You are on page 1of 4

INSPECTION AND TEST PLAN Doc. No.

: ITP-5157-02
Project : YEMEN LNG UPSTREAM PROJECT PHASE 2- YEMEN Revision : 1
Description : FABRICATION OF PIPE SPOOLS Issued Date : 12.05.2011
PO No. : 904N-TPAD-LPO-303 Dated:-02 May 2011
Mfr’s Sl. No. : -------------------- Tag no.: ---------------------
Client : Technip France Abu Dhabi Drawing No. : Various Job Card No. : 1005157
Code Of Construct :- ASME B31.3 Ed 2008
AP : Approval The related documents shall be approved. ABBREVIATIONS USED
H : Hold Point An inspection point beyond which the work cannot proceed without the attendance of designated parties. CS : Circumferential Seam
INSPECTION CODES

DRG : Drawing
M : Monitor Random check by direct or indirect inspection of an activity. IR : Inspection Report
R : Review To check specific data / documentation to determine the conformity of an item / activity. ITP : Inspection and Test Plan
LS : Long Seam
S : Surveillance To verify the surveillance of an activity.
MRIR : Material Receiving Inspection Report
SW : Sample Witness Sample witness of typical activities. MT : Magnetic Particle Examination
MTC : Material Test Certificate
W : Witness Witness of an activity required by the designated parties. However, work may proceed after getting clearance
from the concerned parties, if not witnessed at the notified time. NDE : Non Destructive Examination
PT : Dye penetrant Examination
PQR : Procedure Qualification Record
RT : Radiographic Examination

REVISION Spec. : Specifications


TDC : Technical Delivery Conditions
TI : Tech International FZC
UT : Ultrasonic Examination
WPQ : Welder Performance Qualification
WOPQ : Welding Operator Qualification Record
WPS : Welding Procedure Specification
1 Client’s comments incorporated. 12.05.2011

0 First issue. 08.05.2011

Representative Prepared by Reviewed & approved by Accepted by


QA/QC Engineer (TI) QA/QC Manager (TI) Technip
Name Aatif Naseer D.Balasubramanian
Signature

Date

Form: TI-QCM-F010 Rev. 01 Page 1 of 4


INSPECTION AND TEST PLAN Doc. No. : ITP-5157-02
Project : YEMEN LNG UPSTREAM PROJECT PHASE 2- YEMEN Revision : 1
Description : FABRICATION OF PIPE SPOOLS Issued Date : 12.05.2011
PO No. : 904N-TPAD-LPO-303 Dated:-02 May 2011
Mfr’s Sl. No. : -------------------------- Tag no.: ---------------------
Client : Technip France Abu Dhabi Drawing No. : Various Job Card No. : 1005157
Code Of Construct :- ASME B31.3 Ed 2008
Ste Reference Documents TI Technip --------- ----------
Verifying
p Description of Activity Acceptance Criteria Insp. Insp. Insp. Insp. Remarks
Standard / Specification ASME QCM Documents Sign Sign Sign Sign
no. Code Code Code Code
1 Preapproval of Quality Control Documents
1.1 Inspection and Test Plan Approved drawing - ITP Approved drawing H A

1.2 WPS / PQR Approved drawing & ASME - WPS / PQR ASME Sec. IX Ed. 2010 H A
IX
1.3 WPQ records WPS& ASME Sec. IX - WPQ ASME Sec. IX Ed. 2010 H A

1.4 NDE Procedures ASME B31.3 Ed 2008 & - NDE Procedures ASME B31.3 Ed 2008& H A
Client Specification Client Specification
1.5 Hydrostatic Testing Hydrostatic Testing - Hydrostatic Hydrostatic Testing H A
procedure procedure no. TIP-GEN-602 Testing procedure no. TIP-GEN-
Rev. 02 procedure 602 Rev. 02
Materials and Welding Consumables
2.1 Raw material inspection Bill of materials, Purchase - MTC & MRIR ASME Sec. II Part-A Ed. H R
Order & ASME Sec. II Part-A 2010
Ed. 2010
2.2 Welding consumables Purchase Order, Filler Metal - MRIR ASME Sec. II Part-C Ed. H R
Sheet & ASME Sec. II Part-C 2010
Ed. 2010
3 Fabrication
3.1 Marking ,Cutting & Edge Approved drawing - - Approved drawing H - -
preparation
3.2 Bevelling & Fit-up of Approved drawing/WPS - IR Approved drawing /WPS H R
Pipe spool
3.3 Welding of spool Approved drawing, /WPS - Weld Inspection Approved drawing /WPS H R
assembly summary record
4 NDE Examinations
4.1 % of RT as per drawing RT Procedure - RT Reports ASME B31.3 Ed 2008 H R
INS/ASMEB31.3/RT/002/Rev

Form: TI-QCM-F010 Rev. 01 Page 2 of 4


INSPECTION AND TEST PLAN Doc. No. : ITP-5157-02
Project : YEMEN LNG UPSTREAM PROJECT PHASE 2- YEMEN Revision : 1
Description : FABRICATION OF PIPE SPOOLS Issued Date : 12.05.2011
PO No. : 904N-TPAD-LPO-303 Dated:-02 May 2011
Mfr’s Sl. No. : -------------------------- Tag no.: ---------------------
Client : Technip France Abu Dhabi Drawing No. : Various Job Card No. : 1005157
Code Of Construct :- ASME B31.3 Ed 2008
Ste Reference Documents TI Technip --------- ----------
Verifying
p Description of Activity Acceptance Criteria Insp. Insp. Insp. Insp. Remarks
Standard / Specification ASME QCM Documents Sign Sign Sign Sign
no. Code Code Code Code
00

4.2 100% PT on all joints PT procedure no. - PT Reports ASME B31.3 Ed 2008 H R
TI/meTECH/P5/001 Rev. 5,
P.O. No:-9304N-TPAD-LPG-
LPO-303
4.3 MT as per drawing MT /INS/ASME - MT Reports ASME B31.3 Ed 2008 H R
B31.3.MT.002.Rev 01
5 Final Inspection & Tests
5.1 Final visual inspection of TIF/ASME/NDE/VT/001.Rev - - ASME B31.3 Ed 2008 H W
welding & finishing 003
5.2 Final Dimensional Approved Drawing - Final Dimensional Approved Drawing H W
Inspection Inspection Report
5.3 Hydrostatic test Hydrostatic Test procedure - Pressure Test ASME B31.3 Ed 2008 H W
no. TIP-GEN-602 Rev. Report
02/ASME B 31.3 Ed 2008
6 Surface Finishing
6.1 Sand blasting & Approved drawing ,,HD - - Approved drawing, H W - TP:-Final
Galvanising Galvanizing Proc No:- Galvanizing Proc No:- Inspection
DOC/UMC/PRO-001 Rev 0 & DOC/UMC/PRO-001 Rev 0
ASTM A 123 & ASTM A 123
6.2 Galvanising Report Approved drawing , - Galvanising Approved drawing ,
Galvanizing Proc No:- Report Galvanizing Proc No:-
DOC/UMC/PRO-001 Rev 0 & DOC/UMC/PRO-001 Rev
ASTM A 123 0& ASTM A 123
7 Tagging & Despatch
7.1 Tagging and Packing Approved drawing ,PO - Inspection Approved drawing,PO H M -
with Spool Number & release Note
Unit Identification

Form: TI-QCM-F010 Rev. 01 Page 3 of 4


INSPECTION AND TEST PLAN Doc. No. : ITP-5157-02
Project : YEMEN LNG UPSTREAM PROJECT PHASE 2- YEMEN Revision : 1
Description : FABRICATION OF PIPE SPOOLS Issued Date : 12.05.2011
PO No. : 904N-TPAD-LPO-303 Dated:-02 May 2011
Mfr’s Sl. No. : -------------------------- Tag no.: ---------------------
Client : Technip France Abu Dhabi Drawing No. : Various Job Card No. : 1005157
Code Of Construct :- ASME B31.3 Ed 2008
Ste Reference Documents TI Technip --------- ----------
Verifying
p Description of Activity Acceptance Criteria Insp. Insp. Insp. Insp. Remarks
Standard / Specification ASME QCM Documents Sign Sign Sign Sign
no. Code Code Code Code
7.2 Issue of Final Release Approved drawing ,PO - IRN Client Specification H H -
Note

8 Records

8.1 As-built Dossier As-built drawing, - As-built dossier Inspection/Test Report H R


specification & Purchase
Specifications
Representative Accepted by
QC Engineer (TI) QA/QC Manager (TI)
Technip
Name Aatif Naseer D.Balasubramanian
Signature
Date

Form: TI-QCM-F010 Rev. 01 Page 4 of 4