You are on page 1of 3
Gr oe lv ea bee TREWABILITATION OF LEARING OVERHEAD WATER STORAGE TANK IN SHELL RA BASED ON CONTRAGT # NGUTOBOBEE LOCATION :SUB-STATION 4,SHELL R.A got 5M ‘DESCRIPTION ‘ary _[ UNIT [RATE (wN)_[RATE (USO) AMOUNT (WGN) [ AMOUNT (USD) 1 [MOBILISATION Induding WSSE TI site {$00,000.09} 500,000.00 2 JERECTION OF SCAFFOLD Provide and erect SPOC approved standard saffld including trained personnel and necessary pes eg Hames belt ec. The safflding components which shall conform with 8S $973 for seafoding Tubes, [ransoms, base plates, boards stress ested, access 21 fader class. 1 tot | 02,750.00 502,750.00 33 JDISMANTUNG OF EXISTING TAN Provide for manually and mechanically Tosening and Jetting ofall bolts and nuts including the stays/bracings etc. safely bring down al plates and accessories and cat 3.1_[away. 1 tank| 50,000.00} 0,000.00 “4 _ [SUPPLY OF BRACING 4 provide and fabricate 100 10010 ASA angle ion bars|_ 66 |m 20.00 1310.40 442. |Provide ad fabricate 757536 RSAanaelron mbars | 455 [ny iii, sisi 'S_ | SUPPLY OF TARK INTERNAL BRACINGS, supply internal bracings of 75x75 x6 RSA angle irom bars. Rates shall include all necessary accessories, abrications where required, abrasive blasting and 5. |fnishes with epoxy materials non bituminous EPDM. 52 [ase sm 08, 1082.55 53 [sas i [m 424 72928 54 [us 353m 38 74052 ‘6__| SUPPLY OF INTERNAL BRAGING CLEATS 1 [Provide tank internal cleats 265 | We Za Tans {6.2 [Provide tank external cleat Tor cove? 48 [or “4.00 352.00 7 [PROVIDE PRESSED STEEL PLATES provide pressed steel plates 120mm x 1220mm x Sm 7.1 |wick Horsey Bridge or other approved equivalent) 96] we 30.00 2,380.00 72 [Prowde tank cover 32 [wr 1078 56056 '& [PROVIDE STEEL GRATING. 3.1 [Provide stot grating fr tank wally Hoorng | ma Fy 307.88 2 |pRovive AND INSTALL BOLTS, NUTS AND SEALANTS Provide bolts and nuts of various sites required forthe assembly ofthe eght tanks including gasts, sealants, 08 and accessories. ll bolts shall be high frietion 9. |stiness steel bolts. 6170 | ne 100. 5170.00 110 [UPVC PINGS FABRICATION WORKS 10.1 [4° UPVC pipes 7m i m8 10.2 [a x90 degree Elbows 3 Ne 550) 4.00 10:3 [arx4" Equal Tee awe 584 584 10.4 [4* ball vale a [we 2238 2236 1035 [3° ange 3 [Ne 791 23.73 10.6 [a" Unions S| ne 2236 11.70 10,7 |a" Adaptor 3 [Ne 179 5157 111 [surety oF UPVC PIPING SUPPORT Tt [5050x-5mm ange ton 3m 229) 7s 11.2 [Fiat Bar 1a 912" «12m astm 10s 18045 fe, ee 7 6 flown wovk Coton WE Seoffel 3 og Cli =< spe [SUPPLY OF EARTHING/LIGHTING PROTECTION a2_|svsrems. 2.1 [2' Copper tarth Clamp Furze part no CRS30 i] ste [e230] e210 122 [2x 20R,schd. 40 Gabanised stoo Pipe 3 pes [694.73 38a 37 32:3 [2 Galvanized coupings 3] pes | 10535] 31605 larats Hexagonal M10 Screw Head $5140, Hexagonal 420,8ass washer Nu 167,10 Brass plain washer - 124 |wav0 4] pcs] 10535 21.40 [rats Hexagonal M2 Screw Head5150, Hexagonal hax2, Graze washer Nu 170.22 Brass Plain washer - 2s |wai70 4] pcs] 10535 421.00 ag {Wire brushing of earth terminal/iods and greasing sl peel|_ anne aan 12.7_|installation of one ightning arestor 1] we | 237039 137938 12.8 [emerald paper or dothes S| pes 27.23 236.00 12.9 [25 x 3mm Furs bare copper part no TCO30 30 we 1775] 532.50 Furse make weldabe OC tape clip use with Bare tape 25 12.10 3mm part no CwOLS 20| nw sad 168.40 urea make 3/4 earth rod Tveaded copperbond R310, length 1S00mm complete with ftings: 3/4 |oupling- C6370 and 3/4 diving stud ~ST300 wan s| nw 98.77 592.62 [Fase make gle down DC tape clip use with bare tape, 12:12 |part no GDOLS {SOpesina pack) 1| site | _2107000) 2197000 Maintenance of existing earthing Satems (ncuding sing approve instrument to carry out resistance lestrecord values before and after lmaintenance provide ful report of such activity in 2 nos Inardcopy tightening of terminal cearing of weeds 12:13 [around earth pts, et.) 1| site| 1,616.08 1,616.03 13_| WATER LEVEL INDICATOR. Provide and install Veksler Engineering make float and lbcord type water level indicator with the following [dtais;ncicator-(On guage Board, Graduation:10 mm jwide, minor marking at every 100mm in white gure of [dome height, major markings at 1000mm in white tickers of 70mm height. Float (S$ 304/316/P/Teflon, 12" OR 6" dal. Guide wire spring assembly wi'SS guide |wies 20 bow). Boottom Anchor (SS/MS Guage Board jth M5 mounting brackets, nuts, bolts, & washers Icuide wire cable tensioning Assembly) a we 25.00 25.00 15.1 [level switch 2| we [352025] 3.16050 14 [PAINTING WORK Provide and apply a coat of re oxide pant on internal 14.2 [and external tank pnels and tower completely 142” |Red enide or priming Berger /PWA paint sey] ma | 17558 Taos [Aluminium Pain for Top coat/nishing Serger FWA 143 [poi zsari| ma| 263381 782072 Provide non-toxic Btuminous paint forthe painting of 14.4 the tank inteal panels 292.16] m2 | __ 263.381 763949.10 15 _[FIING/INSTALLATION OF SUPPLIED MATERIALS 15.1 [xng/nstalation of tank internal bracing aor |-m | eae 10173376 15.2 |fuingintallaton of tank interna bracing Cleats 313 | we] 105.35 3297855, 153. [Msng/nstalation of pressed stool plates a0 we | 210.90 25,288.00 15.4 [foingnstallaton of tel grating 10| m2 | 1585.0 1656.00 15.5 |fning/nstallaton of interna ladder a ne [326750 5.26750 15.5 [fbingastallation of tel cover S| ma] 34280 43,825.60, 15.7 fuinginstallaton of water evel indicator 1] | 326750 526750 15. |fning/installaton of tank level switch 2[-n | 3267.50 103535000 15. [Fixing/nstalltion of pipes and tings 1] site | 40,000.00 40,000.00 15.10 [Fining/ineaition of pipes suppor 1 [site | 40,000.00 40,000.00 Fxing/instalation of Earthing/ighting Pretecion 1) site 15.1 [system 1.31639] 1316.38 16 [DEMOBIUSATION [Hook up tank Chirinate tankasspedied, test water |quaty and certify tank for use Osmante seafolding 161 [and remove tom sit. tank | 100,380.00 100,380.00, 16.2 [Commision and demobiise from ate ste [900,000.00 300,000.00, a7 [TOTAL 3,56,76655 | 1842720,

You might also like