BASIC FLOW DIAGRAME

INTAKE

Raw Material

CLEANING

Soil
Husk
Stone
Bolt Toor

DRYER

70 C for 13% moisture content

GRADING

1. Small Size Toor


2. Medium Size Toor
3. Bolt Size Toor

HULLING-1

1. Gotta (8-10) % 3. Dal (14-17) %


2. Toor (15-17) % 4.Touch (60-65)
%

HULLING-3
DRYER
Oil Addition

36 hr. holding time

HULLING-2

Dal 12%
Touching 80%
40 hr. holding
time

DRYER

12 hr. holding time

HULLING-3

70-80 % Gotta
20-25 % Rejection

DRYER

2 hr. drying
Addition of Water & Oil

SUN DRYING
8-12 hr. Sun
drying
SPLITTING

SORTEX

Rejection Dal
Fatka Dal
Sawa Dal

MTRA

Fatka medium
Broken ( Tukdi ) separation

POLISHING

5-6 hr. holding time

PACKING

BOPP
HDPE

STORAGE