Professional Documents
Culture Documents
DESIGN PRESENTATION
Daoust Lestage
James Corner Field Operations
Tom Leader Studio/!melk
Daoust Lestage
FROM THE CITY TO THE OBJECT
LANDSCAPE ARCHITECTURE
ARC HITECTURE
KINETIC DESI G N
ANTI-SILO THINKING
MNI WATER
+
POLIS CITY
TARGET FIELD RIVER PROMENADE
LORING PARK
NICOLLET MALL
PHILIP JOHNSON
The o n l y g o a l i s building a
b ea u ti f u l b uil d in g .
Phi l i p J o n h s o n
NEW NICOLLET
A NEW WATER & CITYSCAPE
CREATING GATEWAYS OPTIMIZING THE LAND SCAPE PRESENCE REINTERPRETING HALPRINS LEGACY
OPTIMZING THE LANDSCAPE PRESENCE
2nd Ave N
7TH ST NICOLLET
Gr
1st Ave N
BUS STATION SQUARE
an
tS
NICOLLET
t
HEN
NEPI
N AV
GATEWAY E
E E
NEW NICOLLET
2nd Ave S
3rd Ave S
Washington Ave
PUBLIC ART PIECES & INSTALLATIONS
12th St
11th St
10th St
WATER FEATURES
2nd St
3rd St
9th St
8th St
7th St
6th St
5th St
4th St
1st St
E SOLAR ELEVATORS
BUS SHELTERS
THE FRAME | HIGHLIGHTING
THE HISTORICAL FABRIC
MEANDERING STREET LIGHTING |
EMPHASIZING THE URBAN CHOREOGRAPHY
ACER FREEMANII GLEDITSIA SHADEMASTER
STREET PEDESTRIAN ADVERTISING FREEMAN MAPLE SHADEMASTER HONEYLOCUST SOLAR
LIGHTING LIGHTING COLUMN RED IN FALL YELLOW IN FALL ART PIECES ELEVATOR BUS SHELTER
STREET & STREET STREET FLAG PEDESTRIAN PEDESTRIAN & BUS ADVERTISING SEATING BIKE PLANTER GARBAGE ART
PEDESTRIAN LIGHTING LIGHTING POLE LIGHTING TREE LIGHTING SHELTER COLUMN SYSTEM RACK RECYCLING PIECES
LIGHTING & BANNER COMPOST
ACER FREEMANII GLEDITSIA SHADEMASTER GARBAGE
STREET PEDESTRIAN FREEMAN MAPLE SHADEMASTER HONEYLOCUST SOLAR ADVERTISING RECYCLING
LIGHTING LIGHTING RED IN FALL YELLOW IN FALL ELEVATOR COLUMN BUS SHELTER PLANTER COMPOST
TERRACE URBAN MARKET SEATING SYSTEM | URBAN LOUNGE
GRANITE PAVERS GRANITE PAVERS
LIGHT GREY DARK GREY CONTINOUS DRAINAGE TROUGH BIKE RACKS
NEW NICOLLET
PEDESTRIAN VIEW
NEW NICOLLET
PEDESTRIAN VIEW
SUSTAINABILITY SHOULD BE SOCIAL BEFORE BEING TECHNICAL
Create a true civic destination that brings people back to the city
Innovate
Solar elevators to access the Skyway
Solar wayfinding columns (advertising columns)
Linear drainage troughs
Continuous planting trenches
Water retention strategies within Nicollet Square
PROJECT
A unique oppor tunity to work on an iconic environment
GREATEST POSITIVE
EFFECT
Invest in quality - good design is good business
Establish the winning conditions: design budget schedule
NEXT STEPS
Creating a place for people
Establishing a continuous dialogue
PUBLIC ENGAGEMENT
A Must
LIGHT MASTS
FIRE PIT
SOCIAL SEATING
TRANSIT SHELTER
BIKE PARKING
THE NIC
GAVIIDAE II
S 4TH ST
GARDENS
SOCIAL SEATING
CYCLE TRACK
15 30 43
FIRE PIT
SIDEWALK
THE NIC
GARDENS
EXCEL
PLAZA
SIDEWALK
TRANSIT SHELTER
BIKE PARKING
LRT INTERSECTION
LRT STATION
S 5TH ST
RENAISSANCE
PLAZA
0 5 10 20 0 20 40 80
JAMES CORNER FIELD OPERATIONS TEAM
NICOLLET LIVE ZONE: S. 4TH ST - S. 5TH ST
RAISED INTERSECTION
CYCLE TRACK
TRANSIT SHELTER
BIKE PARKING
MACYS
IDS CENTER/
CRYSTAL COURT
S 6TH ST
TRANSIT SHELTER/
NEWSSTAND
SKYWAY BALCONY + FRAME
CYCLE TRACK
FARMERS MARKET
TENTS
SIDEWALK
TREE GROVES
20 30 30
CITY CENTER GAVIIDAE
SKYWAY BALCONY
+ FRAME
TREE GROVES
SIDEWALK
FARMERS MARKET
TENTS
TRANSIT SHEL-
TER/ CAF
EXTENDED TRANSIT
INTERSECTION
S 7TH ST
0 5 10 20 MACYS 0 20 40 80
JAMES CORNER FIELD OPERATIONS TEAM
NICOLLET WORK ZONE: S. 6TH ST - S. 7TH ST
LIGHT MASTS
BUS SHELTERS
WIDENED SIDEWALK
CROSSWALK
BIKE PARKING
RAISED INTERSECTION
SHELTER/ CAF
WIDENED SIDEWALK
GLOW WORM
LIGHT MASTS
YWCA
CYCLE TRACK
TRANSIT SHELTER
PEAVEY PLAZA
RESIDENTIAL
WITH RETAIL
WESTMINSTER
PRESBYTERIAN CHURCH
TYPICAL INTERSECTION
S 11TH ST
TREE GROVES
SOCIAL SEATING
+ PUBLIC ART
OUTDOOR DINING
(MAINTAIN
EXISTING CAPACITY)
RESTAURANTS
LIGHT MASTS
SIDEWALK
PEAVEY PLAZA
GLOW WORM
15 30 35
CYCLE TRACK
SIDEWALK
YWCA
OUTDOOR DINING
(MAINTAIN
EXISTING CAPACITY)
TRANSIT SHELTER
S 12TH ST
TYPICAL INTERSECTION
0 5 10 20 0 20 40 80
JAMES CORNER FIELD OPERATIONS TEAM
NICOLLET PLAY ZONE: S. 11TH ST - S. 12TH ST
SURFACE
CYCLE TRACK
UTILITY HATCH
TRENCH DRAIN
RETRACTABLE BOLLARDS
PAVERS
CONTINUOUS PLANTING TRENCH FOAM BOARD
WITH STRUCTURAL SOILS INSULATION
UTILITY CORRIDOR
GRAVEL
PEX TUBING
GRADE
6TH ST
7TH ST
SKYWAY BALCONY
SKYWAY FRAME
10TH ST
6TH ST
7TH ST
8TH ST
9TH ST
POTENTIAL ELEVATOR
FIXED SEATING
LIVE
WORK
marquette advisors
FINANCE STRATEGY + MARKET ANALYSIS
highest % of urban park land nationally our downtown has 16,464 creative employees per sq mile
#6 most culturally vital city in america highest annual volunteer rate in the nation
the triple spine
urban surface bedrock
primitive + dynamic grain
organism
playground
urban theater
organism
grain (ground plane)
6 700 sf
6,700
planters
1.6% of
nicollet
streetscape
consolidation
36 678 sf
36,678
park
18%
increase of
greenspace
rural mn prairie oak savannah
2 keep right-of-way
right of way consistent + intuitive 3 grow nicollet
increase bike access
materials
gravel custom paver type 1
custom paver type 3
rough pavers
custom paver type 2
cedar pavers
paving approach
option 1: remove subslab option 2: keep subslab
trees + plants
drainage layer
structural soil
heat exchange
unit
new york,
york ny houston tx
houston, palo alto
alto, ca
market plaza
loring plaza
gateway park
peavey plaza
live / play eat shop
loring plaza s 12th -13th street
designated
two-way
bike lanes
loring plaza
typical block s 9th -10th street
10th st s looking towards 9th st s
lighting