PRE-COMMISSIONING REPORT O
BREAKER
MAKE :
TYPE :
HSV :
YEAR OF MFG :
SR. No. :
CURRENT RATING :
VOLTAGE RATING :
STC :
CONTROL VOLTAGE :
2.0 CHECK LIST
Page 1 of 22
SREX POWER INDIA PVT. L
PRE-COMMISSIONING REPORT O
BREAKER
SL NO CIRCUIT REFERENCE
A TRIPPING THROUGH TC
B CLOSING CIRCUIT
C BREAKER POSITION INDICATION
D HEATER IN CONTROL CUBICLE
E ILLUM. IN CONTROL CUBICLE
Page 2 of 22
SREX POWER INDIA PVT. L
PRE-COMMISSIONING REPORT O
BREAKER
PHASE
R - PH
Y - PH
B - PH
R - PHASE
>2000
BETWEEN
R - PHASE AND EARTH
Y - PHASE AND EARTH
B - PHASE AND EARTH
Page 3 of 22
SREX POWER INDIA PVT. L
PRE-COMMISSIONING REPORT O
BREAKER
BETWEEN
R - PHASE AND Y PHASE
Y - PHASE AND B PHASE
B- PHASE AND R PHASE
R-PH
22.5
10.0 REMARKS
TESTED BY
SIGNATURE :
NAME : UMAKANT
ORGANISATION : SREX POWER
Page 4 of 22
OWER INDIA PVT. LTD. DOC NO. :
PROJECT :
CUSTOMER
MISSIONING REPORT OF CIRCUIT CLIENT :
LOCATION :
EQUIPMENT IDENTIFICATION :
DATE OF TESTING :
SCHNEIDER
HVX-X
12 Kv
2015
V-7505142119-9
1600 A
11 KV
25 kA
110 V DC
STA
DESCRIPTION
YES
CLEANED AND FREE FROM DUST / DIRT FOREIGN MATERIALS ETC. YES
CTURES, MARSHALLING BOX HAS BEEN PROVIDED WITH DOUBLE EARTH YES
Page 5 of 22
OWER INDIA PVT. LTD. DOC NO. :
PROJECT :
CUSTOMER
MISSIONING REPORT OF CIRCUIT CLIENT :
LOCATION :
EQUIPMENT IDENTIFICATION :
DATE OF TESTING :
ONTACTS AND RELAYS HAVE BEEN CLEANED AND FREE FROM RUST / DAMAGE YES
Page 6 of 22
OWER INDIA PVT. LTD. DOC NO. :
PROJECT :
CUSTOMER
MISSIONING REPORT OF CIRCUIT CLIENT :
LOCATION :
EQUIPMENT IDENTIFICATION :
DATE OF TESTING :
CLOSE TRI
38 39
38 38
37 38
BETWEEN MEASUR
>5000
>5000
>5000
Page 7 of 22
OWER INDIA PVT. LTD. DOC NO. :
PROJECT :
CUSTOMER
MISSIONING REPORT OF CIRCUIT CLIENT :
LOCATION :
EQUIPMENT IDENTIFICATION :
DATE OF TESTING :
BETWEEN MEASUR
>5000
>5000
>5000
Y-PH
23.3
Page 8 of 22
66KV/11kV Substation
SMCC
Honda Motorcycle & Scooter India Ltd
VITHALAPUR GUJRAT
VCB INCOMER
9/10/2015
STATUS REMARK
NO RECORD DEFICIENCIES, IF ANY
Page 9 of 22
66KV/11kV Substation
SMCC
Honda Motorcycle & Scooter India Ltd
VITHALAPUR GUJRAT
VCB INCOMER
9/10/2015
PERATIONAL CHECK
SERVICE
Ok
Ok
Ok
Ok
Ok
Page 10 of 22
66KV/11kV Substation
SMCC
Honda Motorcycle & Scooter India Ltd
VITHALAPUR GUJRAT
VCB INCOMER
9/10/2015
TRIP CLOSE T R I P
39 49
38 49
38 49
B - PHASE
>2000
MEASUREMENT VALUE
MOHM
MOHM
MOHM
Page 11 of 22
66KV/11kV Substation
SMCC
Honda Motorcycle & Scooter India Ltd
VITHALAPUR GUJRAT
VCB INCOMER
9/10/2015
MEASUREMENT VALUE
MOHM
MOHM
MOHM
B-PH
29.7
KV DC FOUND OK
APPROVED BY
SIGNATURE :
NAME : JIMIT DESAI
ORGANISATION : HMSI
Page 12 of 22
SREX POWER INDIA PVT. LTD.
BETWEEN TERMINALS
PRIMARY TO EARTH
PRIMARY TO CORE-1
PRIMARY TO CORE-2
5.0 SECONDARY INSULATION RESISTANCE MEASUREMENT
BETWEEN TERMINALS
CORE-1 TO CORE-2
CORE BETWEEN
CORE-1 1S1 (+VE) 1S3 (-VE)
CORE-2 2S1 (+VE) 2S3 (-VE)
1S1 TO 1S3
60 2S1 TO 2S3
1S1 TO 1S3
120 2S1 TO 2S3
TESTED BY
SIGNATURE :
NAME : UMAKANT
ORGANISATION : SREX POWER
DIA PVT. LTD. DOC NO. :
PROJECT :
PLANT/AREA :
ING REPORT OF CURRENT CLIENT :
ANSFORMER LOCATION :
EQUIPMENT IDENTIFICATION :
DATE OF TESTING :
STATUS
DESCRIPTION
YES
FREE FROM DUST / DIRT FOREIGN MATERIALS ETC. YES
ALL VISIBLE DEFECTS ON PHYSICAL INSPECTION YES
NAL CONNECTOR YES
INE GENERAL ARRANGEMENT DRAWING YES
OF CT,S ERECTED AS PER RELEVANT DRAWING. YES
ON TAGS PROVIDED AND ALL CORES ARE PROVIDED WITH YES
T FROM
M.B. ALL CT,S TO CT MB AND UP CONTROL RELAY PANEL YES
R-PH Y-PH
OK OK
OK OK
R-PH Y-PH
0.050 0.049
0.049 0.050
0.100 0.099
0.099 0.100
66KV/11kV Substation
SMCC
Honda Motorcycle & Scooter India Ltd
VITHALAPUR GUJRAT
RESISTANCE PURPOSE
METERING
PROTECTION
STATUS REMARK
NO RECORD DEFICIENCIES, IF ANY
Y-PH B-PH
OK OK
OK OK
Y-PH B-PH
0.049 0.049
0.050 0.048
0.099 0.099
0.100 0.100
Witnessed By
SIGNATURE :
NAME : JIMIT DESAI
ORGANISATION : HMSI