Client: P

Project Name: Development of


o ISF Camp at Duhail Prelimin
nary Works D
Document No:
Phase C
CPC02-AJJV-ITP-FIR
R-13-0001

Co
ontract No: CP
PC02 R
Rev: 0

Document Title:
T Inspectio
on and Test Plan
P (ITP) for Fire
D
Date: 16/06/2013
Proteection System
m
Project Ma
anagement: En
ngineer’s Representative: Contractorr:

S
Surveillance Poiints
AJJVV AJJV Third
Refference
No
Inspection & Test cons.\\ Quality Party DAR Verification/ Qualitty
Operattion/Activity Doc
cuments
Details Subcoo (Lab) Records
n
A M
MATERIAL RE
ECEIVING
• Materials as per Approved
A
Carbon Steel pipess & fittings (Grooveed, &
C Project Sp
pecification, Material Submittaal. Not
Witne Witn
T
Threaded Ends), Reducers,
R Pipe Unio
ons, Approved d Material • Check material cerrtificates. Hold Applicc
1. Submittall, QCS 2010, • Material free of daamage & (H) ss
able
ess Approv
ved or Approved as noted
n
C
Couplings, Pipe Flaanges, Pipe Sleevees, Pipe (W) (W) RFI
S
Supports, etc. NFPA & QCDD label details and quantities
q as (N/A) (
(AJJV-RFI-00….)
per P.O. AJJV- MRIR-001

• Materials as per Approved


A
Project Sp
pecification, Material Submittaal. Not Approv
ved or Approved as noted
n
ALL types of Valv
A ves (i.e. Ball Valve,, Witne Witn
Approved d Material • Check material cerrtificates. Hold Applicc RFI
2. B
Butterfly Valve, Ch
heck Valve, Alarm m Check Submittall, QCS 2010, • Material free of daamage & (H) ss
able
ess
(
(AJJV-RFI-00….)
V
Valve, Gate Valve,, etc. (W) (W)
NFPA & QCDD label details and quantities
q as (N/A) A
AJJV- MRIR-001
per P.O.

• Materials as per Approved


A
Project Sp
pecification, Material Submittaal. Hold Not ved or Approved as noted
Approv n
Witne Witn
Approved d Material • Check material cerrtificates. Applicc RFI
3. F Hose Reel Cab
Fire binet (H) ss ess
Submittall, QCS 2010, • Material free of daamage & (W)
able
(W)
(
(AJJV-RFI-00….)
NFPA & QCDD. label details and quantities
q as (N/A) A
AJJV- MRIR-001
per P.O.

• Materials as per Approved


A
Project Sp
pecification, Material Submittaal. Hold Not ved or Approved as noted
Approv n
Witne Witn
Approved d Material • Check material cerrtificates. Applicc RFI
4. P
Portable Fire Extin
nguishers & Blankeet (H) ss ess
Submittall, QCS 2010, • Material free of daamage & (W)
able
(W)
(
(AJJV-RFI-00….)
NFPA & QCDD. label details and quantities
q as (N/A) A
AJJV- MRIR-001
per P.O.

F
Form No AJJV-IITP-F-002 Rev. 01
Page 1 of 11
Client: P
Project Name: Development of
o ISF Camp at Duhail Prelimin
nary Works D
Document No:
Phase C
CPC02-AJJV-ITP-FIR
R-13-0001

Co
ontract No: CP
PC02 R
Rev: 0

Document Title:
T Inspectio
on and Test Plan
P (ITP) for Fire
D
Date: 16/06/2013
Proteection System
m
Project Ma
anagement: En
ngineer’s Representative: Contractorr:

S
Surveillance Poiints
AJJVV AJJV Third
Refference
No
Inspection & Test cons.\\ Quality Party DAR Verification/ Qualitty
Operattion/Activity Doc
cuments
Details Subcoo (Lab) Records
n
• Materials as per Approved
A
Project Sp
pecification, Material Submittaal. Hold Not ved or Approved as noted
Approv n
Witne Witn
Approved d Material • Check material cerrtificates. Applicc RFI
5. F Department Connections
Fire (H) ss ess
Submittall, QCS 2010, • Material free of daamage & (W)
able
(W)
(
(AJJV-RFI-00….)
NFPA & QCDD. label details and quantities
q as (N/A) A
AJJV- MRIR-001
per P.O.
• Materials as per Approved
A
Fire Protection Acccessories/ Instrumeents i.e.
F Project Sp
pecification, Material Submittaal. Not ved or Approved as noted
Approv n
Witne Witn
S
Sprinklers, Drain valve/
v Test point, Pressure Approved d Material • Check material cerrtificates. Hold Applicc RFI
6. ss ess
G
Gages, Water floww switches, Supervissory, Submittall, QCS 2010, • Material free of daamage, (H)
(W)
able
(W)
(
(AJJV-RFI-00….)
e
etc. NFPA & QCDD. Labels details and quantities (N/A) A
AJJV- MRIR-001
as per P.O.
• Materials as per Approved
A
Project Sp
pecification, Material Submittaal. Not Approv
ved or Approved as noted
n
Witne Witn
Approved d Material • Check material cerrtificates. Hold Applicc
7. F
FM-200 System ss ess RFI
Submittall, QCS 2010, • Material free of daamage, (H)
(W)
able
(W) (
(AJJV-RFI-00….)
NFPA & QCDD. Labels details and quantities (N/A) A
AJJV- MRIR-001
as per P.O.

• Materials as per Approved


A
Project Sp
pecification, Material Submittaal. Not
Witne Witn
Approved d Material • Check material cerrtificates. Hold Applicc ved or Approved as noted
Approv n
8. A
Aerosol System ss ess
Submittall, QCS 2010, • Material free of daamage, (H)
(W)
able
(W)
RFI
NFPA & QCDD. Labels details and quantities (N/A) (
(AJJV-RFI-00….)
as per P.O. A
AJJV- MRIR-001

F
Form No AJJV-IITP-F-002 Rev. 01
Page 2 of 11
Client: P
Project Name: Development of
o ISF Camp at Duhail Prelimin
nary Works D
Document No:
Phase C
CPC02-AJJV-ITP-FIR
R-13-0001

Co
ontract No: CP
PC02 R
Rev: 0

Document Title:
T Inspectio
on and Test Plan
P (ITP) for Fire
D
Date: 16/06/2013
Proteection System
m
Project Ma
anagement: En
ngineer’s Representative: Contractorr:

S
Surveillance Poiints
AJJVV AJJV Third
Refference
No
Inspection & Test cons.\\ Quality Party DAR Verification/ Qualitty
Operattion/Activity Doc
cuments
Details Subcoo (Lab) Records
n

• Materials as per Approved


A
Project Sp
pecification, Material Submittaal. Not
Witn
Approved d Material • Check material cerrtificates. Witne Applicc ved or Approved as noted
Approv n
9. F Water Pump/ Motors/
Fire M Controllerrs Hold ess
Submittall, QCS 2010, • Material free of daamage, (H) ss able
(W)
RFI
NFPA & QCDD. Labels details and quantities (W) (N/A) (
(AJJV-RFI-00….)
as per P.O. A
AJJV- MRIR-001

• Materials as per Approved


A
Project Sp
pecification, Material Submittaal. Not ved or Approved as noted
Approv n
Witne Witn
F Hydrants
Fire Approved d Material • Check material cerrtificates. Hold Applicc RFI
10. ss ess
Submittall, QCS 2010, • Material free of daamage, (H)
(W)
able
(W)
(
(AJJV-RFI-00….)
NFPA & QCDD. Labels details and quantities (N/A) A
AJJV- MRIR-001
as per P.O.

B I
INSTALLATIO
ON

F
Form No AJJV-IITP-F-002 Rev. 01
Page 3 of 11
Client: P
Project Name: Development of
o ISF Camp at Duhail Prelimin
nary Works D
Document No:
Phase C
CPC02-AJJV-ITP-FIR
R-13-0001

Co
ontract No: CP
PC02 R
Rev: 0

Document Title:
T Inspectio
on and Test Plan
P (ITP) for Fire
D
Date: 16/06/2013
Proteection System
m
Project Ma
anagement: En
ngineer’s Representative: Contractorr:

S
Surveillance Poiints
AJJVV AJJV Third
Refference
No
Inspection & Test cons.\\ Quality Party DAR Verification/ Qualitty
Operattion/Activity Doc
cuments
Details Subcoo (Lab) Records
n

1. Check pipe & fittin ngs


material/ size correect as per
approved drawing..
Project Sp
pecification,
2. Check proper pipee alignment
QCS 2010 0, NFPA, Not
in horizontal/ vertiical as per Hold Witne
QCDD Sttandard, Applicc Patro
1. P
Piping Approved d Method
approved drawing.. (H) ss
able l (P)
ved or Approved as noted
Approv n
3. Check fit-up/ instaallation as (W) RFI
Statementt and (N/A) (
(AJJV-RFI-00….)
per approved Meth hod
Approved d Drawing. AJJJV-MECH-FIR-002
Statement.
4. Check bolt tightenning as per
approved Method Statement.

Project Sp
pecification,
1. Check installation
n as per
QCS 2010 0, NFPA, Not ved or Approved as noted
Approv n
approved drawing g. Hold Witne
QCDD Sttandard, Applicc Patro RFI
2. P Sleeves
Pipe Approved d Method
2. Check correct matterial & (H) ss
able l (P) (
(AJJV-RFI-00….)
sizes as per approv
ved (W)
Statementt and (N/A) AJJJV-MECH-FIR-002
drawing.
Approved d Drawing.
Project Sp
pecification, 1. Check painting ap
pplication
Approv
ved or Approved as noted
n
QCS 2010 0, NFPA, as per approved prrocedure Not
Hold Witne RFI
QCDD Sttandard, and manufacturer Applicc Patro
3. P Painting
Pipe Approved d Method instruction. (H) ss
able l (P)
(
(AJJV-RFI-00….)
(W) AJJJV-MECH-FIR-002
Statementt and 2. Check paint dry th
hickness as (N/A)
Approved d Drawing. per approved proccedure.

F
Form No AJJV-IITP-F-002 Rev. 01
Page 4 of 11
Client: P
Project Name: Development of
o ISF Camp at Duhail Prelimin
nary Works D
Document No:
Phase C
CPC02-AJJV-ITP-FIR
R-13-0001

Co
ontract No: CP
PC02 R
Rev: 0

Document Title:
T Inspectio
on and Test Plan
P (ITP) for Fire
D
Date: 16/06/2013
Proteection System
m
Project Ma
anagement: En
ngineer’s Representative: Contractorr:

S
Surveillance Poiints
AJJVV AJJV Third
Refference
No
Inspection & Test cons.\\ Quality Party DAR Verification/ Qualitty
Operattion/Activity Doc
cuments
Details Subcoo (Lab) Records
n
1. Check locations ass specified
in the approved drrawing
Project Sp
pecification, 2. Check type of valvve &
Patro
QCS 2010 0, NFPA, instruments installled FM Approv
ved or Approved as noted
n
Hold Witne Not l/
QCDD Sttandard, approved and or UL
U listed as RFI
4. V
Valves Approved d Method per approved drawwing. (H) ss Applicc Revi
(
(AJJV-RFI-00….)
(W) able ew
Statementt, Approved 3. Check each installlation as AJJJV-MECH-FIR-002
(N/A) (P/R)
Drawing per approved proccedure &
manufacturer instrruction.

Project Sp
pecification,
1. Check type, range and Patro
QCS 2010 0, NFPA, Not ved or Approved as noted
Approv n
proved
location as per app Hold Witne l/
QCDD Sttandard, Applicc RFI
5. P
Pressure Gages Approved d Method
drawing. (H) ss
able
Revi
(
(AJJV-RFI-00….)
2. Check each installlation as (W) ew
Statementt, Approved (N/A) AJJJV-MECH-FIR-002
per manufacturer instruction.
i (P/R)
Drawing

Project Sp
pecification, 1. Check each installlation/
Patro
QCS 2010 0, NFPA, location, type and Not Approv
ved or Approved as noted
n
Hold Witne l/
QCDD Sttandard, temperature ratingg correct as Applicc RFI
6. S
Sprinklers Approved d Method per approved draw wing. (H) ss
able
Revi
(
(AJJV-RFI-00….)
(W) ew
Statementt, Approved 2. Check all installation as per (N/A) AJJJV-MECH-FIR-002
(P/R)
Drawing manufacturer instrruction.

F
Form No AJJV-IITP-F-002 Rev. 01
Page 5 of 11
Client: P
Project Name: Development of
o ISF Camp at Duhail Prelimin
nary Works D
Document No:
Phase C
CPC02-AJJV-ITP-FIR
R-13-0001

Co
ontract No: CP
PC02 R
Rev: 0

Document Title:
T Inspectio
on and Test Plan
P (ITP) for Fire
D
Date: 16/06/2013
Proteection System
m
Project Ma
anagement: En
ngineer’s Representative: Contractorr:

S
Surveillance Poiints
AJJVV AJJV Third
Refference
No
Inspection & Test cons.\\ Quality Party DAR Verification/ Qualitty
Operattion/Activity Doc
cuments
Details Subcoo (Lab) Records
n

Project Sp
pecification,
Patro
QCS 2010 0, NFPA, 1. Check exact locatiion as per Not Approv
ved or Approved as noted
n
Hold Witne l/
QCDD Sttandard, approved drawing g. Applicc RFI
7. D
Drain Valve/ Test Point.
P Approved d Method 2. Check installation
n as per (H) ss
able
Revi
(
(AJJV-RFI-00….)
(W) ew
Statementt, Approved manufacturer instrruction. (N/A) AJJJV-MECH-FIR-002
(P/R)
Drawing

Project Sp
pecification,
Patro
QCS 2010 0, NFPA, 1. Check installation
n as per Not Approv
ved or Approved as noted
n
Hold Witne l/
QCDD Sttandard, manufacturer instrruction. Applicc RFI
8. F
Flow Switch & Sup
pervisory Switch Approved d Method 2. Check location as per (H) ss
able
Revi
(
(AJJV-RFI-00….)
(W) ew
Statementt, Approved approved drawing g. (N/A) AJJJV-MECH-FIR-002
(P/R)
Drawing

Project Sp
pecification,
Patro
QCS 2010 0, NFPA, 1. Check installation
n as per Not Approv
ved or Approved as noted
n
Hold Witne l/
QCDD Sttandard, manufacturer instrruction. Applicc RFI
9. F Water Hose Reel
Fire R Approved d Method 2. Check location/ ellevation as (H) ss
able
Revi
(
(AJJV-RFI-00….)
(W) ew
Statementt, Approved per approved drawwing. (N/A) AJJJV-MECH-FIR-004
(P/R)
Drawing

Project Sp
pecification, 1. Check location/ ellevation as
Patro
QCS 2010 0, NFPA, per approved drawwing. Not Approv
ved or Approved as noted
n
Hold Witne l/
QCDD Sttandard, 2. Check type and raating as per Applicc RFI
10. P
Portable Fire Extin
nguisher & Blankett Approved d Method approved drawing g. (H) ss
able
Revi
(
(AJJV-RFI-00….)
(W) ew
Statementt, Approved 3. Check installation
n as per (N/A) AJJJV-MECH-FIR-001
(P/R)
Drawing manufacturer instrruction.

F
Form No AJJV-IITP-F-002 Rev. 01
Page 6 of 11
Client: P
Project Name: Development of
o ISF Camp at Duhail Prelimin
nary Works D
Document No:
Phase C
CPC02-AJJV-ITP-FIR
R-13-0001

Co
ontract No: CP
PC02 R
Rev: 0

Document Title:
T Inspectio
on and Test Plan
P (ITP) for Fire
D
Date: 16/06/2013
Proteection System
m
Project Ma
anagement: En
ngineer’s Representative: Contractorr:

S
Surveillance Poiints
AJJVV AJJV Third
Refference
No
Inspection & Test cons.\\ Quality Party DAR Verification/ Qualitty
Operattion/Activity Doc
cuments
Details Subcoo (Lab) Records
n
Project Sp
pecification,
Patro
QCS 2010 0, NFPA, 1. Check location/ ellevation as Not Approv
ved or Approved as noted
n
Hold Witne l/
QCDD Sttandard, per approved drawwing. Applicc RFI
11. F Department Connections
Fire Approved d Method 2. Check installation
n as per (H) ss
able
Revi
(
(AJJV-RFI-00….)
(W) ew
Statementt, Approved manufacturer instrruction. (N/A) AJJJV-MECH-FIR-004
(P/R)
Drawing
1. Check system insttallation as
per approved draw wing.
2. Check system supp ports as
per manufacturer instruction.
i
Project Sp
pecification, 3. Check nozzles corrrect size
Patro
QCS 2010 0, NFPA, and location as perr approved Not Approv
ved or Approved as noted
n
Hold Witne l/
QCDD Sttandard, drawing. Applicc RFI
12. F
FM-200 System Approved d Method 4. Check detectors ty ype and (H) ss
able
Revi
(
(AJJV-RFI-00….)
(W) ew
Statementt, Approved location as per appproved (N/A) AJJJV-MECH-FIR-005
(P/R)
Drawing drawing.
5. Check control pan nel
installation as per approved
drawing and manu ufacturer
instruction.
1. Check system insttallation as
per approved draw wing.
2. Check system supp ports as
Project Sp
pecification,
per manufacturer instruction.
i Patro
QCS 2010 0, NFPA, Not Approv
ved or Approved as noted
n
3. Check nozzles corrrect size Hold Witne l/
QCDD Sttandard, Applicc RFI
13. A
Aerosol System Approved d Method
and location as perr approved (H) ss
able
Revi
(
(AJJV-RFI-00….)
drawing. (W) ew
Statementt, Approved (N/A) AJJJV-MECH-FIR-005
4. Check detectors ty ype and (P/R)
Drawing
location as per appproved
drawing.
5. Check control pan nel

F
Form No AJJV-IITP-F-002 Rev. 01
Page 7 of 11
Client: P
Project Name: Development of
o ISF Camp at Duhail Prelimin
nary Works D
Document No:
Phase C
CPC02-AJJV-ITP-FIR
R-13-0001

Co
ontract No: CP
PC02 R
Rev: 0

Document Title:
T Inspectio
on and Test Plan
P (ITP) for Fire
D
Date: 16/06/2013
Proteection System
m
Project Ma
anagement: En
ngineer’s Representative: Contractorr:

S
Surveillance Poiints
AJJVV AJJV Third
Refference
No
Inspection & Test cons.\\ Quality Party DAR Verification/ Qualitty
Operattion/Activity Doc
cuments
Details Subcoo (Lab) Records
n
installation as per approved
drawing and manu ufacturer
instruction.

Project Sp
pecification, 1. Check location as per
Patro
QCS 2010 0, NFPA, approved drawing g. Not Approv
ved or Approved as noted
n
Hold Witne l/
QCDD, Standard,
S 2. Check installation
n as per Applicc RFI
14. F Hydrants
Fire Approved d Method manufacturer instrruction. (H) ss
able
Revi
(
(AJJV-RFI-00….)
(W) ew
Statementt, Approved 3. Check Fire Hydran nt (N/A) AJJJV-MECH-FIR-004
(P/R)
Drawing accessibility.
Project Sp
pecification,
1. Check location/ ellevation as Patro
QCS 2010 0, NFPA, Not Approv
ved or Approved as noted
n
per approved drawwing. Hold Witne l/
QCDD Sttandard, Applicc RFI
15. F Water Pump/ Motor/
Fire M Controllers Approved d Method
2. Check alignment. (H) ss
able
Revi
(
(AJJV-RFI-00….)
3. Check grouts and anchor (W) ew
Statementt, Approved (N/A) AJJJV-MECH-FIR-001
bolt tightening. (P/R)
Drawing
Approv
ved or Approved as noted
n
1. Check each identiffication
Project Sp
pecification, RFI
correct as per apprroved Patro
QCS 2010 0, NFPA, Not (
(AJJV-RFI-00….)
drawing and data sheet.
s Hold Witne l/
IIdentification (Tagging/ Labeling/Flo
ow QCDD Sttandard, Applicc AJJJV-MECH-FIR-001
16. Approved d Method
2. Check installation
n as per (H) ss
able
Revi
AJJJV-MECH-FIR-002
D
Direction) approved procedurre. (W) ew
Statementt, Approved (N/A) AJJJV-MECH-FIR-004
3. Check flow directiion correct (P/R)
Drawing AJJJV-MECH-FIR-005
as per approved drrawing.

C TESTING

F
Form No AJJV-IITP-F-002 Rev. 01
Page 8 of 11
Client: P
Project Name: Development of
o ISF Camp at Duhail Prelimin
nary Works D
Document No:
Phase C
CPC02-AJJV-ITP-FIR
R-13-0001

Co
ontract No: CP
PC02 R
Rev: 0

Document Title:
T Inspectio
on and Test Plan
P (ITP) for Fire
D
Date: 16/06/2013
Proteection System
m
Project Ma
anagement: En
ngineer’s Representative: Contractorr:

S
Surveillance Poiints
AJJVV AJJV Third
Refference
No
Inspection & Test cons.\\ Quality Party DAR Verification/ Qualitty
Operattion/Activity Doc
cuments
Details Subcoo (Lab) Records
n
1. Check/ ensure insttallation
completed/ acceptted.
2. Check test medium m/ pressure
applied & holding g time as
per approved proccedure.
Project Sp
pecification,
3. Check & verify prressure ved or Approved as noted
Approv n
QCS 2010 0, NFPA, Not
gauges with valid calibration Hold Witne Witn RFI
QCDD Sttandard, Applicc
1. P
Piping Leak Test Approved d Method
certificates. (H) ss
able
ess (
(AJJV-RFI-00….)
4. Ensure isolation orr removal (W) (W) AJJJV-MECH-FIR-002
Statementt, Approved (N/A)
of any instrumentss that are AJJJV-MECH-FIR-003
Drawing
not to be part of prressure
test.
5. Check and verify all
a joints
for any leakages.

1. Check/ ensure roo om is sealed


Project Sp
pecification,
prior to testing. Patro
QCS 2010 0, NFPA, Hold Not Approv
ved or Approved as noted
n
2. Check apparatus with
w valid Witne l/
QCDD Sttandard, Applicc RFI
2. R
Room Integrity Tesst Approved d Method
calibration (i.e. Vaariable (H) ss
able
Revi
(
(AJJV-RFI-00….)
Speed Fan, Pressu ure Gages, (W) ew
Statementt, Approved (N/A) AJJJV-MECH-FIR-005
Frame Fits Door Opening,
O (P/R)
Drawing
Potable Computerr, etc.).
D C
CLEANING/ FLU
USHING

F
Form No AJJV-IITP-F-002 Rev. 01
Page 9 of 11
Client Project Management Engineer's Representative Contractor

Inspection for Fire Protection Services Installation

Development of ISF Camp at Duhail preliminary phase


Contract RFI No.:
works - CPC 02

Location/ Building Form No.: AJJV-MECH-FIR-001


Drawing No. Inspection
Date
Equipment Tag Nos.
From: To:
Fire Fighting Mechanical Installation Checklist
AJJV Const./
Sr. Item to be Checked Sub-con
AJJV QC DAR

1 Check correct & approved equipment/ materials are used.


2 Check correct Data sheet against nameplate.
3 Check/ verify Test Certificate (as applicable).
Check the Equipment condition & ALL accessories free of any
4
mechanical damages.
q p
Check material/ equipment pp
FM approved and or UL listed ((as
5
applicable).
Check Foundation/ Frame/ Anchor bolts & ready for Equipment
6
erection.
Check Equipment Isolator/ Vibration Pad installation as per
7
Manufacturer Instruction (as applicable).
8 Check Equipment installation alignment completed (as applicable).
9 Correct Shims completely installed (as applicable).
10 Check Base Grouting completed/ acceptable (as applicable).
11 Check piping interconnection & bolt tightening completed.
Check ALL necessary supporting and anchoring done as per
12
approved drawing & manufacturer instruction.
Check Final installation, orientation/ elevation acceptable as per
13
approved drawing, Project specification & manufacturer instruction.
Check installation, type and location of Portable Fire Extinguishers
14
and Fire Blanket as per approved drawing.
15 Final painting/ Touch-up painting completed (as applicable).
16 Check identification/ labeling completed.
Inspection Comments:

AJJV Sub-Contractor AJJV Construction AJJV QA/QC Engineer's Representative

Name/Signature/Date Name/Signature/Date Name/Signature/Date Name/Signature/Date


Client Project Management Engineer's Representative Contractor

Inspection for Fire Fighting Services Installation

Development of ISF Camp at Duhail preliminary phase


Contract RFI No.:
works - CPC 02
Location/ Building Form No.: AJJV-MECH-FIR-002
Pipe line Drawing No. Inspection
Date
Pipeline Services
From: To:
Fire Water Piping & Fixtures Installation Checklist
Sr. AJJV Const./
Item to be Checked AJJV QC DAR
Sub-con
1 Check correct & approved materials are used.
2 Check correct pipe size, lengths, label as per approved drawing.

3 Check pipe support/ hangers installed as per approved drawing.

4 Check installation of pipe sleeves as per approved drawing.


Check installation & location of valves (i.e. check valve, isolation
5 valve, pressure relief valve, alarm check valve, etc.) as per approved
drawing.
Check installation of instruments (i.e. Supervisory switches, Pressure
6 gauges, Alarm system, etc.) as per approve drawing and
instruction
manufacturer instruction.
7 Check Pipe alignment acceptable as per approved drawing.

8 Check installation and location of Test Point as per approved drawing.

9 Check installation of fire water drain system as per approved drawing.


Check installation of Fire water sprinklers in Type and Location as per
10
approved drawing.
Check Piping Pressure test completed/ accepted as per approved
11
procedure.
Check pipe Flushing/ Cleaning completed/ accepted as per
12
procedure.

13 Check Piping re-instatement completed after hydrotesting/ flushing.

14 Check Pipe painting completed as per approved procedure.

15 Check Tagging & Labeling of Flow direction correct.

Inspection Comments:

AJJV Sub-Constractor AJJV Construction AJJV QA/QC Engineer's Representative

Name/Signature/Date Name/Signature/Date Name/Signature/Date Name/Signature/Date


Client Project Management Engineer's Representative Contractor

Inspection for Fire Protection System


Installation
Development of ISF Camp at Duhail preliminary
Contract RFI No.:
phase works - CPC 02
Location/ Building Form No.: AJJV-MECH-FIR-003
Pipe line Drawing No.
Inspection
Pipeline Services Date
From To
PIPE PRESSURE TEST REPORT
Diameter
PIPING No. (Inch)
PIPING P&ID Remarks

Unit No.: Pipe Nominal dia/ length:


Location: Pipe Material Type:
Service: Pipe Class/ Rating:
Operating Pressure: Test Pressure:
Test Medium: Test Duration:
Pressure Gauge No.: Calibration Certificate Nos.:

Time Test Started: Time Test Completed: Total time:


ACCEPTABLE REJECT
Remarks:

AJJV Sub-Contractor AJJV Construction AJJV QA/QC Engineer's Representative

Name/Signature/Date Name/Signature/Date Name/Signature/Date Name/Signature/Date


Client Project Management Engineer's Representative Contractor

Inspection for Fire Fighting Services Installation

Development of ISF Camp at Duhail preliminary phase


Contract RFI No.:
works - CPC 02
Location/ Building Form No.: AJJV-MECH-FIR-004
Pipe line Drawing No. Inspection
Date
Pipeline Services
From: To:
Fire Water Standpipe Installation Checklist
Sr. AJJV Const./
Item to be Checked AJJV QC DAR
Sub-con
1 Check correct & approved materials are used.
2 Check FM approved/ UL listed (as applicable).
3 Check correct location as per approved drawing.

4 Check support installed as per approved drawing (as applicable).

Check operating NUT/ connection level acceptable as per approved


5
drawing and manufacturer instruction.

6 Check correct bolts and nuts installed.


Check fire department connection/ location and level as per approved
7
drawing
drawing.
Check installation and location of Fire Hose Reel as per approved
8
drawing.

9 Check correct Tagging/ Labeling as per approved drawing.

Inspection Comments:

AJJV Sub-Contractor AJJV Construction AJJV QA/QC Engineer's Representative

Name/Signature/Date Name/Signature/Date Name/Signature/Date Name/Signature/Date


Client Project Management Engineer's Representative Contractor

Inspection for Fire Fighting Services Installation

Development of ISF Camp at Duhail preliminary phase


Contract RFI No.:
works - CPC 02
Location/ Building Form No.: AJJV-MECH-FIR-005
Pipe line Drawing No. Inspection
Date
Pipeline Services
From: To:
Fire Fighting Clean Agent/ Aerosol Installation Checklist
Sr. AJJV Const./
Item to be Checked AJJV QC DAR
Sub-con
1 Check correct & approved materials are used.
2 Check material FM approved and UL listed (as applicable).
Check piping/ fittings installation and alignment as per approved
3
drawing.
4 Check piping support/ hanger installation as per approved drawing.
Check installation of pipe sleeves and sealed as per approved
5
drawing.
6 Check installation & location of Nozzles as per approved drawing.
Check installation of Dtectors, Abort Switch, Main Control Panel,
7 M
Manual lR l
Release, A
Agentt R l
Release M d l Al
Module, Alarm B ll St
Bell, b H
Strobe Horn &
Lights, etc.
8 Check Piping Leak Test comlpleted/ accepted.
Check installation of Aerosol and FM-200 Cylinder with supporting as
9
per manufacturer instruction.
Check all components (i.e. control panel, abort switch, manual
10 release, smoke detectors etc) installed as per approved drawing &
manufacturer instruction.
11 Check safety precaution signs installed.

12 Check room integrity test completed/ accepted.

13 Check Tagging & Labeling of Flow direction correct.

Inspection Comments:

AJJV Sub-Contractor AJJV Construction AJJV QA/QC Engineer's Representative

Name/Signature/Date Name/Signature/Date Name/Signature/Date Name/Signature/Date