2 Sand filling with clear fine river sand for foundation bed and
basement 58.00 m 500.00 29,000.00
4 Flooring concrete in C.C 1:4:8 mix using with basement. 11.00 m 4000.00 44,000.00
6 R.C.C 1:2:4 for lintels, sunshades, roof slabs, waist slabs and
lofts including barbending and labour charges. 33.00 m 18500.00 610,500.00
and
13 Painting with and windows using good quality
over doors
enamel paint over one coat of
approved colour synthetic materials and
the cost of all
primer and redoxide including 44.00 m2 400.00 17,600.00
labour charges.
14 Colorwash using good quality distemper over
whitewash and including the cost of all materialstwoandcoats of
labour
charges
)Out side emulsion 132.00 m2 110.00 14,520.00
)Inside -emulsion 409.00 m2 135.00 55,215.00
W)ceiling white 69.00 m2 50.00 3,450.00
TOTAL 2,500,000.00
RUPEES TWENTY LAKHS ONLY
ENGINEER
Er
Ya
P.VASANTHA KUMAR, B.Tech A.,
Lcence Surveyor No: 68
No: 05, Ameer Complex, EVR
College Road,
Mannarpuram, Ticlty -620 020.
Mob: 93451 19605
DETAILED ESTIMATE
ESTIMATE FOR THE PROPOSED CONSTRUCTION OF A RESIDENTIAL BUILDING IN
PLOT NO: 50, S.F.NO : 94/3, SUB DIVIsION S.F.NO: 94/1A, WARD
BLOCK NO: 21,
T.S.NO: 10/1, NO : An
THANGAIYA NAGAR EXTENSION, K.SATHANO
GOLDEN ROCK ZONE, TRICHY CITY CORPORATION.
45.37 m
Say 46.00 m
3 P.C.C 1:5:10 for foundation.
11.75 m
same gty as item no 2(1)
Say 12.00 m
4 Flooring concrete in C.C 1:4:8 mix using
with basement. 1.39 m
I.00 3.81 m 2.44 m 0.15 m
a) porticoo 3.58 m 3.73 m 0.15 m 2.00 m
1.00
b) hall 2.00 3.60 m 2.74 m 0.15 m 2.96 m
c) bed 1.00 3.58 m 2.13 m 0.15 m 1.14 m
d) kitchen 0.77 m
2.00 2.13 m 1.20 m 0.15 m
e) toilet 0.15 m 0.82 m
2.00 1.83 m 1.50 m
f)verandah 2.00 1.60 m 1.50 m 0.15 m 0.72 m
9) verandah 7.50 m
Say 8.00 m
6 Brickwork in CM 1:6 mix
using with clear fine
river sand well burnt country
bricks
and labour charges.
required
I GROUND FLOOR
aall around the building
0.23 m 1.83 m 16.16 m
1.00 38.40 m 10.26 m
blonger wall 3.96 m
1.00 11.27 m 0.23 m
ccross wall 3.96 m 7.07 m
2.00 3.88 m 0.23 m
dhcross wall 6.52 m
0.23 m 3.96 m
2.00 3.58 m
e) partition wall 2.78 m
1.00 3.05 m 0.23 m 3.96 m
)plinth beam
38.40 m 0.23 m .23 2.03 m
aall around the building 1.00
b)longer wall 1.00 11.27 m 0.23 m 0.23 m 0.60 m
c)cross wall 2.00 3.88 m 0.23 m 0.23 m 0.41 m
d)cross wall 2.00 3.58 m 0.23 m 0.23 m 0.38 m
e) partition wall 1.00 3.05 m 0.23 m 0.23 m 0.16 m
1.00 2.13 m 0.23 m 0.23 m 0.11 m
partition wall 0.23 m 0.23 m 0.06 m
9 partition wall 1.00 1.20 m
1)lintel beam-G.F
a all around the building 1.00 38.40 m 0.23 m 0.23 m 2.03 m
1.00 11.27 m 0.23 m 0.23 m 0.60 m
b)longer wall
2.00 3.88 m 0.23 m 0.23 m 0.41 m
c)cross wall
dcross wall
2.00 3.58 m 0.23 m 0.23 m 0.38 m
1.00 3.05 m 0.23 m 0.23 m 0.16 m
e)partition
1.00 2.13 m 0.23 m 0.23 m 0.11 m
)partition wall 1.00 1.20 m 0.23 m 0.23 m 0.06 m
9 partition wal
15.00 1.07 m 1.07 m 0.30 m 5.15 m
h)footing 0.23 m 0.23 m 5.48 m 4.35 m
icolumn up to roof 15.00
ROOF slab
1.00 7.92 m 11.27 m 0.11 m 982 m
31.43 m
32.00 m*
Say
7 Plastering the walls of superstructure in CM
15 and including curing etc.
Out side
all around the building 4.20 m 161.28 m
1.00 38.40 m
inside G.F
3.96 m 53.70 m?
a) portico 1.00 13.56 m
3.96 m 57.93 m2
b) hall 1.00 14.63 m
3.96 m 60.98 m2
) bed
1.00 15.40 m
3.96 m 45.26 m2
d) kitchen
1.00 11.43 m 53.06 m2
e) toilet 3.96 m
2.00 6.70 m 26.53 m2
f) verandah 3.96 m
1.00 6.70 m
3.96 m 24.71 m2
9) pooja 1.00 6.24 m 56.71 m
3.96 m
h ) bed 1.00 14.32 m
Inside-G.F
1.00 3.81 m 2.44 m 9.30 m2
a) portico 3.58 m 3.73 m 13.35 m2
1.00
b) hall
2.00 3.60 m 2.74 m 19.73 m2
C) bed
1.00 3.58 m 2.13 m 7.63 m2
d) kitchen
2.00 2.13 m 1.20 m 5.11 m2
e) toilet
2.00 1.83 m 1.50 m 5.49 m
f) verandah
2.00 1.60 m 1.50 m 4.80 m2
9) verandah
50.00 m2
Say 50.00 m2
10 Floor finish with marble slab
including labour
charges.
Inside-G.F
a) portico 9.30 m
b) hal 1.00 3.81 m 2.4 m
13.35 m2
1.00 3.58 m 3.73 m
c) bed 19.73 m
2.00 3.60 m 2.74 m
d) kitchen 7.63 m2
1.00 3.58 m 2.13 m
e) toilet 5.11 m
2.00 2.13 m 20r
f) verandah 5.49 m2
2.00 1.83 m 1.50 m
9) verandah 4.80 m2
2.00 1.60 m 1.50 m
50.00 m
Say 50.00 m
11 Dadooing the toilet walls and good
appearance of glazy tiles.
b) toilet 3.05 m 40.87 m2
2.00 6.70 m
40.87 m2
41.00 m2
Say
12 Painting with over doors and windows using
good quality and approved colour synthetic
enamel paint over one coat of primer and
redoxide including the cost of all materials
and labour charges. 21 x2 42.00 m2
Say 42.00 m2