You are on page 1of 2

FILM PRODUCTION RISK ASSESSMENT THE HIT UP

DIRECTOR: UYI IDEHEN


PRODUCTION TITLE: The Hit Up PRODUCTION DATES: 3/12/16, 10/12/16
DATE OF RISK ASSESSMENT: 01/12/16
Hazard Persons who Property Risk Risk Fu
may be which may controls assessment ac
harmed be damaged already in LOW, requ
place MODERATE, cont
HIGH, (see
EXTREME Plan
be
Cars Actors Equipmen Actors HIGH Crew, actors
and t and crew equipment ar
crew have required to st
been the pavemen
made they are not
aware of
the
caution
required
when
shooting
around
roads.
Cold temperatures Actors n/a Actors LOW Actors and cr
and and crew are not requi
crew have shot can stan
been told indoors if the
to wear cold.
many
layers of
clothing.
Actual harm done Actors Equipmen Actors HIGH Camera shots
when carrying out and t have to be framed
violent scenes crew been actors can m
directed the contact m
to make when acting
little to scene.
no
contact
when
hitting
another
actor

You might also like