PROJECT DESCRIPTION
No :
Case : Project Specification
Perencanaan UNIT Berdasarkan Project Target Over Burden ( OB ) dan Coal Hauling/Getting ( CH )
Unit Plann based on Overburden and Coal Hauling/Getting Project Target
C. Unit Pendukung
Support Unit
1. Loader : 2 Pcs
2. Grader : 3 Pcs
3. Compactor : 2 Pcs
4. Light Vehicle : 5 Pcs
Page 2 of 10
1. D A T A U M U M
GENERAL INFORMATION
Page 3 of 10
2. PERALATAN YANG DIPERLUKAN
REQUIRED EQUIPMENT
Page 4 of 10
3. KAPASITAS PRODUKSI UNIT OVERBURDEN
OVERBURDEN UNIT PRODUCTION CAPACITY
Page 5 of 10
4. KAPASITAS PRODUKSI UNIT HAULING BATUBARA
COAL HAULING UNIT PRODUCTION CAPACITY
Page 6 of 10
5. ESTIMASI BIAYA SELURUH UNIT
ALL UNIT COST ESTIMATION
Page 7 of 10
6. ANALISIS BIAYA UNIT OVERBURDEN
OVERBURDEN UNIT COST ANALYSIS
Page 8 of 10
7. ANALISIS BIAYA UNIT HAULING BATUBARA
COAL HAULING UNIT COST ANALYSIS
Page 9 of 10
9. ANALISIS INVESTASI DAN LABA RUGI
ANALYSIS OF INVESTMENT AND PROFIT LOSS
NOTE:
1 Caloric Value 5200-5600 GAR
2 Fuel Price Rp 15.000
3 Coal Price Rp 600.000
4 Unit Owning Status Rental
NOTE:
1 If the Stripping Ratio is less than 1 : 4 then the production result will increase+ 20 % (Vice Versa)
2 Income / profit will be increased when the price of coal will rise by Lab Speck. (vice versa)
Page 10 of 10