ACTIVITY
DATE TIME
START FILMING 12.04.17 13.00
HAZARDS HAZARDS
1 Access / egress 23 Night operations
2 Animals 24 Noise / High sound levels
3 Asbestos 25 Physical exertion /
4 Audience safety / crowds 26 Radiation
5 Cables / 27 Scaffolds / Rostra / Platforms
6 Camera cranes / jibs 28 Scenic materials
7 Compressed gas / cryogenics 29 Sp. Needs / Disabled /Elderly
8 Confined spaces 30 Sp. Visual Effects
9 Derelict Buildings 31 Stunts / Dangerous activities
10 Display screen equipment 32 Vehicles
11 Diving Operations 33 Vermin
12 Electricity / 34 Violence/ unrest
13 Explosives / pyrotechnics 35 Water
14 Fire - flammable materials etc 36 Weapons / firearms
15 First Aid requirements / 37 Working at height
16 Flying 38 Working on grid
17 Gas / LPG / bottled gas 39 Working pattern
18 Hazardous substances 40 Young people / inexperienced
19 Heat / cold extreme weather 41 Other:
20 Lasers / Strobes / bright lights 42 Slipping Tripping Falling
21 Lifting Eqt / Cranes / Fork Lift 43 Physical Exertion /
22 Manual Handling / 44 General public/Theft
PRODUCTION RISK ASSESSMENT Sheet 1 of 2
Signed:
Producer
George Payne
Date: 13.03.17
Signed:
Tutor