You are on page 1of 4

Project Logo

Project Name : ABC PROJECT INSPECTION AND TEST PLAN


Project No. : 123-45-67 Form Ref. No. : P07-F06a / Rev. 0 / Feb. 2012 (ITP)
Client Proj. Manager Consultant Contractor

BLOCK MASONRY WORKS


gr

g bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering

Verifying Party (Legend): Verification Codes :


SC = Subcontractor H = Hold Point - Mandatory - work cannot proceed until inspection activity has been signed-off by relevant party. ITP Ref. No : Rev.
MC = Main Contractor W = Witness Point - Veryfying Party to witness. Evidence of witness shall be by signature of relevant Inspection Report.
CT = Consultant R = Review - Inspection and Test documentation to be presented to Consultant or PM for review. Date Prepared :
PM = Client or PM S = Surveillance - Monitoring of work activities, NO report required.

Item Reference Documents Frequency / Characteristics to be Verifying Party


Activity Description Acceptance Criteria / Standard Requirements Verifying Documents
No. (Specs/Procedures/Dwgs) Verified SC MC CT PM
1 MATERIAL
Shall comply with the requirement of project
specifications for the compressive strength
Material submittal for the blocks shall be approved
• Proper size.
Project Specifications section 13 by AEB.
• Uniform texture and color. Material submittal
1.1 Block QCS section 13 Part 4 Dimensions of masonry unit shall be within NA H R/S R/S
• Compressive strength Material Test certficates
tolerances of 3 mm
Blocks shall be free from cracks, splits, spalls,
chippages and other such defects

1.2 Washed sand QCS section 5 part 2 • Physical, chemical and mechanical Shall comply with QCS section 5 part2 table 2.1 Material Test Cetrficate NA R R S

QCS section 5 part 1 Test for cement fitness, soundness, strength test
• Cement finenss, soundness, strength
1.3 Cement Project sepecification section 5 and setting time should be complying with BS 4550 Manufacturers Test cetficates NA R R S
test and setting time
clause 1.2.4 for each shipment of cement.

QCS section 13 part 3


Approved Material submittal • External accessories. • All external accessories will be stainless steel.
1.4 Block work accessories Project specification section 13 • Inner accessories. • All Internal accessories will be Galvanized steel. Material inspection NA W R S
clause

2 EXECUTION

Inspection Test Plan (ITP)AEB - Construction Supervision Department Quality Forms Page 1 of 4 Form No.: P07-F06a / Rev. 0 / Feb. 2012gr
Project Logo
Project Name : ABC PROJECT INSPECTION AND TEST PLAN
Project No. : 123-45-67 Form Ref. No. : P07-F06a / Rev. 0 / Feb. 2012 (ITP)
Client Proj. Manager Consultant Contractor

BLOCK MASONRY WORKS


gr

g bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering

Verifying Party (Legend): Verification Codes :


SC = Subcontractor H = Hold Point - Mandatory - work cannot proceed until inspection activity has been signed-off by relevant party. ITP Ref. No : Rev.
MC = Main Contractor W = Witness Point - Veryfying Party to witness. Evidence of witness shall be by signature of relevant Inspection Report.
CT = Consultant R = Review - Inspection and Test documentation to be presented to Consultant or PM for review. Date Prepared :
PM = Client or PM S = Surveillance - Monitoring of work activities, NO report required.

Item Reference Documents Frequency / Characteristics to be Verifying Party


Activity Description Acceptance Criteria / Standard Requirements Verifying Documents
No. (Specs/Procedures/Dwgs) Verified SC MC CT PM
QCS section 13 part 5.3.1 • Surface area cleaning • Area must be need sound cleaning.
2.1 Surface preparation and Setting out Approved Shop drawings • Setting out • Line, length and angles etc…as per AFC drawing. Records/ Reports /RFI NA H W S

Inspection Test Plan (ITP)AEB - Construction Supervision Department Quality Forms Page 2 of 4 Form No.: P07-F06a / Rev. 0 / Feb. 2012gr
Project Logo
Project Name : ABC PROJECT INSPECTION AND TEST PLAN
Project No. : 123-45-67 Form Ref. No. : P07-F06a / Rev. 0 / Feb. 2012 (ITP)
Client Proj. Manager Consultant Contractor

BLOCK MASONRY WORKS


gr

g bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering

Verifying Party (Legend): Verification Codes :


SC = Subcontractor H = Hold Point - Mandatory - work cannot proceed until inspection activity has been signed-off by relevant party. ITP Ref. No : Rev.
MC = Main Contractor W = Witness Point - Veryfying Party to witness. Evidence of witness shall be by signature of relevant Inspection Report.
CT = Consultant R = Review - Inspection and Test documentation to be presented to Consultant or PM for review. Date Prepared :
PM = Client or PM S = Surveillance - Monitoring of work activities, NO report required.

Item Reference Documents Frequency / Characteristics to be Verifying Party


Activity Description Acceptance Criteria / Standard Requirements Verifying Documents
No. (Specs/Procedures/Dwgs) Verified SC MC CT PM
Mortar shall be mixed only as and when required
• Type of Mixing.
Shall be mixed in the relevant proportions
• Ratio of mix…and characteristic
2.2 Mortar Mixing for block work QCS section 13 part 2.2 As indicated in QCS Records/ Reports /RFI NA W S S
strength.
Mortar shall be used within 2 hours of mixing

• All blocks are to be adequately wetted with water


before they are laid
• Each block is to be adjusted to its final position in
the wall whilst the mortar is still plastic
• Walls and partitions are to be bonded or tied to
one another at junctions
• Joints and thickness of mortar. • All bed and vertical joints shall be spread fully with
QCS section 5 part 11 • Fire faces Ares block work. mortar to ensure complete and solid bedding
Project specification section 13 • Mortar filling for Hollow block. • All connections between block walls or partitions
2.3 Laying of block work part 1.3.4 • Block wall shall be reinforced as and concrete or steel columns are to be reinforced Records/ Reports /RFI NA H W S
Approved Shop Drawing indicated on drawing. at maximum 400 mm centers by means of stainless
• Reinforcement and lintel steel or zinc coated expanded metal
• 20 mm joint between the top of the wall or partition
and the soffit of the slab.
• Openings are to be square and the jambs, vertical
and formed with the uncut faces of the blocks.
• Construction tolerances shall be as per the limits
indicated in the project specification section 13 part
1.3.3

Inspection Test Plan (ITP)AEB - Construction Supervision Department Quality Forms Page 3 of 4 Form No.: P07-F06a / Rev. 0 / Feb. 2012gr
Project Logo
Project Name : ABC PROJECT INSPECTION AND TEST PLAN
Project No. : 123-45-67 Form Ref. No. : P07-F06a / Rev. 0 / Feb. 2012 (ITP)
Client Proj. Manager Consultant Contractor

BLOCK MASONRY WORKS


gr

g bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering

Verifying Party (Legend): Verification Codes :


SC = Subcontractor H = Hold Point - Mandatory - work cannot proceed until inspection activity has been signed-off by relevant party. ITP Ref. No : Rev.
MC = Main Contractor W = Witness Point - Veryfying Party to witness. Evidence of witness shall be by signature of relevant Inspection Report.
CT = Consultant R = Review - Inspection and Test documentation to be presented to Consultant or PM for review. Date Prepared :
PM = Client or PM S = Surveillance - Monitoring of work activities, NO report required.

Item Reference Documents Frequency / Characteristics to be Verifying Party


Activity Description Acceptance Criteria / Standard Requirements Verifying Documents
No. (Specs/Procedures/Dwgs) Verified SC MC CT PM

2.4 Curing and Protection QCS sction 13 part 5.15 Drying of joints • Curing shall be maintained for 3 days Records/ Reports /RFI NA W S S

Prepared by (Contractor) : Reviewed and Approved by (AEB Discipline Engineer) : Noted by (AEB-PM or RE):
Name : Name : Name :
Signature : Date : Signature : Date : Signature : Date :

Inspection Test Plan (ITP)AEB - Construction Supervision Department Quality Forms Page 4 of 4 Form No.: P07-F06a / Rev. 0 / Feb. 2012gr