Professional Documents
Culture Documents
A Risk Analysis Based Framework for Strategic Mine Planning and M Godoy 21
Design Method and Application
Accounting for Joint Ore Supply, Metal Price and Exchange Rate S A Abdel Sabour and 29
Uncertainties in Mine Design R Dimitrakopoulos
Mining Geostatistics with the Open Source SGeMS Software and the A Boucher 59
GsTL Library
Optimal Life-of-Mine Scheduling for a Bauxite Mine M Zuckerberg, J van der Riet, 101
W Malajczuk and P Stone
Coal Mining in the Hunter Valley A Strategic Mine Planning Case C Wharton 107
Study
A New Methodology for Flexible Mine Design B Groeneveld, E Topal and 113
B Leenders
Pit Optimisation and Mine Scheduling at the Montes Claros De Gois B Y Tomaselli, E A Silva, 123
Nickel Laterite Deposit, Brazil G J de Carvalho Pereira,
J A Hilrio, M C Botelho and
P C Rodriguez
Technogenic Iron Ore Formations in Siberia as a Secondary P A Filippov, S A Neverov and 129
Resource for Production of Ferrous, Rare, Non-Ferrous and Noble A A Neverov
Metals
Stochastic Long-Term Production Scheduling of Iron Ore Deposits J Benndorf and 151
Integrating Joint Multi-Element Geological Uncertainty R Dimitrakopoulos
Cut-Off Grade Estimation Old Principles Revisited Application to J-M Rendu 173
Optimisation of Net Present Value and Internal Rate of Return
Using Grade Uncertainty to Quantify Risk in the Ultimate Pit Design S Robins 179
for the Sadiola Deep Sulfide Prefeasibility Project, Mali, West Africa
Angle Reverse Circulation Versus Blastholes in Ore Control I Douglas, B Perry, W Hardtke 193
Sampling Quality Versus Data Density A Case Study and L Allen
Impact of Bench Height, Cut-Off Grade and Production Spacing on W Hardtke, L Allen, B Perry and 199
Misclassification in Ore Control Challenges Produced by High I Douglas
Nugget, Low Continuity Ores
Reducing the Geological Risk in Mining an Orebody by Using C Kemp, P Du Pisani, A Bray 223
Borehole Radar for Strategic Mine Planning and G Chitiyo
Strategic Optimisation of a Vertical Hoisting Shaft in the Callie M G Volz, M Brazil and 235
Underground Mine D A Thomas
Optimising Value for an Underground Project Configuration T Elkington, R Durham and 241
P Myers
Classification of Mining Methods for Deep Orebodies V Oparin, A Tapsiev and 249
A Freidin
Resource Risk Quantification for a Deep Level Gold Mining T Flitton and R Peattie 257
Operation
An Application of Genetic Algorithms to the Main Ventilation System E Acua, S Hardcastle, L Fava, 263
Optimisation for Multi-Level Mine Operations The Impact of the P Dunn and S Hall
Fitness Function
Applying Sequence Optimisation Technology to Longwall Coal L Rocchi, P Carter and P Stone 271
Mining
Combining Optimisation and Simulation to Model a Supply Chain P Bodon, C Fricke, T 277
from Pit to Port Sandeman and C Stanford
Direct Net Present Value Open Pit Optimisation with Probabilistic A Richmond 285
Models
Pushback Design of Open Pit Mines Under Geological and Market C Meagher, S A Abdel Sabour 291
Uncertainties and R Dimitrakopoulos
Faulted Geological Model Simulation of the Resolution Porphyry G Verly, K Brisebois, W Hart 299
Copper Deposit and J Hammitt
Geologically Enhanced Simulation of Complex Mineral Deposits H Mustapha and 309
Through High-Order Spatial Cumulants R Dimitrakopoulos
Stochastic Mine Planning Example and Value from Integrating A Jewbali and R 321
Long- and Short-Term Mine Planning Through Simulated Grade Dimitrakopoulos
Control, Sunrise Dam, Western Australia