The assigned task given to me is about the column internals which includes

computations about column height, column diameter, and efficiency of the column. It was
quite difficult at first since the formulas are not easy to understand because it will used
other values that needs to be computed first. I have checked different formulas from
sources so as to come up with formulas needed in the computation. Also, I add various
parameters needed in column internals like plate thickness, tray spacing, and weir height
that comply to the standard used in designing the column. I know that me and partner
helped and coupled our skill just to finish the assigned task to as at the limited time.
Moreover, upon doing this design project, I have gained additional information that
broadens my knowledge in distillation.

This project design wouldnt be possible without the proper communication and
teamwork of the members of the group. Though during the time of doing this project we
have encountered problems such that time pressured and limited sources of information,
we are able to surpass it all together. One good thing about us is the willingness of
everyone to help each other prior to the assigned task I believe that every one of us put
a lot of effort and did a great on their assigned task. The views, opinions, and suggestions
of everyone in the group are highly considered just to come up with an amazing project
design.

All in all, after finishing thing project, I have come to realize that though task
component would be more important than the relationship component, both are as equally
important and match each other.