You are on page 1of 10
Submital Item Page | of = PF Price ison) lew Date 2/42 carillion! Dah Proje Prose Str Wore Centon (Qatar Le / Qatar Bung Comocny 1 Bane, Soba ‘Submittal tem No. ED oe [aig a | ‘BP-18-04-0038,0. ns & McDonnell Fe ele rere aes, Sony a ee 7 = a ee ee Reeponsible Team David James (Caron (ata) LLC / Qatar Bung Company V) Member om notes ‘c98-ca8-cq002.106-nsT-00003 Primary Response Submission Notes Dates ‘Required On ite (3) Submit ea ay cet) ‘Time (nye) ‘Submission Ove (E4) | Activity Code 2o;p2012 | ‘Wethod Satemant fo Ug of Holle Cranes Ihtp/seBbf consrvetware.com/Common/ViewDocum#MDispay ep"DacumentTy... 220°2012 ‘Submittal Item Page2 of Estimated Quantity (€2) nie c€2) ‘Ordered quantity (€2) Regd. Order Date (€2) Date Purchase Order tasued rey Purchase Order No. (E2) 1 (€2) Shipping Date (E2) EDA Teste (€2) ‘A.D.A, To site (E2) Lend Time (€2) [Document (Open [Description [bate [Sie (ca) [Re cae Sano TOG HST Gono Bl rated Satan ORTaOTAS7« secure.construcwvareconVCommon/WieDocument_ Display p?Document Ty.) 2202012 Eston Msheireb Downtown Doha (MDD) Phase-1B Sub Structure & Super Structure Works (BP-1B-04) ‘Method Statement for Use of Mobile Cranes Ls THE IneTITD STATEMENT AS TD BE CHECLEO AND RevieweD PY A CLAUTIED SARETY PRG. /orPiCER : : ag NO ti SHALL PE Auten wink Ot SEMEL OF He LIFTING TAN AND Joe SMRETY Aunuis. Fick sessment P BE CATE GoRIED feerpvine TO (Lm, MED, Wiad) Rc 30 Gee D wemiT LIST CF Lipting Hotes ARO TEST COMTIFICATES Fey THED PARTY Testing AeenCY 40 CPC D IneMRPIMATE AL comments 5.0 Tas. web SOMANENT 15 Her THE GRATECY FR THE NSTALL ATI PERITON. OF THs TOMES Document oe CQB-CQB-CQ002-LOG- Revision 1D: 00 = aoreeraorz | 00 [HBr Sttement toler of Ts shail Dovdox Ann Bate Issue | | Description ‘Prepared Checked ‘Approved =|} carillign ‘Method Statement Comment Sheet Project: I DWNT Sheet: Contract Ne: : Date: [7.2/2 NewAFCLoaRet NG IT Resumen conte Tt: Ise 9 woBud CLANes (ta AFC Log et Name teontmctos CADLLGN ORC TV ‘rund, deep excaveons/youndwastunnaing headings excesing 3 meen in | Cirle opi and conation most be revaed by an Ns Team Member IS ralatedo asbestos enol enemy anf! paces, wring conarinated —— ine eine Soon eee Anticipated start date: ‘Review By [yin [Name | Dato | Review By ‘zn [Name [Date | Cari Tipe oe einai [Y [Aer te Thing Maneoe [Eman _[ 42D] cornu Tene er oes This document acu 7HTWAF aa oo yi ‘COSHH assessment ‘Supewision = y Targa yh | a PT y a Wi rein Tern WE ‘orm | Poros wh eric atoud vienna | fp [ We owt cowry Sioa ETT Y =o , aT ‘his ecton tbs cond ree Manger: too etiod Statement Recommender Constuston otiod Staten Reconmerdes er Construction pending nepali Poseriaton Reqd o Gallon / Cent Oher a 8 shod Statement NOT Accepabe, Reaciod ad osubmie © irk This section to be completed by Safety Advisor ONLY a Method Satrint Aged fr Gendron Matted Steven Areod for Constucion pena incorpraion cemeris ad | resubnisen is Method Staterent NOT Accepiabe, Rejected and eau € 12 Mah Samco het Pasta | carillion ff 9@ Method Statement Gonivacto [Ca00T Project l Name: Employer: Garilion OBC IV ‘Assessor: Kevin Winn. ‘Authors Signature := Roferen | Project Name: Musheirsb Downtown Doha Phase 1b <7 ‘Bate: | OBI0RTOTE Date for Review: 08/07/2012 Wer | Project Address: Dohs- land, Mushoireb Project Doha, Stata of Gata. DDescripion of work to be underiaken Generic Liting Operations using Mebile Cranes. Exact location of actviy: (include skeichidrawing with grid reference) ‘Due to Site Logistics the Cranes willbe sited at diferent areas at diferent times so a Sie Plan is attached for Reference only. Soparate Lis Plans are to be carried out for All= Any Non = Generic Lifts covered inthis Method Statement Slart Date: expected date 1170272012 Duration of work: 18 months | Names Occupations of Employees involved: Garllon OBC JV and All Empinyees /Sub — Contractors “Sequence of work: To be detailed separataly and o include precautions where applicable. SEEPAGE ‘Coordinator Grane Operatr te We Delalls of Access 7 Egress: Cran mine Best routes) Piant involved: Mobile Cranes, Trales, Tracior& Trailer, Matorial Basket, Conereta Skip, waste Skip "Training requirements: Appointed person, Li’ Supervisor, Crane operator, Rigger Banks | | man to have 3 Party Accreditation along wit All Cranes Ling Accessories, ‘Any limitations J constraints / Licenses / Permits; Time Qatar ‘Crane Eniy” Form be ormarded to Time Qatar 24 hours prior to any Crane entering Ste. Coniroi measures from site specifi rsk assessments) (Include nsk assoesment raf ‘number As above, separate Li Plana) for Non ~ Ganerc Lifts, Generic Moblle Crane Fisk Assessment attached. ted tee Pueio? Moya © carillon - @ Ser ~~ Sequence of work - Bullet points possible) Fe Eaton GSC Windows Mabie Carson te Muthores Poet Phase 1 ‘ocany outing operate whieh wil nea, btm ined ong wa & fclumr shut, rrerlorcomer sta sips, bck sealing an nid ley dvs, Not. Spacte Ln Pan) fer each Grane wi bo an acconal ‘erence tore cecumeriaen fr ary Non~ Gener Ui) | > nacranes, Operators an Riggers wil bs thd pry tested & catenin esd Fe a ee een OS ae naan ore RR en ee Cane arey ony ee > nepeton a ALL Cranes &apring of detects per tus, wb noid on st Seedintet inte ins Omran reece pc nay icy rece {merci dle ao dened ants Say eheck ray wll So aseseed and ‘Tana be cone fr Seay. then he Grav mquesin we rmores Fem ‘serio un he defecve ogubmt hes Dos ropa eines by sure 2 Alling Aosta wil be canta rom a spec Liing Operation Soe with {an aloctod Compote Ser Keeper af Racords 8 artcaon willbe aatece forthe prose of Say Tours Ais > The epecon of Litig Acestoras ae chacked athe sa of ach ene he Le, woe ehetk re als card cuts ogo AlLsting Acaesorae- Gear witha rt Te Canesten wich aval mont 8 wb rem rset ea Ce ibn wer io seni, ‘cert ‘SCHEDULE ( Not Extensive) OF COMMON LIFTS LOADS TOBE LIFTED | METHOD OF RIGGING ‘Reinforcement Bundles of” Load wil be Rigged with? Teg Chain Sing witha straight bars not exceeding W.LL which is suicint to allow the lad to be the Crane Tip lod, Lifted Safely. They will be Double Wrapped to avoid slippage and choked which will eve the WL by 25% The position ofthe Lifting Points will be determined by the Rigger / Banks mn at all bundles of reinforcement are nt alvays a standard length. The centre of gravity mist be determined so the load to belied is level and the Toad evenly spread through the lifting tackle, Tag | nes wil Be used t it Reinforcement Bundles, 3 ‘minimum of Two will be use tll times and wil | De suffice in length to give the Rigger adequate | Sefey distance 135d Stet Pana? wre €aarillion - @ Pallets oF Timber, Pywood not exceeding the Crane Tip Plywood and tinber willbe rigged up bythe method of sing by Nylon Webbing Slings, The ‘number tobe sed willbe determined bythe Banks man Rigger but must be a minimum of ‘The slings will be choked around the load so that balance and stability ofthe load is ined [NO TIMBER OR OTHER SUCH MATERAIL. \WILL BE LIFTED IF THEY CONTAIN NAILS. (OR SHARPS OF ANY KIND AS THIS CAN BE LUN SAFE TO THE RIGGERS AND THE LIFTING TACKLE, \WEB SLING MUST BE IN GOOD CONDITION. ‘AND FREE FROM DEFECTS AND HAVE A VALID TEST CERTIFICATE ‘TIMBER THAT IS TOO SMALL IN LENGTH \WILL BE LIFTED BY MEANS OF A BASKET OVER SKIP ‘Baskets Skips exoeading the Crane Tip lead, | Basket oe Skip. ‘Baskets wil be Lifted with Four Lag Chains Slings complete with Master Link ae end, the ‘ter Lifting end will be complete with Screw Pin ‘Type Bow Shackles. All Lifting Atachments will be specifically designed with the correct W.LL. nd dimension’ forthe relevant Basket or Skip ( Note: All Baskets Skips shouldbe Lifted by the cores Lifting Ponts as pr the Manufacturers Specification, ) “Material Basket Skips must not be avelosded tnd all materials place within the Basket or Skip ‘must not protrude out withthe confines ofthe felevant Container “Taglines must be use a ll times to control the ‘Scaffolding tubes not ‘exceeding the Crane Tip Toad ‘Scaffolaing Tubes wl be ged up by the Method ‘of Choked Webbed Nylon Slings oF Double ‘Wrapped Chains ‘Number tobe us wil be determined by the Banks rman - Rigger but most bea minimum of two. “The sings will be eloked around the oad 30 that balance and stability ofthe load is gained, the “Tubes must be of Snir length Pe see & carillon _/ ®@ Orie Materials Ce Bais, Nails ani Water Proof Sheeting ete with no Adequat Lifting Points, not ‘exceedirg the Crane Tip Toad ‘Small Coad wil be place into a Ceificted Lifting Material Basket and corel stored, the Materials wil not exced the height ofthe Basket. Baskets willbe Lifted with Four Lag Chain Slings complet with Master Link and wil be specially designed withthe corect W.L-L end dimenson's forthe relevant Basket or Skip Pass r07 toy a TPE | wnopleiarelas insora weremtan a cower vat | t eee ‘pio ios eUORBEY 9 Da Sieg BURRS HT Rs staranma/imusrenysoujsimg ea panacea wariameieun | | € g seaman 83 UOHTHED3 quoulssessy say RN 7? ~ iran ee eS ne gn ae juoulssassy 4SIy UOTE @

You might also like