You are on page 1of 2

Company Overview K gSoci

Chugoku M ar ine Paint s, Lt d. [ a Y d al


  &= fEnv
n a j igrfonm
e ] felnta
Y d lJRe
] hpor
g j l t *2(0)1 2(

Process of paint production


Raw MaterialsMilling *This illustration shows the paint-making process in simplified form for ease of understanding. The actual layout differs from this illustration.

CMP has continued to provide a stable supply of highly


qualified products today through its advanced production
technologies and streamlined production facilities, thanks to Raw Materials Warehouse
its unique knowhow.

Process 1 Raw Materials


Resin, pigment and additive agents are In case of unexpected disasters,
generally major components of paint. CMP emergency drills are periodically
conducts purchasing activities considering implemented, and a fire truck
remains on stand-by.
fairness and environmental protection.
< Page 34 >
< Page 23 >

CMP is promoting the reuse of


containers of raw materials, such
as powder pigment, by shifting
from paper bags to flexible
container bags. < Page 29 >
Automated warehouse

Vernish, Solvent tank

Process 2 Mixing
Hanger conveyor Resin, pigment and solvent are mixed to Mixing tank
produce an even mill base.

CMP is taking measures to reduce emissions of


VOCs (volatile organiccompounds) and lower
the odors diffusing into neighboring areas.
< Page 29 >
3
Disperser
Process Milling
Air intake & exhaust Mill base produced at the pre-mixing
equipment process is sent to the disperser to finely
Dust collector disperse the pigment particles.

Deodrization
Equipment
Wastewater
treatment facility
Control Panel Sand Mill
Each production process is
collectively controlled.

ISO14001 certification has been obtained.


< Page 20 >
CMP keeps its factory premises clean < Page 39 >

1 )(
Company Overview K gSoci
Chugoku M ar ine Paint s, Lt d. [ a Y d al
  &= fEnv
n a j igrfonm
e ] felnta
Y d lJRe
] hpor
g j l t *2(0)1 2(

Process of paint production


BrendingShipment

Process 4 Blending
Resin, additive agents and so on are added
to the mill base, the dispersion of which is
completed. Also, the color phase is adjusted
with color materials.
Drums

Blending tank

Labeling
Filter
GHS-compatible labels are
attached. < Page 35 >

Process 5 Filtering Warehouse

Blended and toned paint is filtrated.


Filling (IBC)

Filling Process 7 Shipment


Produced paint products are transported to
shipyards, construction sites and industry product
plants, and so on to bring rich color into our lives.

Process 6 Packing
Filtrated paint is packed into a container.
Filling Process

Palletizer

IBC system
Aiming to reduce waste containers, CMP
promotes the delivery of paints with IBC tanks.
< Page17 >
Palettes
CMP is trying to change waste palettes
into valuable resources. < Page 29 >

CMP is addressing cleanup


activities outside our premises.
CMP is addressing the creation of a safe working
< Page 39>
environment. < Page 42 >

)) )*

You might also like