Professional Documents
Culture Documents
a) Inside ceiling & wall with two coat plastic emulsion 2250.00 9.00 Sft 20250.00
over full putty.
13 Weathering course (surki and lime concrete laid to 150.00 32.00 Sft 4800.00
slopes and well consolidated with wooden knives &
top
floor finished with cm 1:5 mix )
L/
14 Supplying and fixing of MS steel balutes with top S 10000.00
wooden handrails for staircase