
Schools /Education (250gpd/1,000
Institutions sq.ft.)
-Day School /
Institution
17. - Fully Residential

18. Hospitals (domestic 1,360 lpd/room


usage) (300 gpd /room)
19. Mosque (domestic 2,000 lpd/room
usage) (440
20. Other place of gpd/room)
worship
21. Wet Market
55 lpd / student (12
Petrol Kiosk gpd / student)
360 lpd / student
(80 gpd / student)
1,100 lpd / bed
(240 gpd / bed)
135 lpd / person (12
gpd / person)
55 lpd / person ( 12
gpd / person)

A4.3 Rev 05
ACE/TECHNICAL/DIWS*

820 lpd / store (180


gpd / store)
5000 lpd / service
bay (1080gpd /
service bay)

No. Appendix A Appendix B


Water Demand Local Authority
22. Stadium 55 lpd / person ( 12
gpd / person )
23. Golf Course 5500 lpd / hole
(1200 gpd / hole )

Note:- gpd = Gallon per day


lpd = Liter per day
l/ha/day = Liter/hectares/day

Appendix C
FIRE RISK

Average Total Flow Maximum No. Of.


( Litres ) Spanning Hydrant
( Per Minute ) (Meters ) Outlets Used
Simultaneously

Class A Risk

Large buildings, shopping


complexes, high rise
buildings, large industrial 4100 90 3@ 1370 1 pm
estate, warehouse and
ports.

Class B Risk
2700 90 2 @ 1370 1 pm
Congested areas with
buildings up to 5 storeys.

Class C Risk

Shophouse up to 3 storey, 1370 90 1


light industry

Class D Risk
1140 120-terrace 1
Residential terrace house, 150-detached /
detached, semi detached semi detached

Class E Risk
680 180 1
Others

A4.4 Rev 05