PRODUCTION TITLE: The Hit Up PRODUCTION DATES: 3/12/16, 10/12/16 DATE OF RISK ASSESSMENT: 01/12/16 Hazard Persons who Property Risk Risk Fu may be which may controls assessment ac harmed be damaged already in LOW, requ place MODERATE, cont HIGH, (see EXTREME Plan be Cars Actors Equipmen Actors HIGH Crew, actors and t and crew equipment ar crew have required to st been the pavemen made they are not aware of the caution required when shooting around roads. Cold temperatures Actors n/a Actors LOW Actors and cr and and crew are not requi crew have shot can stan been told indoors if the to wear cold. many layers of clothing. Actual harm done Actors Equipmen Actors HIGH Camera shots when carrying out and t have to be framed violent scenes crew been actors can m directed the contact m to make when acting little to scene. no contact when hitting another actor