Professional Documents
Culture Documents
ITEM NO DESCRIPTION
1 14.0 MG Tank
3 5 MG Suction Tank
Sub - Total
Contingency
20,000,000.00
15,000,000.00
2,000,000.00
8,000,000.00
115,000,000.00
10,000,000.00
125,000,000.00
Budgetary Cost Estimate for R4 Water Supply System
Date: 19/10/2015
2.1 Supply and lay 1200mm Mild Steel Pipe (8500m) 34,000,000.00
Contingency 10,000,000.00