QATAR BUILDING COMPANY

CONTAINER TERMINAL 2 PROJECT 

INSPECTION REQUEST
Raised by: Issued to: IR Ref:
(QBC/SUBCON)
Contact No:

Contractor Internal Inspection Witness Point Hold Point

Location:

IR Date: IR Time: Area: Activity:

Supporting documents

MS Ref: ITP Ref: DWG Ref:

Architectural Infrastructure
Structural (STR) Civil (CIV)
(ARC)
Fire Fighting (INF)
Category: HVACl (HVA) Plumbing (PLM) Mechanical (MEC)
(FFG)
Telecommunication Electrical (ELE) Instrumentation
(TCM) (INS)

IR Description:

Mechanical Electrical Survey Civil


Clearance: Clearance: Clearance: Clearance:

CONTRACTOR:
Contractor's Initial Inspection
findings:

Outcome of Initial Inspection: Ready for verification inspection: YES NO


N/A

Performed by: Signature: Date/ Time:


Contact No:

IR Date for
SC: IR Time for SC: Raised by: Issued to: Supervising Consultant (SC)

SUPERVISING CONSULTANT (SC):


Verification Inspection This is a:
findings:
Comm
ent
Note

Status Status Status Status


Inspection Outcome: A
(Accepted) B
(Accepted with comments) C
(Revise and Resubmit) D
(Rejected)

Performed by: Signature: Date/ Time:

Co-reviewed and signed by: Signature: Date/ Time:


(if applicable)

Note: Code A: Works can proceed


Code B: Works can proceed subject to compliance with the comments
Code C: Works cannot proceed - Revise and Resubmit
Code D: IR Rejected

QBC-CT2-FM-007, Rev.1 18-Jan-2020 Page 1 of 1