INSPECTION AND TEST PLAN

ITP
No. PBR BME ITP PL 007 01
Project Originator Doc. Type Discipline Sequential No. Rev

Date :31.03.2023 Activity: Installation of water supply Pipes & fittings Specification : Section 04 Page N°: 1 of 2

Project Inspectio Inspection Parties / type of Inspection


Record (Internal Checking, Hold or Witness point)
Responsible Specification/ n/ Frequen
No Description of Inspection / Testing Acceptance Criteria (ICL, BME Remarks
Person Drawings’ Testing cy TR, .etc.) Consul
Reference ITL ABM
Method SE QI tant

1.0. Material Receiving Inspection


Mech. Specs All documents to have
Section Visual minimum status-B,
All -
1.1 Quantity S/C, SE No.04/appr Inspectio Approved with comments- H C/R R R
Delivery
oved shop n Incorporate and proceed
drawing with works
Mech. Specs R
Section Visual
Requirements, as specified All ICL,I
1.2 Sizes S/C, SE No.04/appr Inspectio - H C/R R
in spec Delivery R
oved shop n
drawing
R
Mech. Specs Visual
Section Inspectio
No.04/appr Requirements, as specified All ICL,I
Material confirmation to specification S/C, SE, QI n& - H C/R R
in spec Delivery R
oved Documen
material t
submittal Review
1.3
Mech. Specs
Section
No.04/appr All
SE, QI As per approved Material ICL,
Material Inspection Delivery - H C/R R W
oved Submittal MIR
material
submittal

2.0 Pipe Laying / Installation / Testing

C : Internal Checking Point S/C : Subcontractor F: Foreman


ICL : Inspection Check List PP: Pouring Permit
W : Witness Point SE : Site Engineer SO: Safety Officer
TR : Test Report V: Visual Inspection
ABBREVIATIONS: H : Hold Point QI : Quality Inspector DS: Document Submittal
ITL : Independent Testing Lab FT : Field Test
R : Review SI: Safety Inspector TF: Transmittal Form
SR : Survey Report LT : Laboratory Test
SEE: Section Engineer PW: Project Wide
INSPECTION AND TEST PLAN
ITP
No. PBR BME ITP PL 007 01
Project Originator Doc. Type Discipline Sequential No. Rev

Date :31.03.2023 Activity: Installation of water supply Pipes & fittings Specification : Section 04 Page N°: 2 of 2

Mech.
Specs
Check correct size, piping accessories and piping Section Correct size of thread rod,
No.04/app Visual During
2.1 routes, locations as per approved drawing SE/QI/F pipes, correct distance ICL,IR - H C/R W W
Inspection Installation
roved shop between two support
drawing/m
ethod
statement

Mech.
Specs 100%
Section Visual
2.2 All Valves Accessible SE/QI/F / Site requirement after ICL,IR - H C/R W W
Inspection
No.04/app Installation
roved shop
drawing

Mech.
Specs 100%
Installation of water supply pipes with valve and
Section Visual Shop Drawings / Site IR will be
`2.3 SE/QI/F after ICL,IR - H C/R W W
accessories. Inspection requirement submitted
No.04/app Installation
roved shop
drawing

Mech.
Specs 100%
Pressure testing of water supply pipes with valve Section Visual IR will be
2.4 and accessories.
SE/QI/F
Inspection
Specification after ICL,IR - H C/R W W submitted
No.04/app Installation
roved shop
drawing

C : Internal Checking Point S/C : Subcontractor F: Foreman


ICL : Inspection Check List PP: Pouring Permit
W : Witness Point SE : Site Engineer SO: Safety Officer
TR : Test Report V: Visual Inspection
ABBREVIATIONS: H : Hold Point QI : Quality Inspector DS: Document Submittal
ITL : Independent Testing Lab FT : Field Test
R : Review SI: Safety Inspector TF: Transmittal Form
SR : Survey Report LT : Laboratory Test
SEE: Section Engineer PW: Project Wide