You are on page 1of 3

HAZARD CHECKLIST and PRODUCTION RISK ASSESSMENT

PRODUCTION COMPANY VSquad

PRODUCTION TITLE Where Is My Mind?

PRODUCER George Payne

CREW George Payne

FILMING LOCATION Worlebury Woods

DATE TIME
START FILMING 17.4.17 18.00

FINISH FILMING 17.4.17 20.00

CONTACT DETAILS

HAZARDS HAZARDS
1 Access / egress 23 Night operations
2 Animals / 24 Noise / High sound levels
3 Asbestos 25 Physical exertion /
4 Audience safety / crowds 26 Radiation
5 Cables 27 Scaffolds / Rostra / Platforms
6 Camera cranes / jibs 28 Scenic materials
7 Compressed gas / cryogenics 29 Sp. Needs / Disabled /Elderly
8 Confined spaces 30 Sp. Visual Effects
9 Derelict Buildings 31 Stunts / Dangerous activities
10 Display screen equipment 32 Vehicles
11 Diving Operations 33 Vermin
12 Electricity 34 Violence/ unrest
13 Explosives / pyrotechnics 35 Water
14 Fire - flammable materials etc / 36 Weapons / firearms
15 First Aid requirements 37 Working at height
16 Flying 38 Working on grid
17 Gas / LPG / bottled gas 39 Working pattern
18 Hazardous substances 40 Young people / inexperienced
19 Heat / cold extreme weather 41 Other:
20 Lasers / Strobes / bright lights 42 Slipping Tripping Falling /
21 Lifting Eqt / Cranes / Fork Lift 43 Physical Exertion
22 Manual Handling 44 General public/Theft
PRODUCTION RISK ASSESSMENT Sheet 1 of 2

HAZARD IDENTIFIED PEOPLE AT RISK CONTROL REMAINING


RISK LEVEL MEASURES RISK
HML

Take extra safety


Animals Cast/crew L measures not to L
disturb any animal
within the area.

Bring bottles of water


Physical exertion Cast/crew L and be aware of L
individual physical
limitations, take breaks
if needed.

Be aware of L
Slipping/Tripping/Falling Cast/crew M surroundings and walk
carefully and mindfully
around to prevent a
fall.

Be sensible and careful


Fire Cast/crew M around fire. There will L
also be alcohol at the
shoot so no alcohol
should go near the fire.
Make sure fire is fully
out before leaving
location.

I have read the above and I am happy that:

It constitutes a proper and adequate risk assessment in respect of the programme


activity and that control measures identified are sufficient to control the risks.
Adequate measures are in place to communicate the risk assessment findings and to
co-ordinate the safety arrangements of all those affected.

Signed:
Producer

George Payne

Date: 10.4.17

Signed:
Tutor

You might also like