No. PBR BME ITP PL 007 01
Project Originator Doc. Type Discipline Sequential No. Rev
Date :31.03.2023 Activity: Installation of water supply Pipes & fittings Specification : Section 04 Page N°: 1 of 2
Date :31.03.2023 Activity: Installation of water supply Pipes & fittings Specification : Section 04 Page N°: 2 of 2
Mech.
Specs
Check correct size, piping accessories and piping Section Correct size of thread rod,
No.04/app Visual During
2.1 routes, locations as per approved drawing SE/QI/F pipes, correct distance ICL,IR - H C/R W W
Inspection Installation
roved shop between two support
drawing/m
ethod
statement
Mech.
Specs 100%
Section Visual
2.2 All Valves Accessible SE/QI/F / Site requirement after ICL,IR - H C/R W W
Inspection
No.04/app Installation
roved shop
drawing
Mech.
Specs 100%
Installation of water supply pipes with valve and
Section Visual Shop Drawings / Site IR will be
`2.3 SE/QI/F after ICL,IR - H C/R W W
accessories. Inspection requirement submitted
No.04/app Installation
roved shop
drawing
Mech.
Specs 100%
Pressure testing of water supply pipes with valve Section Visual IR will be
2.4 and accessories.
SE/QI/F
Inspection
Specification after ICL,IR - H C/R W W submitted
No.04/app Installation
roved shop
drawing